Post Job Free
Sign in

Electrical Project

Location:
San Francisco, CA, 94110
Posted:
August 02, 2011

Contact this candidate

Resume:

David Lotspeich

Electrical Designer

**** ******** **. #*

San Francisco, CA 94110

415-***-****

**********@***.***

EDUCATION:

Bachelor's Degree History, San Francisco State University 1998

Career Certificate in Electrical Technology, Long Beach City College 2007

SUMMARY OF EXPERIENCE:

6 years of CAD drafting and design experience in Electrical Design.

Proficient in the use of Intergraph Micro station & AutoCAD as well as 3D

modeling. Completed 360 hours of training in all phases of Electrical

Design for Petrochemical facilities. Completed Basic training in 3D

Modeling on Auto CAD MEP

SIGNIFICANT EXPERIENCE: SASCO ELECTRIC (2009 - 2011)

AUTOCAD DESIGNER

Responsible for creating construction drawings for electricians in the

field. Drawings are being produced for the installation of a hospital.

Which include the use of Autocad 2011 to produce 2D drawings as well as

making section cuts. All types of 2D drawings were produced for

installation. Conduit rack, underground conduit, device layout, lighting,

fire alarm, signal. Produced trimble drawings used to layout ceiling

devices, trapeze racks, and seismic inserts. Responsible for keeping an

accurate drawing index using Microsoft excel.

MUSTANG ENGINEERS (2008 - 2009)

ELECTRICAL DESIGNER II

General Services Engineering Project Valero St. Charles, Louisiana and Big

West Refinery Bakersfield, California (2008-2009)

During this field job assignment, I was responsible for the layout and

design of Area Classification, lighting, and one-line diagrams. All

drawings were produced using AutoCAD 2008

General Services Engineering for Shell Oil Refinery Martinez, California.

For this assignment I was responsible for producing construction for

providing 480V power for the Wharf Velocity Meter Project. Field visits

were required. Conduit routing, One line Diagrams and Panel Schedules were

produced.

General Services Engineering for Chevron Refinery Richmond, California.

Responsible for producing Conduit Plans, Lighting, and One line Diagrams

and Schematics for various projects in the Lube Oil Plant. All drawings

were produced in AutoCAD 2008

FLUOR CORP (2005-2007)

CONTROL SYSTEMS DRAFTER 3

General Services Engineering Project BP West Coast Products LLC Carson,

California

(2005-2007)

During this field job assignment, I was responsible for layout and design

of instrument cable tray plan drawings and installation details utilizing

AutoCAD. Additional responsibilities included final checking of all

instrument location and conduit routing plans, instrument and electrical

installation details, and instrument index for the Butamer Project.

Completed loop folders and instrument index for these projects as well.

Assisted with initial walk down and estimate for the Level Enhancement

Indication Project. The estimated consisted of walking down different

vessels throughout the refinery and establishing the length of conduit and

wire needed to complete the project. Provided construction support for the

FFHDS project. Assisted mechanical engineering with thermocouple interface

into an existing heater.

ELECTRICIAN

GRIFF'S ELECTRIC Signal Hill California (2004-2005)

Responsible for layout and installation of conduit and wire for lighting,

motor controls, and 3 Phase & Single phase panels. Work was performed in

hospitals and industrial locations throughout the Los Angeles area.

ELECTRICIAN

CAL PACIFIC ELECTRIC Orange, California (2004-)

Responsible for layout and installation of conduit for lighting and power

distribution for commercial projects. Work included interpretation of

blueprints and verbal instructions as well. Installed switchgear and

transformers as well. Also responsible for completing work in a safe and

neat manner.

ELECTRICIAN

MARKLE ELECTRIC CORP. Long Beach, California (2003-2004)

Performed all aspects of commercial electrical work. Installation of

lighting and convenience outlets, and transformers and underground duct

banks.

TRAINING:

360 hours of technical training in all phases of Electrical Design for

Petrochemical facilities

64 hours of technical training in 3D PDS Modeling

32 hours of technical training in Intergraph Smart Plant Instrumentation

Certified Journeyman Electrician through State of California



Contact this candidate