Housman (Xiaoming) Chen
*** **** ******* **., ***********, ON M1W 1X8
E-mail: ***********@*******.***
May 20, 2013
Human Resources
Re: Position of Mechanical Engineer
Dear Hiring Manager:
I am writing to apply for the position of Mechanical Engineer.
I have more than twenty years engineering experience of E-coating Systems,
Painting Booth & Powder Coating Booth, Pretreatment Systems, Oven Systems,
Conveyor Systems and Auxiliary Equipment in Design, Manufacture,
Installation, Commissioning, Maintenance and Customer Service.
As a Project Manager with Durr Paintshop Systems Engineering (China) Co.,
Ltd. I engaged in managing several bumper lines. As a Project Engineer with
KSL Industrial Supply Inc., I worked at making Proposal, Quotation, Layout,
Basic and Detail design for painting systems. As an Engineer with Hi Tech
Systems (USA) Inc., I designed E-coating and painting line for Hino Motors
Manufacturing (USA) Inc. and Eakas Arkansas (USA) Inc. With Hi Tech Systems
(China) Inc., I engaged in E-coating & painting and powder coating systems
for oversea companies, such as, MSD North Carolina (USA) Inc., Futaba
(Czech) S.r.o. and Technical Painting of Jacksonville (USA) Inc., and I
went to U.S.A.,Poland and Czech republic for installation, commissioning
and startup of the equipment, and to Japan for discussing with customer for
basic design and checking the detail design. As a Project Engineer with
Hightec Machinery Engineering Co., Ltd.. I participated in E-coating &
painting and powder coating systems for several companies, such as,
Shanghai VOLKWAGEN, Dachangjiang Motorcycle, G&P Bicycle (Shanghai) and
Grundfos Pump (China). As a Product Engineer with Hunterdouglas Industries
(China) Co., Ltd., I acquired the practical expertise in management of the
plant of painting and powder coating systems.
Through my studies at George Brown College, I have not only obtained
advanced knowledge of electrical and mechanical engineering, but have
acquired also excellent skill in PLC, digital and embedded systems, sensor,
instrumentation, motor and control, fluid and pneumatic power, robotics and
process automation.
My combination of excellent mechanical knowledge and technical skills
combined with an aptitude for learning new technologies easily allows me to
quickly get up to speed in any technical environment.
I look forward to hearing from you at your earliest convenience to discuss
my qualification. I can be contacted via E-mail at ***********@*******.***
or call my cell phone: 001-647-***-****
Sincerely yours,
Housman (Xiaoming) Chen
Housman (Xiaoming) Chen
112 Glen Springs Dr, Scarborough, ON M1W 1X8
E-mail: ***********@*******.***
OBJECTIVE
A challenge position as Mechanical Engineer to utilize my Project
Management, Design, Manufacture, Installation, Maintenance, Customer
Service, PLC and Robotics skills.
HIGHLIGHTS OF QUALIFICATION
< High level of ability of for Design, Manufacture, Installation,
Commissioning, Maintenance and Customer Service for E-Coating or
Painting or Powder Coating or Finishing Systems
< Strong make Layout, Proposal, Quoted Price, Flow Chart, and Basic &
Detail Design for E-Coating or Painting or Powder Coating or Finishing
Systems
< Excellent management of Engineering Project and Sales Technical Support
< Management of the plant of painting systems
< Mechanical Design & Develop and sheet metal Manufacture
< Product Process Technology and Quality Control
< Advanced level of skills with Autocad, Inventor, MS Office, MS Project
< Self-motivated, able to work independently or in a team environment
EDUCATION
Diploma in Electromechanical Engineering Technician
2010
George Brown College,
Core Courses: . Manufacturing Processes . PLC system .Servos and Robots
.Digital and Embedded Systems .Motors and Controls .Engineering
Mechanics .Fluid and Pneumatic
B.Sc. Design and Manufacture of Machinery
1988
Shanghai Fisheries University
WORK EXPERIENCE
Project Manager, Durr Paintshop Systems Engineering Co., Ltd. China Dec.
2011 --- Mar. 2013
< Checked project Proposal, Layout, Basic and Detail design
< Made and Control project schedule and cost in each process
< Managed supplier in fabrication, installation and Purchase for quality
and schedule
< Systems startup and commissioning for customer.
Project Engineer, KSL Industrial Supply Inc. Canada Apr.
2010 --- Nov. 2011
< Prepared Proposal, Quotation, Layout, and Flow Chart for painting
systems
< Basic and detail design for painting equipment
< Client service for maintenance, painting finishing systems and spare
parts
Project Engineer, HI TECH SYSTEMS, INC. U.S.A. Jan. 2006
--- Mar. 2010
< Give the technical support to sales, Make Proposal, Layout, Flow Chart
< Basic design and detail design for painting finishing systems
< Responsible for painting systems manufacture, installation, checkout,
startup, commissioning
< Work planning and scheduling of jobsite installation of contractor
< Client service for painting finishing systems and spare parts
< Participate in E-coating and painting finishing projects for Hino Motors
Manufacturing (UAS) Inc. and Eakas Arkansas (USA) Inc.
Design Engineer, HI TECH SYSTEMS, INC. China. Sep. 2002
--- Dec. 2005
< Plan, design, organize, oversee and co-ordinate the works of the
construction, operation and maintenance for the system as well as
installation and to establish the programs
< Direct and formulate the engineering strategies, policies and plans
< Ensure the engineering standards of quality, cost, safety, time limit
and performance
< Interpret plans, drawing and specification and provide advices on
engineering methods and procedure to achieve all engineering requirement
and Establish project schedules and budgets
< Responsible for installation checkout, commissioning and startup of
equipment
< Responsible for procurement, design review, workshop inspection and
jobsite QA support
< Work planning and scheduling of jobsite installation of contractor
< Participate in painting finishing projects for several oversea
companies, such as, MSD North Carolina(USA) Inc., Futaba Czech, S.r.o.,
Technical Painting of Jacksonville (USA) Inc., Etc. And I also went to
U.S.A. and Czech republic for installation, commissioning and startup of
the equipment, and to Japan for discussing with customer for basic
design and checking the detail design
Product Engineer, Hunterdouglas Industries Co., Ltd. China.
Jul. 2001---Aug. 2002
< Managed production tasks and controlled production schedule and quality
of painting plant
< Arranged production tasks and controlled production schedule and quality
of sheet metal plant
< Prepared maintenance for paint line.
Project Engineer, HIGHTEC Engineering Machinery Co., Ltd. China. Feb.
1991---Jun. 2001
< Layout and flow chart design, basic design and detail design for
painting plant
< Instructed and supervised manufacture, installation, and commissioning
of the painting plant
< Sales technical support, discuss with customer for the project
technology
< Compiled operation and maintenance instruction, trained engineer and
operating personnel
< Managed engineering projects. Controlled the schedules and quality of
all engineering, checked the drawing of all engineering designs and
arranged manufacture & installation
< Participated in painting finishing projects for several large companies,
such as Shanghai VOLKWAGEN, Southeast Automobile, Dachangjiang
Motorcycle, G&p Bicycle Shanghai and Grundfos Pump. Etc.
Project Engineer, Shanghai Ship-trade Developing Company, China. Apr.
1989---Jan. 1991
< Supervised and inspected the fabrication, repair and dismantle of ships
in electromechanical
< Guided the ship equipment designs, fabrication, repairing and
dismantling
< Compiled technology process of the ship's dismantled
Design Engineer, Jiangsu Shipyard of Sea Fishery Company, China.
Jul. 1988---Mar. 1989
< Designed and innovation designed the ship rudders, anchors and net
machine systems
< Improved the design of the ships' electrical and mechanical systems
< Oversaw the repairing of the ship's main and vice diesel engines