Profile
Having more than * Years of experience as a Planning Engineer in the
field of Oil & Gas piping, equipments fabrication & erection and
Shutdown Turnaround Maintenance.
Skills Summary:
Project Planning & Scheduling Sub Contractor's Bill
Preparation of DPR,WPR checking
Daily monitoring of progress Quantity Surveying &Billing
Material, Manpower and Equipment Material Consumption
planning statement preparation
Asbuilt Drawing Preparation
Academic Qualification:
B.E. Mechanical Engineering From Anna University / Dr. M.G.R. Engineering
College, Chennai, Tamilnadu. Secured 79% with
Distinction. Passed out-2006
Higher Secondary School From Govt. Boys Higher Sec.School,
Aundipatty,Tamilnadu. Secured 89%
Passed out-2002.
SSLC From Govt. High School,
Rengasamudram, Tamilnadu. Secured 82.8%
Passed out-2000.
Additional Qualifications:
o MS Office
o Primavera P6 Version6.0
o MS Project
o PDMS 12
o SAP-MM
o Auto Cad (from 2000 to 2010 version)
o Solid works
o ASNT-Level-II
Personal Details:
o Date of Birth : 25th 'Aug' 1985
o Nationality : Indian
o Passport No. : H7912038 ( Date of Expiry : 01.12.2019)
o Language Known: English, Tamil, Telegu, Hindi & Malayalam.
Professional Experience(Current) - Aug'2013 - Till now.
Position: - Planning Engineer
Company - Qatar Engineering and Construction
Company WLL(QCON).
Project - Shutdown,RASGAS,Qatar.
Job Responsibilities:
o Updating Project Progress in P6, and preparing look-ahead plans
and Project S Curves.
o Preparing the DPR,WPR and sending the report to the Client.
o Ensuring the Supervisors are adopting to the shutdown plans.
o Ensuring all safety aspects is been adopted at site.
o Briefing the supervisors about the daily plan and ensuring that
the plan is effectively managed at site.
o Preparation of Progress Measurement Sheet and Invoices.
Professional Experience - Mar'2013 - May'2013
Position: - Planning Engineer
Company - ESP Asia(P) Ltd.
Project - Shut down TA-2013,Sohar Refinery, OMAN
Job Responsibilities:
o Updating Project Progress in P6, and preparing look-ahead plans.
o Updating the Turnaround report and report progress S-Curves.
o Preparation of 24 hrs LookAhead
o Attending the Coordination Meetings with Clients and internal
meetings.
o Awaring the management of the Critical items in the project.
o Preparing the DPR and sending the report to the Client.
o Ensuring the Supervisors are adopting to the shutdown plans.
o Ensuring all safety aspects is been adopted at site.
o Briefing the supervisors about the daily plan and ensuring that
the plan is effectively managed at site.
Professional Experience - Apr'2012 - Feb'2013
Position: - Planning Engineer
Company - GayTech Engineering Pvt.Ltd.
Project - Diesel Hydrotreator Project,HPCL,Visakha
Refinery,Visakhapatnam.
(Fabrication
and erection of A/G Piping,Structures &
Shutdown Piping)
Job Responsibilities:
o Preparing actual bill of quantities from studying project's
drawings like plan, isometric, key plan.
o Planning time & resources, scheduling the activities, updating
actual progress.
o Preparing daily progress report, weekly progress report, monthly
billing, hydro testing diagrams, joints mapping.
o Analyzing construction factors, such as labor, materials,
special machinery requirements and site location.
o Performing site visits and gathering necessary information such
as site accessibility, availability of utility services and
reporting to the concerned person.
o Preparation of overall project quantities.
o Attending weekly/Monthly progress review meeting.
o Monitoring the daily work activities of Sub Contractor and
updating Sub Contractor Progress Reports.
o Preparation of "As-built" documents such as Isometric drawings,
Pipe support drawings.
o Preparation of field piping system test packages,including
system limit on P&ID and piping Isometrics.
o Ensure that all punch list items are resolved; client handover
is satisfactorily concluded and that there is no prolongation of
project.
Professional Experience - Jun '2007 - Mar'2012
Position: - Planning Engineer
Company - CODE Engineers Pvt.Ltd.Mumbai.
Project 1: EAST WEST GAS PIPELINE-Natural Gas Compressor Station-10A&10B
Gujarat for Reliance(RGTIL)-Fabrication and erection of pipelines,Unit
piping,Structures and Equipment erection
Job Responsibilities:
Project 1:
o Preparing bill of quantities from studying project's drawings
like plan, isometric, key plan, spool erection drawings, P&ID,
flow diagram drawings and designs.
o Studying scope of works, Project specifications and Material
specifications.
o Preparing daily progress report, weekly progress report, monthly
billing, hydro testing diagrams, Pipe spool erection drawings,
joints mapping, material requisition.
o Analyzing construction factors, such as labor, materials,
special machinery requirements and site location.
o Planning time & resources, scheduling the activities, updating
actual progress, discussing project status; reviewing during the
course of project review meetings; coordinating with client and
head office.
o Monitoring the performance of the team to ensure efficiency in
process operations & meeting of individual & group targets.
o Additional work recording & obtaining client approval for
invoicing
o Preparation of Material Reconciliation Statement
o Preparation of "As-built" documents such as Isometric drawings,
Pipe support drawings,Loop test packages
o Preparation of field piping system test packages,including
system limit on P&ID and piping Isometrics
o Sub-Contractor's bill checking.
o Preparation of overall project quantities,Final bill and
associated techno-commercial documents for close-out of project.
Project 2: Fabrication Shop,Solapur,Maharashtra,India.-Fabrication of
various types of structures,Vessels,Tanks for Sugar plants,Power
plants(Thermal & Nuclear) etc.
Position : Planning Engineer
Job Responsibilities:
o Studying scope of works, Project specifications and Material
specifications for Vessels, Tanks,Structures of Sugar
plants,Power Plants etc.
o Developing accurate and clear cost estimates based on project
data. (Estimate man hours,Tools and Tackles,Equipments,etc
required for completing the project.)
o Preparing process plan, raw material cutting diagram etc for
each project.
o Executing the project as per the specification and QAP.
o Carrying stage wise inspection and preparing relevant documents
for the project.
o Preparing daily progress report, weekly progress report, monthly
billing,material requisition.
o Monitoring daily progress and reporting the same to Project
manager.
o Preparing Material Consumption Statement.
o Sub-Contractor's bill checking.
Professional Experience - May '2006 - May'2007
Position - Design
Engineer
Company - Pressform Industries, Chennai.
Job Responsibilities:
o Preparing general layout of Hydraulic press as per customer's
specification and getting approval
o Preparing detailed part drawings and bill of materials.
o Releasing of all part drawings for manufacturing.
o Preparing Inspection sheets and Operation Manual for Hydraulic
presses, Powerpacks, etc.
DECLARATION: -
I hereby declare that the above details furnished about me are true to the
best of my knowledge.
Yours
Truly,
LOGANATHAN V