Kevin R. Skaggs, PMP
** ********** ******, *** *********, CA 94110
******@*****.*** – 415-***-****
CAREER SYNOPSIS
• Certified Project Manager: Consistently has met and exceeded client and employer expectations.
• Highly innovative in reducing employer costs and streamlining/meeting schedules.
• Prior employers include Applied Materials, Wells Fargo and Exxon.
• Industry experience includes manufacturing, capital markets, and energy.
• VP Finance: Co-founded project finance firm, $500K consulting services, $1M success fee.
• Finance Modeling: Closed financing $104M [2012 dollars] 44MW cogen facility.
• MBA, Engineer [Tau Beta Pi]
CORE COMPETENCIES
Project Management Problem Analysis/Solution Business Process Reengineering
Financial Analysis Cash Flow Modeling Communication/Leadership
PROJECT MANAGEMENT [12 years]
Applied Materials AKT, Santa Clara: Industry leader in Chemical Vapor Deposition [CVD] systems used
in the display and thin film solar industries. [$8M-$15M/system, 2009 $1B revenue] Held key positions:
• Outsource Team Member: In 2008, Applied began moving its manufacturing capabilities from
Santa Clara to Taiwan. Traveled to Taiwan to train personnel and eventually transferred two
Project Manager positions to Taiwan in a seamless transition.
• Systems Project Manager [2011 to 2012]: Direct report to Sales and Operations Planning
Manager. Reengineered, improved and managed the Ship Authorization business process.
Quickly identified audit anomaly requiring major metrics adjustments and buy-in from regional and
top-level managers. Smoothed workflow and reduced process time 25%, saved 10% labor year
over year. Monitored, communicated, and drove key milestones to insure timely revenue
recognition, contributing to the 100% on-time shipping collective efforts. Captured and
summarized shipping metrics for managerial reports.
o Successfully structured, launched and managed departmental SharePoint site.
Maintained site access permissions of 150+ global personnel and maintained overall site
architecture for all Master Scheduling documents.
• Configuration Project Manager [2006 to 2010]: Direct report to Sales and Operations Planning
Manager. Complex system configurations strategically structured to allow for global outsourcing,
especially in Asia. Reengineered, improved and managed the CVD build configuration change
process from time of slotting to shipping. Significantly reduced configuration changes due to
Project Management function from 18% to 5% of total configuration changes, resulting in 5%
labor and 7% materials savings year over year. Created, drove, and summarized configuration
change metrics for managerial reports. Oracle based MRP.
• In both positions, interfaced with Applied’s global workforce [Taiwan, Korea, Japan, China, and
Santa Clara] in marketing, engineering, supply chain, manufacturing, logistics, finance, and
management. Effectively identified and communicated issues/changes/actions with stakeholders
and drove to completion.
Sieger Engineering, South San Francisco: Outsource Supplier for Applied Materials assemblies used
in the semi-conductor and display industries [$50k-$350k/assembly]. Sieger was acquired by Ultra Clean
Technologies in 2006.
• Project Manager [2000-2005]: Responsible for maintaining integrity of customers’ bills of
materials, implementing engineering and material changes into the manufacturing process, and
transitioning customer prototypes to production. Communicated updates and actions with
customer, supply chain, machine shop, inventory, logistics and production floor.
• Successfully exceeded customer expectations, as a result, was hired by Applied Materials 2006.
PROJECT FINANCE / CAPITAL MARKETS [8 years]
Praesum Investments, San Francisco
• Vice President [1988-1994]: Co-founded project finance firm that placed project financing for
developers/owners of cogeneration power plants. Provided customized project memorandum
packages for initial investor/lender review. Designed comprehensive spreadsheet-based financial
simulation models for various capitalization scenarios that quantified project cash flow and
identified risks/rewards for owners, lenders, contractors, and respective legal counsel, starting
from project incubation through closing. Active participant in all phases of negotiations.
• Successfully placed term financing for Carson Energy, a $104M [2012 dollars] for a 44 Megawatt
gas-fired cogeneration facility, 100% leverage lease: PruCaptial & Westinghouse. Success Fee
Basis $1M.
• Delivered $500K consulting engagement to Owl Energy Resources assisting with the
development of a 25 Megawatt waste wood facility.
Well Fargo Capital Markets, San Francisco
• Business Analyst [1986-1988]: Authored financial analyses of existing and potential Wells Fargo
clients considering M&As, LBOs, and divestitures in the range of $10M to $100M for a wide range
of industrial clients from agribusiness to power producers, from privately held to Fortune 2000.
Analyses encompassed industry overview, management/owner profile, capital structure,
operations, cash flow, and risk analysis/mitigation. Designed customized cash flow simulation
models for various capitalization scenarios. Worked closely with owners, financiers, legal counsel,
and senior management.
• Graduate of Wells Fargo Credit Management Training Program – 9 months
• Invited to co-found Praesum Investments by Wells Fargo SVP.
PROJECT ENGINEERING [5 years]
Exxon USA: Senior Engineer [1979-1984]
• Los Angeles: Prudhoe Bay Alaska is a multiple lease owned oil reservoir [Exxon, Arco, BP,
Chevron, Phillips, Mobil]. Owners collaboratively operate the reservoir to responsibly extract and
maximize the total field oil/gas production over the life of the reservoir. Reserve calculations
under each lease, performed by Reservoir Engineers, determine the allocation of production to
each owner. The Final Reserves Determination, a multi-corporate engineering and negotiated
effort, calculated and set the allocation for the life of the reservoir.
o Reservoir Engineer: Represented Exxon’s interest on various Prudhoe Bay multi-
corporate task forces to analyze and insure integrity of wellbore data and come to
negotiated agreement by all task force members. This data was used to populate a
common wellbore database used by all owners to eventually calculate the reserves of
Prudhoe Bay Alaska.
o The Final Determination collective efforts increased Exxon’s reserve allocation by $1B.
• Ventura: Reservoir and Subsurface Engineer: Improved production surveillance of Exxon’s
Wilmington Townlot Unit [300+ wells], brought 20 non-performing wells back to production.
Innovatively reduced O&M, reduced worst case well from 9 failures/yr to 1 failure/yr, saving
$100K/yr for that singular well. Implemented field wide and reduced O&M cost by $5M per year.
BS Chemical Engineering [Tau Beta Pi], Arizona State University
MBA Finance & Management Science, UC Davis
PMP Certified Project Management Professional #1414120
Professional Development
• Wells Fargo Credit Management Training Program
• Applied Materials Project Management Training Program
• UC Berkeley Project Management Certification
San Francisco Neighborhood Emergency Response Team [NERT]
Applied Materials Auxiliary Emergency Response Team [ERT]
Member Project Management Institute - San Francisco Bay Area Chapter
Enjoy family, friends, outdoor activities, and reading.
2