Role
Onsite full time during construction up to and including Validation and
commissioning phases of commercial construction projects. Assume a role in
the preconstruction phase providing input and direction in constructability
reviews. Logistics and safety planning to ensure a safe and secure jobsite.
Responsible
For all on site activities with focus on Mechanical. Plumbing .electrical
BAS. High purity water systems and fire protection installation. Overall
Supervision. Sequencing. Coordination and monitoring of work for the
Highest degree of quality and safety standards. Manage the day to day efforts
Of the mechanical contractors to include weekly coordination and pre task
meetings.
HIGHLIGHTED BUILDING PROJECTS
Pharmaceutical / Research / Laboratory Experience
Wyeth Piperacillin Manufacturing Plant Puerto Rico Date: 2005-
2006
Company: Torcon New Jersey Office
Position: Mechanical Superintendent
$103 Million dollar. 412.000 SF project consisting of site expansion and
upgrades to the manufacturing plant. Responsible for intergrading new
systems with the plants ongoing operating systems while in production. The
project consisted of class 100. Class1.000 and class 10.000 processing areas.
The mechanical portion of the project was completed 20 days ahead of
schedule.
Schering-Plough QC Plant upgrade Puerto Rico Date: 2006-
2007
Company: Torcon New Jersey Office
Position: Mechanical Superintendent
$ 11 Million dollar 31.000 SF project involving construction and upgrade to
the QC lab. Construction was critical due to the plant operating under FDA
consent decree until construction was completed and passing FDA inspection.
NIH Bayview Biomedical Research Center Baltimore MD Date: 2007-
2008
Company: Skanska New Jersey Office
Position: Mechanical Superintendent
$180 Million dollar 563.000 SF state of the art biomedical research Lab which
houses the NIH institute on ageing (NIA) and national institute on drug abuse
(NIDA). The facility contains clinical and research labs. Vivarium. Office.
Conference and lobby areas. Also constructed a independent utility plant
adjacent to the research center.
Qiagen Pharmaceutical processing Plant Germantown MD Date: 2012-
2013
Company: Skanska Rockville Office
Position: Mechanical Manager
$32 Million dollar 66.000 SF expansion that enables the company to
consolidate several key manufacturing operations and accommodate new jobs.
The expansion involved intergration of new and existing mechanical systems
while in operation. A high degree of coordination was required to intergrate
Mechanical and BAS systems during construction.
HIGHER EDUCATION EXPERIENCE
The Universities of Shady Grove Rockville MD Date: 2008-
2009
Company: Skanska Rockville Office
Position: Mechanical Manager
$49 Million Dollar198.000 SF Camille Kendall academic center multipurpose
building. The project included enhanced classrooms. Computer rooms. Open
class laboratories and related support spaces. Other areas included book
store. Lounge. Library and Telecommunications center for the whole campus.
COMMERCIAL / OFFICE EXPERIENCE
1050 Half Street Washington D.C Date: 2009-
2010
Company: Skanska Rockville Office
Position: General Superintendent
$62 Million Dollar 411.000 SF ten story class A office building in the heart of
the Capitol River waterfront. The main features are Green roof. Water
conservation equipment with energy reduction systems and controls. The
building achieved LEED gold certification.
GOVERNMENT EXPERIENCE
Adjudication activities Facility Fort Meade MD Date: 2010-
2011
Company: Skanska Rockville Office
Position: Mechanical Manager
$32 Million Dollar 151.000SF facility to allow for the colocation of 10
departments od defense and military adjudication operations under one roof.
NOAA Facility Collage Park MD Date:
2011-2012
Company: Skanska Rockville Office
Position: Mechanical Manager
$110 Million dollar 268.000 SF government facility consisting of a four story
office / Lab building including a 10.000 SF build to suite data center and a 500
seat auditorium. Installed two 1500 KW uninterrupted power supply (UPS)
systems .six power distribution (PDU) and under floor utility distribution thru
entire building. All Mission Critical systems ( Mechanical and Electrical )
were designed to satisfy government facility N+1 requirements for
redundancy.
TRAINING / EDUCATION
20 plus years in the commercial construction industry
Graduated Sheet Metal Workers local 100 apprentice program (4 Year)
Ann Arundel CC 2 years
Villanova University Masters Certificate in Applied Project Management
(PMP)
U,S Army corps of Engineers QC certification
OSHA 30 Hour Certification
State of Maryland Erosion and Sediment control Certification
U.S Navy Veteran