GREGORY H. BOWLAND
THOMPSON MANITOBA
R8N0X5
BOWLAND CONSTRUCTION MANAGEMENT LTD.
TEL 204-***-****
E-mail: *******.*******@*****.***
PROFILE
A results oriented Professional Engineer (Civil) with extensive experience
in construction and project management. Takes pride in a job well done in a
T.Q.M. environment with ISO 9000 series standards. Recognized for being
innovative and pro-active in his career, and a team player.
As a Project Manager I am very familiar with the importance of project
controls, the 4 traditional pillars being safety, quality, schedule and
cost and the site team will be dedicated to accurately reporting on these
pillars both weekly and summarized on monthly reports to senior management.
A dependable, enthusiastic employee with excellent interpersonal
communication and negotiating skills. *Noted for his ability to deal
effectively with contractors and consultants. A strong leader who is able
to work independently or as part of a team with a diverse background from
being the Owners representative and also the EPCM and Contractor's on site
manager.
Recent opportunities
Mr. St. Pierre, District Construction Manager Western Canada, tetra Tech
offered me the Senior Oversight reviewer position for the early works &
Civil for the $8.0 B hydro electric project in Northern B.C. starting
this spring
Status: B.C. hydro has deferred this work pending further Environmental
hearings.
Mr. St. Pierre has also offered me a Senior Construction Manager position
in Perth, Australia for the $2.0B Karara Iron Ore Greenfield Project.
Status: Awaiting the successful Tender Award for the CM portion of the
work.
.
WORK EXPERIENCE
BCM CONSTRUCTION MANAGEMENT LIMITED (2009-2013INCLUSIVE)
Providing Engineering Project Management and Construction Management
Consulting services to various clients from my home base.
Fluor Canada Mining & Metals Division 2008 (JULY- SEPTEMBER)
Project Manager Level 3 Construction
DIAVIK Small Diamonds Project.
$50,000,000 Capital Project.
Lac du Gras, NWT.
Preparation of the Construction Execution Plan
Project Procedures Manual (Construction Section)
Contracting Strategy, Construction scheduling and budget.
Reason for Leaving: RioTinto cancelled the project due to diamond prices
WorleyParsons HGE. 2007 (JULY- SEPTEMBER)
On site Contract Manager, Lead Civil Engineer, Material Handling Manager
CVRD INCO Smelter Emissions Reduction Project
$ 65,000,000 Capital Project
Thompson, Manitoba
Reason for leaving: Medical I had a quadruple by-pass surgery and me left
carotid artery cleaned out.
AUBURN CONSTRUCTION MANAGEMENT SERVICES. 2007 (MAY-JUNE)
Project & Construction Manager
HBM&S Smelter Particulate Emissions Control Project.
Flin Flon, Manitoba
Reason for leaving: Hired prematurely, the project was still in the
proposal stage
WESTMAR ENGINEERING CONSULTANTS. 2007( JUNE-AUGUST)
Contracts Manager
Western Canadian Coal - Wolverine Project
Tumbler Ridge, British Columbia
$240,000,000 Coal Processing and Bulk Handling Facility
Reason for leaving: The project accountant found several contract
issues that were not
properly addressed prior to my arrival. The incumbent contract
administrator was retained.
MERIT CONSULTANTS INTERNATIONAL INC. 2005 ( MAY- SEPTEMBER)
Merit Consultants provided total Construction Management for this
Hatch and Consultants
Designed Project.
I was the only Professional Engineer on site working for Merit as
the on site Technical and
Contract Specialist.
KISLADAG GOLD MINE PROJECT
Near USAK, Turkey
$100,000,000 Greenfields Heap Leach Project
Reason for leaving: I was offered an exceptional opportunity with
a leading Engineering
Firm in my home town.
BOWLAND CONSTRUCTION MANAGEMENT LTD.(2004)
Principal Engineer (Self Employed) 2001-2005
INCO LIMITED 1981-2001
Senior Project Manager & Construction Engineer, Mines Planning
1 Project Manager for the Divisions Rock Fill Supply, including planning
for the source and development of a new quarry, control of rock
haulage, stockpiling and processing. Estimated annual cost $4,000,000.
2 Coordinating Fail-Safe Reviews in the Mines and Surface Plants.
3 A Five-Year Decommissioning Plan for the Mine Waste Rock stockpiles
and surface facilities for the outside mines.
4 Project Manager for the 20-year operating and progressive
decommissioning plan (study) for the Tailings Basin.
5 Advisor for the preparation of the Long Range Mining Plans (Civil)
6 Updated, reviewed and revised all of Inco's General Engineering
Standards, Applicable CSA Standards and all of the Special Process and
Procedures Manuals
7 Construction Manager for all of the Mines Surface Projects
8 Contract Preparation, Contract Administration and Contract closeout
for all of the Divisions Capital Projects, and Engineering,
Maintenance and Supply/Services agreement
9 General Engineering representative on the joint Union/ Management
Safety Initiatives.
10. Coached, & Mentored Junior Engineers and Technical Staff
regarding all Field Engineering practices and Procedures.
11, Supervised Material Testing Techs and Construction Site Survey
crews
12. Lead in house training of all Mine Engineering Staff regarding
Mine Contracting, Preparation, Administration & Proper close out Procedures
as per the Company Policy.
MAJOR PROJECTS with INCO LIMITED
Successfully managed the construction of:
Thompson Open Pit(s) Mine, Facilities, Infrastructure & Decommissioning
Estimated Capital Cost about $750 Million (8 year project
Birchtree Mine Rehabilitation Estimated Capital Cost about $ 500 Million
(5 year project)
T-1 Mine Upgrading Estimated Capital Cost $350 Million. (5-year project).
Refinery S/R Rounds Relocation Estimated Capital Cost $250 Million (3
year project).
Refinery Structural Steel Replacement Estimated Capital Cost $100 Million
(5 year project).
Refinery Plating Cell Replacement Estimated Capital Cost $75 Million (5
year project).
1-C & 1-D Mines Cemented Rockfill Stations, Fresh/Return Air Raises, and
other site improvements, structures and utility installations.
Estimated Capital Cost $250 Million. (5-year project).
***A comprehensive list all the significant elements +12 is available
upon request.
1997 -1998 I prepared the long term plan to complete the decommissioning
of Soab South, Soab North Mines; Pipe Mine, Pipe Open Pit Mine, Thompson
Open Pit Mine, various
outside mine facilities and all of the waste rock piles.
Reason for leaving: INCO downsizing/reengineered. Accepted a lucrative
buy out.
KILBORN ENGINEERING 1973 & 1979-1981
Resident Engineer
Caledonia Dam Project, Caledonia Ontario
Reason for leaving: Completed project
Resident Engineer
Dufferin Creek Channel Improvements
Reason for leaving: Completed project
Office Engineer
Denison Mines Expansion
Reason for leaving: Completed project
Field Engineer
The Noranda Group of Companies
Belledune Fertilizer Plant Expansion
Belledune, New Brunswick
Reason for leaving: Completed project
LUMMUS COMPANY CANADA LIMITED 1974-1978
Bruce Heavy Water Plants "B, C, & D"
Construction Engineer and
Area Planner for the $400,000,000 Enriching Units #3, #4 from site clearing
to the + 100 turnover test systems to initial operations (4 year project)
in the Planning & Cost Control Field Office. I was heavily involved for
several months in the "punch list" trailer up- dating the boards for all of
the Enriching Unit #4 test systems and scheduling the same with Initial
Operations and Ontario Hydro operations.
Contract Administrator in the Sub Contracts Department
Reason for leaving: Project Completed
DEPARTMENT OF HIGHWAYS (ONTARIO)
Various surveying, quality control, inspection services for the
construction of Highway # 144 from Cartier, Ontario to approximately 100
Kilometers North to Timmins, Ontario
Reason for leaving: returned to University
LIST OF MAJOR MINING AND ENGINEERING CONSULTANTS
(PROJECTS WELL IN EXCESS OF $100 MILLION)
Klohn Crippen and Associates Progressive Decommissioning of Inco's Tailings
Pond
Hardy, Reid Crothers & Associates Thompson Open Pit(s) Dredging
and Associated works.
V.B. Cook 1-C and 1-D Mines Cemented Rock Fill Station.
H.H. Simons Ltd. Birchtree Mine Deepening.
McIntyre & Associates Birchtree Mine Development and Air Raises.
Davy Canada 1-D Mine Development.
J.S. Redpath 3600 Level Tramming.
Kilborn Engineering LTD Birchtree Mine Rehabilitation.
Acres, UMA, Seacor, Klohn Crippen Environmental Projects for the Tailings
Pond.
J.R.Cormier LTD T-1 Hoist Upgrade and Replacements.
EDUCATION
Bachelor of Engineering (Civil-Structural) 1973 Carleton University,
Ottawa,Ontario
4th year credits in Highway Engineering, Pavement Design, Soil Mechanics,Reinforced Concrete Design (cast-in-place and pre-cast), Structural Steel
Design and Analysis, CSA S 16,.Bridge Design(CSA S6). Concrete design &
Testing CSA 23.1, 23.2, 23.3
Certificates in Project Management from PMI
1) Construction Management
2) Contract Preparation & Administration
3) Project Management
4) Cost Control & reporting
5) Project Planning, Scheduling & Co-ordination
Certificate in Project Procurement
Certificate on ISO 9000-1, -2, -3 accreditation requirements
Certificate in theTransportation of Hazardous goods, MSDS sheets
Extensive training in Construction Management
Certificate from DuPont's Process Safety Reviews.
Certificates from Dr. Edwards Deming's 4 courses on Total Quality, Process
Improvements,
University courses in Contract Law & Business Law
PROFESSIONAL AFFILIATIONS
Association of Professional Engineers of Manitoba A.P.E.M 20 year member
MEMBERSHIPS
Thompson Shrine Club
Khartum Shrine in Winnipeg
Mystery Lodge #174 AF&AM