Srivatsavaram (Ram) Kankesh
**** ***** ** **** ***** Florida 32967 . 425-***-**** .
**********@*****.***
ENGINEER
CNC MANUFACTURING . INDUSTRIAL . MECHANICAL . QUALITY
Master of Science degrees in Industrial Engineering and Manufacturing
Engineering with over 6 years of experience in the areas of electronics
manufacturing, Industrial engineering, CNC manufacturing, program
management, staff development, supply chain support, and logistics. Solder
Certified, experienced in JSTD 001, MIL STD strong technical skills and
leadership abilities that allow me to bring cost-effective solutions to
complex industrial and manufacturing issues.
PROFESSIONAL EXPERIENCE
Industrial Engineer II
March 2013 to Current
Piper Aircraft
Vero Beach, Florida
Function as an Industrial engineer involved in product costing, performing
ergonomic assessments and calculation man hours and machine hour standards.
Versatile in Unigraphics, Baan and Team Center.
Manufacturing Engineer II
Jan 2010 to March 2013
Bridgeways Corporation
Everett, Washington
Function as a Manufacturing Engineer for this supplier of Boeing. Worked on
setting up work stations, manufacturing lines, Line balancing, Implementing
5S and lean practices, Reviewing Technical drawing and specs, Developing
Jigs and Fixtures using Solidworks and Catia, Assist in make versus buy
decisions.
Industrial Engineer II
Oct 2008 to Oct 2009
Boeing Company
Everett, Washington
Function as an Industrial engineer and solved complex problems for the
Boeing Commercial Aircraft 777 program. Ensure efficient use and
integration of facilities, equipment, materials, system and personnel and
recommended process improvements. Worked on Critical Path, Work flow for
product assembly, Process flow charts, Precedence Networks, Recovery Plans
Barcharts, Crew Cycling, Root Cause of top five travelers and various other
Manufacturing/ Industrial engineering activities
Manufacturing Engineer II
Aug 2006 to Jul 2008
Raytheon Space and Airborne Systems
Forest, MS
Promote safe working environment with zero injuries and zero lost time
accidents. Manufacturing engineer responsible for the manufacture of
electronics, and PCB boards. Met due dates for all assigned Value stream
engineering actions. Zero delinquent CA webs. Zero Delinquent out Of
Tolerance reports. Responsible for two direct reports IPT Leads from CCA 1
and CCA 2 areas and 30 Manufacturing technicians. Lead 7 R6 Sigma projects
to date and Co-Lead One resulting in cost savings of over 150k per year.
Lead Multiple Projects using Design of Experiments and Minitab. Achieved
the Silver Level certification for the Six Sigma Projects completed in
2007.Gained better understanding of surface mount, through hole technology
and test processes. Gained detailed knowledge of semi-rigid coax assembly
process. Learned how to scrub and modify assemby Instructions through PCR
process. Learned how to track defects through PQRS and VM and how to track
and improve yields. Dispositioned damaged assemblies in the Defect Review
Team area. Constantly working towards Improving Cycle Times, Reducing
Defects, Reducing Touch labor costs and Improving Test Yields.
Accomplishments for Raytheon Space and Airborne Systems
. Lead a Six Sigma Project " Coax Cable Fit Check" which reduced
Semi-Rigid coax cable manufacturing defects from 25 in 6 months to
0 in 3 months resulting in cost savings of $75,000 in 3 years
. Lead a Six Sigma Project " Operation 749" which reduced the
defects in the 749 card in Final Assembly by over 30% in 3 months
resulting in cost savings of $10,000 per year
. Lear a Six Sigma Project "Operation 372" which substantially
reduced the defects and improved the yields on the 372 card
resulting in Cost savings of $24,960 per year.
. Participated and Co-Lead a Six Sigma Project on setting up Flow
Lines, Work Flow and Work Instruction for Urgent Spares Cables
Cards which significantly reduced the defects in Cable cards.
. Lead a Six Sigma Project "6150398 Defect Reduction" that resulted
in cost savings of $16,320 per year.
. Lead a Six Sigma Project "3563083 Defect Reduction" that resulted
in cost savings of $8,640 per year.
Production Supervisor Nov 2005 to Mar 2006
Silgan Containers Milwaukee, Wisconsin
Supervise day to day production, maintenance, changeover activities in the
sheet coating and the press department. Test and Implement appropriate
inspection standards, Review SPC quality charts in Gain seeker software and
pinpoint out of control situations, and certify process capability.
Implement continuous Improvement and Kaizen philosophies in all aspects of
production. Ensure that all aspects of company quality philosophy is made
aware site wide. Analyze defects and make adjustments to production
equipment in this facility manufacturing coated and non coated sheets for
food can production. Investigate external and internal customer complaints
and provide appropriate resolution.
GENERAL ENGINEER / PROGRAM MANAGER INTERN August 2004 to August 2005
United States Department of Energy Knoxville, Tennessee
Recruited as a General Engineer (GS 9) functioning as a Program Manager
Intern. Managed critical skills and facilities infrastructure reduction
programs. Conducted contractor performance assessments and processed work
authorizations. Supervised contractors on critical skills and facilities
infrastructure reduction projects.
Accomplishments for the United States Department of Energy:
. Ensured that all critical skills staffing needs were met.
. Performed 4 contractor performance assessments and quality audits.
. Completed the microwave caster review and BWXT enhanced floor
surveillance assessment projects before deadline.
SUPPLY CHAIN & LOGISTICS ANALYST January 2004 to August 2004
Ryder Corporation El Paso, Texas
Provided supply chain support for over 300 Delphi Packard North American
suppliers. Specifically responsible for coordinating corporate logistics,
designing/engineering operational solutions for the areas of network
analysis, transportation, distribution management, analysis strategy, and
multi-client process management. Also assisted with sales, and
implementation of design and operations management.
Accomplishments for Ryder Corporation:
. Reduced unauthorized carrier shipments by over 95% resulting in a
$150,000 per month savings in shipping costs.
. Monitored carrier invoices and eliminated tariffs and surcharges
outside of contract agreements by over 90%. This effort saved the
company over $15,000 per month in non-negotiated tariffs.
INDUSTRIAL/MANUFACTURING ENGINEER / QUALITY ENGINEER II September 2000
to September 2001
Applied Materials Austin, Texas
Responsibilities for this high-tech manufacturing firm included
implementing return-to-stock stations in all clean rooms, assisting with
manufacturing projects, and addressing receiving logistics issues.
Designed and implemented more efficient floor plans for receiving,
decontamination, floor stock, de-trash, and re-supply areas. Supervised
applied materials contractors on special projects. Headed the Discrepant
Material Review Board, and served as Lead Mechanical Engineer. Developed
manufacturing process documentation and work instruction.
Srivatsavaram (Ram) Kankesh
Page 2 of 2
Accomplishments for Applied Materials:
. Located and adapted an existing conveyer system that reduced the
capital requirement for a project by $130,000.
. Revised gas line transportation methods and reduced gas line scrap
rate. This effort resulted in a savings of $70,000 per month.
ENGINEERING INTERN
May 1998 to August 1998
General Motors Delphi Saginaw, Michigan
Assisted Senior Engineers improve efficiency on projects in the wire draw
department by identifying process improvements, installing quick-change
welder pads, and designing point-of-use welder tooling. Successfully
reduced machine downtime resulting in increased productivity.
JUNIOR ENGINEER June 1985 to June 1986
Rapsri Industries Bangalore, India
Responsibilities for this precision casting manufacturer involved
supervising and coordinating hydraulic valve component production and
addressing process issues. Designed and supervised the fabrication of an
automatic shell molding machine that increased production output by 40%.
OTHER BUSINESS EXPERIENCE
REAL ESTATE AGENT / LICENSED LOAN OFFICER April 2002 to December 2003
Prudential Owens Austin, Texas
OWNER / OPERATOR September 1990 to December 1997
Cheers Billiards El Paso, Texas
EDUCATION & PROFESSIONAL DEVELOPMENT
New Mexico State University - Las Cruces, New Mexico
Master of Science in Industrial Engineering, August 2000
University of Texas at El Paso - El Paso, Texas
Master of Science in Manufacturing Engineering, December 1999
University of Wisconsin-
Six Sigma Black Belt and Green Belt Certifications May 2006
Renton Technical College
Precision CNC Machining Certificate Dec 2010
Lake Washington Technical College
Tool Design Graphics Certification August 2011
Madras University - Coimbatore, India
Bachelor of Science in Mechanical Engineering, August 1986
TECHNICAL SKILLS
Proficient with Fadal, Has VFO 3-axis, Has Vertical 4-axis with Pallet
Changer, Takisawa Fanuc Controlled 4-axis CNC machines, also proficient in
AutoCAD 2010 AutoCAD Inventor, Catia V5, Solidworks,Unigraphics, Master
Cam, Pro E, Pro Model, SAP, Baan software applications as well as Microsoft
Windows and Office operating system and C programming language.
PROFESSIONAL LICENSES & AFFILIATIONS
. Certified by the American Productivity and Inventory Control Society.
. Member of the Society of Manufacturing Engineers.
PERSONAL BACKGROUND
. Fluent in English, Spanish, and Tamil
. United States Citizen
. References available on request .