Post Job Free
Sign in

Manufacturing Quality Control

Location:
Tacoma, WA
Posted:
July 22, 2013

Contact this candidate

Resume:

RAMIRO GONZALEZ

Monroe, WA

206-***-****

****************@***.***

OBJECTIVE: A direct position where I can utilize my past experiences to help further the growth and/or

profitability of a corporation or company. I am available to relocate to any location in the U.S. and Mexico.

EDUCATION:

B.S. Mechanical Engineering, May 1989

Completed MBA, June 1992

University of California at Los Angeles (U.C.L.A.)

Graduated Magna Cum Laude with a GPA of 3.6 on a 4.0 scale

I am completely bi lingual in Spanish, speaking, writing, reading, and translating.

Training: Sanage Plant Aichi, Japan, April August 1996

I spent five months training at the Toyota Sanage Plant in Japan Learning the concepts of TPS

(Toyota Production System), Lean, Kaizen, JIT, Kanban, TPS, Poka Yoke, Jidoka, and other

processes and procedures.

Kaizen/Lean Consultant August 2012 to Present

Currently I have been teaching Kaizen/Lean processes and procedures to various local

manufacturing companies. I teach the philosophies, implementations, and applications of Kaizen

and Lean methods to help improve manufacturing and production procedures. This creates an

environment that eliminates waste, processes are improved in proficient manner, and employees are

better utilized in various departments.

I have worked in both the U.S. as well as Mexico in doing Kaizens for various manufacturing

companies. I spent four years in Mexico in the state of Sonora as well as the state of Baja,

California and I have worked to help improve production, eliminate waste, improve quality,

improve processes and procedures, doing complete floor layouts, VSM, cost analysis and

improvements, and helped the overall production for all departments which include engineering,

manufacturing, shipping and receiving, production planning, quality control.

I have worked with several Aerospace companies who are looking to reduce costs in scrap,

elimination of waste, increasing production, elimination of massive amounts of overtime, creating

an environment of good product practices. This was completed by problem definition,

documentation of current situation, visualization of ideal situation, defining measurement targets,

brainstorming, developing Kaizen plan, implementation, recording and comparing results to targets,

preparation of summary documents and creating short term action plan as well as an on going

standards and sustaining of action items.

In working with one Aerospace company in particular, the typical time from when materials were

received until released to manufacturing was 6 7 days. The goal, with the group consisting of three

QA people, two managers and three hourly employees, was to reduce it to 2 3 days. We identified

numerous changes and within my time spent there, 70% of incoming material was out of inspection

in less than three days. The results were quicker turn around on materials to the floor, employees

being promoted to higher paying jobs due to less man hours required for materials department; and

production increased due to improvements in demand and deliveries.

I developed a plan with another Aerospace company where we used Lean tactics and tools to move

from a stationary final assembly line to a pulse moving line. The program realized major reductions

in build hours and significant increases in build rates.

PROFESSIONAL EXPERIENCE:

Production Manager August 2011 to July 2012

Pathway Medical Technologies

Kirkland, WA

Responsible for supervision, leading, coordinating of (28) employees in the production and

manufacturing of Medical Device products.

Planned, controlled, and directed manufacturing operations –e.g. improve process and parts

flow, minimized inventory, improved quality and others.

Created, improved, and /or developed manufacturing standards operating procedures as

well as manufacturing engineering documentation procedures.

Planned and administered procedures and budgets, both operational and capital. Selected

and developed personnel to ensure the efficient operation of the production function.

Identified and executed continuous improvement opportunities. Manufactured product for

medical clinics, physicians, hospitals clinical trials, experimental trials as well as final

saleable product.

Initiated programs to maintain compliance of all required cGMP records including Device

History Records, Non Conforming Material Reports, Waivers, RMA Investigations and

Training Records. Also initiated/drives Demand Flow Technology and other manufacturing

lean improvement initiatives.

Planned and implemented facility changes to accommodate production needs while

working with manufacturing engineering in establishing or modifying assembly and test

techniques, manufacturing instructions, fixture design, and shop floor layouts.

Established and maintained standards labor reporting and standardized manufacturing

processes to improve volume, ensure uniform output and improve quality while directly

managing a staff of hourly and salaried employees.

Directly managed employees in multiple work centers. Actively worked with cross

functional teams to resolve issues, maintain production schedules and complete projects.

Responsibilities included interviewing, hiring and training employees; planning, assigning

and directing work; appraising performance, rewarding and disciplining employees;

addressing complaints and resolving problems; maintaining adherence to FDA/QSR/ISO

and AMO company requirements

Kaizen/Lean Consultant February 2008 to July 2011

I taught Kaizen/Lean processes and procedures to various local manufacturing companies. I teach

the philosophies, implementations, and applications of Kaizen and Lean methods to help improve

manufacturing and production procedures. This creates an environment that eliminates waste,

processes are improved in proficient manner, and employees are better utilized in various

departments.

I have worked in both the U.S. as well as Mexico in doing Kaizens for various manufacturing

companies. I spent four years in Mexico in the state of Sonora as well as the state of Baja,

California and I have worked to help improve production, eliminate waste, improve quality,

improve processes and procedures, doing complete floor layouts, VSM, cost analysis and

improvements, and helped the overall production for all departments which include engineering,

manufacturing, shipping and receiving, production planning, quality control.

Production/Manufacturing Manager

Trade Products Incorporated May 2006 to Dec 2007

Lynnwood, WA

Responsible for supervision, leading, coordinating of (40 90) employees assigned to my section/s

of the building, production, and manufacturing of Bingo products and printing paper.

Was hired on an 18 month contract to increase production, eliminate waste, develop a QC

department, create an inventory system to track all incoming and outgoing product through data

base computer and to hold all employees accountable responsible for all inventory and receiving

products coming in through shipping and receiving. All goals were accomplished in 16 months and

the final two months I spent ironing out all data base computer problems.

Developed a specific plan to oversee the current manufacturing process and increase productivity

by 80 %. This was accomplished by changing the one cell system that they had been running over

the years to a two tier cell system that I created. This almost doubled their production and

eliminated unnecessary waste; costs and most overtime yet did not increase our current employee

requirement.

Keep stock control systems up to date and planning future capacity requirements by producing

regular reports and statistics on a daily, weekly and monthly basis.

Promoted JIT and Lean Processes and Procedures so that production schedules were not only met

but exceeded schedule requirements per customer requests.

Manufacturing/Director of Operations Aug 1999 to Dec. 2005

The Boeing Company Everett and Renton, WA

Responsible for supervision, leading, coordinating of (1200) employees assigned to my section/s of

the building, production, and manufacturing of commercial aircraft. Departments responsible for

were Manufacturing, Production Planning, Shipping/Receiving, Facilities Management, Supply

Chain, Quality Control, Budget and Profit/loss Responsibility.

Was directly responsible to correct the following within a twelve month period: Increase quality,

correct OTD (On Time Delivery), reduce Waste and Scrap, correct Safety issues and correct

Attendance problems.

Directly reduced direct manufacturing costs, including but not limited to direct and indirect labor,

and product materials, by improving workflow, reducing waste, reducing "bottlenecks", improving

material utilization, improving internal project due dates to assure the meeting of customer due

dates, and improving the efficiency and effectiveness of the costs and results of production in the

Engineering, Purchasing, Prefabrication, and Production Divisions of the Company.

Improved the Company’s customer due date results, reduced aggregate inventories (including

inventories of materials, work in progress, and finished goods) by meeting or exceeding inventory

turn day goals; reduced errors in part production, establish part uniformity; and improve the quality

of finished goods. The primary goals were to reduce cycle times for inventories and still meet the

customer due dates.

Directed, coached, and counseled Manufacturing Group, the Section Leaders, and the individual

employees to focus efforts, to plan and clarify direction, and to meet or exceed specific target and

stretch goals; for establishing specific target, stretch, and other performance indicators for such

persons; and perform such other critical analysis as may be necessary to meet the Input and Output

goals, above.

I set the daily, weekly, and monthly production schedules for all product areas of the Company,

which schedule to be established through input from all managers. I worked with all sectors of the

Production Group to meet or beat the respective internal or external due dates. I chaired all daily

Production Group meetings and/or assigned a Director as chairperson, if I was not available. I set

all agendas, priorities, specific and collective assignments and established appropriate standards

for accountability, and if necessary, took specific steps to enforce that accountability related to all

employees under the my direction and control.

Review reports for production, operations, and directed the final evolvements of expenditures for

all of our operation costs, repair & overhaul and maintenance problems to ensure costs were kept at

a minimum for the prevention of production, manufacturing and operational delays.

Skilled in deploying lean manufacturing tools such as KanBan, Standard work, SMED, Value

Stream, etc.

Promoted JIT and Lean Processes and procedures so that production schedules were not only met

but e exceeded schedule requirements per customer requests.

Certified in ISO 9001:2000 specification and requirements for a quality management system so that

organization needs be met to consistently provide product that meets customer and applicable

regulatory requirements and aims.

Production/Manufacturing Manager

McDonnell/Douglas Aircraft May 1980 to August 1999

Long Beach, CA

Responsible for supervision, leading, coordinating of (150) employees assigned to my section/s of

the building, production, and manufacturing of commercial aircraft.

Created, developed, and implemented a plan that entailed a complete cost analysis over a two year

period. This plan was implemented after my report was developed and in the first year alone saved

the company 33 % in man hours and saved the company 125 thousand dollars in the first year

alone.

Responsible for multiple plant sites including our vendor supplier site in Guaymas, Sonora, Mexico

where I would visit periodically to ensure any and or all problems were corrected so that product

we received from this site would meet or exceed our on time delivery schedule for all our

customers.

Implemented an automated plan that eliminated all paper production plans. This involved the

implementation of work orders into an automated system that eliminated hand written orders and

transferred them to an automation system. This increased production work order release into

manufacturing and decreased the amount of time engineering required for QA buyoff.

Promoted JIT and Lean Processes and Procedures so that production schedules were not only met

but exceeded schedule requirements per customer requests.

Requisitioned materials, supplies, equipment parts, and/or repair services, interpreted

specifications, blueprints, job orders and company policies and procedures for employees.



Contact this candidate