Warren B. Robinson, Jr
Pace, Fl 32571
850-***-**** Home
850-***-**** Cell
SUMMARY
I am a Construction Supervisor with extensive experience in highway
construction, paving highways, roads and parking lots, major fill and base work, also
experience in the underground involving water, sewer and drainage systems, scheduling
projects, training in MOT & Safety management.
QUALIFICATIONS
Experienced in Project Supervision for major excavations, asphalt and base
work. I have experience in operating all heavy equipment and CDL Class A with air
brakes drivers’ license. I also have Customer Service and Interpersonal skills, as well as
CPR/First Aid Training. I am familiar with all office equipment including computer
knowledge of Windows, Windows XP, Microsoft Works, Microsoft Excel and OPS.
EDUCATION
1990 -1994 - High School Diploma, Western High School, Davie, Fl
EMPLOYMENT
9/2011- Central Florida Paving
Miami, Florida
4/2011-8/2011 Owens Landscape Group
Birmingham, Alabama
2/2009-4/2010 Apac-Midsouth, Paving Supervisor
Pensacola, Fl Division
4/2008-1/2009 – Hubbard Construction, Paving Supervisor
West Palm Beach, Florida
2/2006-3/2008- APAC-Old Castle, Paving Supervisor
Memphis, TN Division
9/2000-2/2006 – APAC, Project Supervisor
Miami Division
Manager of multiple projects involving water, sewer, drainage
and total site work
2
1999-2000 – Russell Engineering, Inc.- Project Forman
Fort Lauderdale, Florida
1994-1999 – Weekley Asphalt- Asphalt & Road Crew Forman
1994- Paver Operator
1995 to 1997- Forman for an Asphalt Patch Crew
1997 to 1999- Base/ Road Crew Forman
Major Jobs and Field Assignments:
Ft. Lauderdale Airport - Asphalt resurfacing Taxiway and concourse repair
(Weekley Asphalt)
SR US 27 & 104th St. Miami, Fl – Widening & offsetting P-2 inlets 6’ offset
And 6’ of widening. (Weekley Asphalt)
City of Ft. Lauderdale, Fl – Resurfacing which took 3 months and 30 loads
a day. (Weekley Asphalt)
SR I-95 from SR 84 to Sunrise Blvd – Patch crew to sell project, job was 7
miles long.
SR US 1 from Copan’s Rd. to Sample Rd. – Project was 1 mile long. All
new construction on curbs, gutters, and turn lanes. Installation of water and
drainage system. I Ran the job for 6 months until completed. (Russell
Engineering)
North Andrews Neighborhood Improvement Project – The project is all
new construction of main line sewer, mainline water, storm drainage, base
and finished rock, asphalt, sewer services, water services and storm drain.
(Russell Engineering)
APAC JOBS – Inquire about jobs that were completed under my supervision
CERTIFICATIONS
Florida Advanced Training, Department of Environmental Protection
Inspector #4435 Training Program.
Level I and II Florida FDOT Asphalt Qualified
OSHA – Competent person class 8 hrs, trenching and roadway course
ATTSSA Traffic Control – 3-day training course
Basic CPR Training
CDL Class B with Air Brakes
.