Kent Morrett
** ***** ***** ***** ******** VT ***52 . 802-***-**** . ********@*****.***
Energetic and results-driven Quality Engineering Manager with over 25 years
of experience developing and leading people, projects, and programs in fast
paced environment. Long track record of effectively utilizing resources to
provide quality deliverables on time and under budget. Strong communication
skills; comfortable speaking with all levels of an organization. Proven
dedication to driving quality improvement.
. Demonstrated success identifying and tracking appropriate quality
metrics and reporting criteria; Used multiple methods from informal
discussions to formal milestone reviews to communicate program quality
levels to multiple management levels (up to and including CEO),
vendors, and customers.
. Proven ability to manage all aspects of complex programs serving both
government and private customers; throughout career, led teams
developing quality metrics, Material Review Board (MRB) analysis,
product and program quotes, development and production schedules,
vendor procurement, deliverables, annual budgets, and milestone
checkpoints
. Exceptional management skills, with experience developing new teams
and leading established teams; as the Principal Lead for EWA,
determined staffing needs, wrote job descriptions and performance
reviews, hired and trained new staff members, and managed teams
developing innovative systems
. Highly developed technical knowledge, with the ability to communicate
with and understand both customers and staff members; as a Program
Manager, documented client needs while simultaneously leading and
participating in teams developing programs and deliverables including
official documentation and training regimens.
Quality Control . Program Documentation . Government Document Writing and
Publishing
Deliverable Quality Control . Reliability Verification
Microsoft Office (Word, Excel, Project) . Visio . Cadence Design System .
AutoCAD
LabView . FORTRAN . COBOL . Basic . C
Quality Test Generation . Report Generation and Publication . Budget
Development
Grant and Proposal Writing . Cost Reduction Programs . Sales . Public
Speaking
DOD SECURITY CLEARANCE - SECRET LEVEL (in-active)
Active clearance can be reinstated with a secret program requirement
designation.
EXPERIENCE
IBM Corporation, Inc., Essex Junction VT Nov 2009 - Current
Quality Engineer (Dec 2012 - Current)
Design and redesign manufacturing and early development quality metric
structures, ensuring all specifications are up to date with current
technology and customer requirements and standardizing business practices.
. Design test vehicles for early reliability manufacturing monitors;
design activity includes documentation for both internal applications
and external customer communications
. Audit manufacturing line quality measurements for established
processes; review existing documents to ensure that metrics and day-to-
day manufacturing specifications are adhered to
Engineering Program Manager (Nov 2009 - Nov 2012)
Managed all technical and administrative needs for a three-year engineering
program which developed and implemented component data recognition software
in a technical manufacturing facility. Software significantly decreased
time from product initialization to manufacture from an average of 2 weeks
to 4 days by recognizing required product components and generating a bill
of materials; program currently rolled out to over 30 unique customers with
0 failures.
. Led cross-functional teams of up to 20 engineers developing,
implementing, testing, installing, and documenting a data recognition
software using industry standard programs
. Led team generating specifications, documentation implementation
updates and introduction of new program level qualifications
. Led team that wrote manufacturing documentation to support the
installation of data recognition programs
. Chaired weekly team meetings tracking successful results and
schedules; used multiple methods to communicate the program status,
weekly results, and quarterly outlooks to appropriate levels of
management
. All scheduled deliveries and deliverables met or exceeded program
targets and dates
EWA Government Systems, Inc., Montpelier VT Jan 2005 - Oct 2009
Principal Engineer
Recruited to manage, direct, and assist with establishment and operation of
a technology Design & Development center providing products and services to
the U.S. Government. Duties included hardware, software, and facility
review and selection, workforce development, project management, product
specifications, proposal generation, and customer presentations. Center was
completed on time and within budget.
. Obtained multiple vendor quotes and schedules and negotiated T&Cs and
deliverables while selecting Center's hardware and software
. Managed publishing of the Center establishment schedule which included
costs, vendor and supplier deliverables, key milestones and
checkpoints, documented deliverables, and installation schedules
. Wrote job descriptions, interviewed and hired personnel, and
established performance guidelines; developed training methods for all
personnel and conducted yearly reviews
. Served as project engineering lead while developing a Rough Order of
Magnitude (ROM) program and schedule requirements for 4 designs and 2
system engineering projects
. Served as principal OEM program sales and technical transfer project
engineer for manufacturing installation and transfer of technologies;
this included system and program documentation, specification and
requirement generation, technical drawings and communication to
appropriate levels of engineering and management
. Submitted white papers, wrote program statement of work,
specifications and system and test requirements
. Led various teams of up to 12 engineers in the writing of project
specifications and proposals and the design of various products:
o Coordinated and led team that wrote System Performance
Specifications (SPS) for US Special Operations Command (USSOCOM)
proposal efforts
o Led proposal effort for wireless portion of a prototype
residential remote control door lock; proposal included design
analysis and simulation and utilized commercially available
parts and industry standard programming methods
o Contributed to a team that provided inputs for the reduction in
power usage, size, and reliability improvement for an OEM power
supply board
o Designed, fabricated and built multilayer RF printed circuit
boards (PCBs)
o Researched and wrote a proposal for a traumatic brain injury
(TBI) and body detection sensor system
o Led a team that submitted research grant and development
proposals for airport explosive identification sensor methods;
system included gas or vapor identification methods, remote
robotic interrogation and control software
Insurance Sales GE LTC, Essex Junction VT Aug 2002 - Jan 2005
Specialist
. Sold long term care policies by gathering detailed medical information
and making informed underwriting estimates in the field
. Sold annuities in support of clients that could not qualify for Health
or Long Term care policies
. Completed field underwriting, policy and client reviews, and proposals
for updates and improvements in new and existing accounts
. Generated new leads and accounts by networking with existing
communities and individuals
IBM, Essex Junction VT Aug 1982 - Aug 2002
Program Manager, Project Engineer, and Test Design Engineer
. Held multiple Engineering and Management positions, with over 10 years
of project, program and people management experience and 5 years of
CAD layout, analysis software writing, and electrical test programming
. Built teams that transferred purchased technologies from IBM to select
customers; wrote portions of system documentation for both
manufacturing installation and OEM transfer of new technology
installation; installed 2-3 new technologies per year for 5 years
. Utilized Advanced Planning to reduce project completion time from 1
year to 6 months resulting in approx. $1.7MM savings
. Served as Lead Test and Characterization Engineer; developed test,
reliability and production methods for new processes
EDUCATION & TRAINING
Purdue University, W. Lafayette IN
M.S., Electrical Engineering
Anderson College, Anderson IN
B.A., Physics
IBM, Essex Junction VT
Device Physics, Principles of Accounting, Program Management Courses
PUBLICATIONS & US PATENTS
US. 5,233,263: "Lateral field emission devices", John E. Cronin, et al.
US. 5,308,439: "Lateral field emission devices and methods of fabrication",
John E. Cronin, et al.
US. 5,312,777: "Fabrication methods for bidirectional field emission
devices and storage structures", John E. Cronin, et al.
US. 5,530,262: "Bidirectional field emission devices, storage structures
fabrication methods", John E. Cronin, et al.
US. 6,329,690: "Method and apparatus to match semiconductor device
performance", Kent E. Morrett, et al.
US. 6,476,483: "Method and apparatus for cooling a silicon on insulator
device", Eric Adler, et al.
US. 6,683,345, "Semiconductor device and method for making the device
having an electrically modulated conduction channel", Eric Adler, et al.