Post Job Free
Sign in

Project Manager

Location:
Rolling Meadows, IL
Posted:
May 18, 2013

Contact this candidate

Resume:

Carsten Franck II

*** ***** ******* ******

Arlington Heights, IL 60004

847-***-****

*********@*****.***

CAREER HIGHLIGHTS

Structural Supervisor for world’s largest solar field

Working in the solar field learning the installation procedures for a fixed & tracker facility

Designed a ground laser system for the installation of posts

Designed a setting & alignment plate for the installation of posts in the sand

Designed innovative tools for the remediation of posts on a solar facility

Never failed to come in on time and under budget on every single project

Built one-of-a kind world class art museum, Figge, designed by renowned British

architect, David Chipperfield

Personally recognized as “a work of art” in construction publication for Figge

International Design Award – Figge Museum

14 consecutive annual Safety Awards

No OSHA recordables in 14 consecutive years

Eight OSHA inspections (two were 48 hours)-no citations were given to the general

contractors or sub-contractors

Architectural Design Award – Garlands Project

Designed and implemented the use of moveable safety cable system for pre-cast walls

Designed and put into practice a mechanically fastened metal tie-off point

Trained by Master Cabinet Maker from Germany

Awarded First Place in Illinois Carpenter Apprenticeship Contest

EXERIENCE Stromberg Construction Company Morton Grove, Illinois

2011 - 2013 Senior Superintendent

Supervised the renovation of a 14-story, 85 year old limestone structure at Loyola

University

Responsible for the day-to-day management of all site personnel and subcontractors

regarding quality control, adherence to the budget and project schedule

First Solar EPC / CLP Tempe, Arizona

2010 - 2011 Civil Supervisor

Supervisor responsible for installation of the solar structure

Maintained & coordinated the civil schedule

Coordinated the BOS contractors field installations

Tracked the daily installations of the BOS for the PMV

Managed all First Solar manpower

1988 - 2009 Pepper Construction Company Barrington, Illinois

Senior Superintendent

Coordinated all day-to day activities with Project Executive and Project Manager while

building a strong relationship with the client, architect and consultants.

Responsible for supervision at the field level of all job site personnel and subcontractors,

for all quality control and for the adherence to the project schedule and budget in

accordance to the specifications and contract documents

SERVICE Military Service

U. S. Army

Special Forces, Airborne Ranger

EDUCATION Curriculum

Bachelor of Arts general studies curriculum/Western Illinois University

Associate Degree program – Construction/Architectural Design/Harper College

Master Carpenter/Cabinetmaker

SKILLS Technology proficiency including Microsoft Office Products, Sure Trak, Plans and Specs

STATEMENT Raised in atmosphere of seventy-year-old, family-owned construction and cabinet-making

business. Challenged with responsibility early and learned what it means to be a true

craftsman in addition to developing a strong work ethic. This is perhaps the best educational

curriculum available.

PROJECT

EXPERIENCE COST S.P.W. SUBS

2012 – Mundelein Center – Loyola University $25M 10 men 70

Chicago, Illinois

State of the Art Performing Arts Theater and classrooms

2011 – Desert Sunlight Solar Park $2B 200 men 400

Desert Center, California

550 mw solar field (world’s largest solar field)

Installing one million posts, tilts and rails

Supervising the installation of 1.25 million solar panel cartridges (8 mods per cartridge)

4,100 acres of sheet grading/level roll site preparation

Structural Supervisor for 3,900 acres of solar field

2010 – 2011 NRG Santa Teresa Road Runner $72M 35 men 200

Santa Teresa, New Mexico

22.5 mw tracker solar field

Supervised the installation of 22,018 posts and tracking structure

220 acres of sheet grading

Supervising the BOS contractor

2010 Cimarron 30 Solar Field $100M 35men 150

Cimarron, New Mexico

30 mw solar field

Supervised the installation 65,572 post and tilts

340 acres of level & roll site preparation

Supervising the BOS contractor

$30M 6 men 65

2008-2009 Watersavers/Guardian Equipment

Chicago, Illinois

Demolition and renovation of existing warehouse

into new manufacturing facility encompassing

60,000 s.f. plus 20,000 s.f. of office space

Silver LEED certification

$100M 12 men 150

2007 Norwood Crossings

Norwood Park, Illinois

Retirement Community

Phase one of five

Four-story, 174 room building

200,000 s.f. project

2006 – 2007 Yordon Center -N I University $22M 45 men 70

DeKalb, Illinois

Academic and Athletic Center

State-of-the-art athletic and training facility

46,000 s.f. two-story building

18.4 acres of site work

2002 – 2005 Figge Arts Center $50M 60 men 120

Davenport, Iowa

100,000 s.f. world class art museum

Designed by David Chipperfield of London

The exterior is a dual plane curtainwall system

Four level, 138 ft. tall building including 35,000 s.f. underground parking

2001 – 2002 The Garlands (Phase 1) $85M 70 men 150

Barrington, Illinois

High end retirement community which consisted of five three-level buildings,

174 condominiums, three restaurants, large kitchen, banquet hall, theater, and six villas

750,000 s.f. project included 22 acres of site work

2000 – 2001 Bartlett Hall - U of Chicago $18M 28 men 60

Chicago, Illinois

Historical renovation of an existing three-story Gothic limestone

building from a 1901 gymnasium into a full service kitchen and dining facility

65,000 s.f.

1998 – 2000 AMLI $30M 150 men 80

St. Charles, Illinois

Twenty three-story buildings/400 apartments with attached

and detached garages with a clubhouse and a pool

500, 000 s.f. project included 26 acres of site work

1997 – 1998 IKEA Property, Inc. $45M 300 men 150

Schaumburg, Illinois

Furniture store/Restaurant/offices

Three-level retail furniture store consisting of showroom space, 350-seat restaurant with

full kitchen, offices, single-story warehouse, a three-story retail showroom, and market

space

The exterior construction consists of precast concrete panels

The roof structure consists of bar joist girders with a metal deck

The second and third level structures are composite concrete and metal deck on steel

beams

480,000 s.f. project included 28 acres of site work

1995 – 1997 Barat College $13M 15 men 40

Lake Forest, Illinois

Three level library with an exterior of the building brick steel frame

with composite concrete floors

300 space parking lot

Project included 8 acres of site work

$18M 45 men 70

1994 - 1995 LTD Commodities, Inc.

Bannockburn, Illinois

Warehouse addition with metal panel and curtain wall exterior skin

Two parking lots/1600 spaces

200,000 s.f. project included 16 acres of site work

$15M 12 men 45

1993 - 1995 Sears - Homan Square Tower

Chicago, Illinois

Historical renovation of landmark tower restoring it to its original 1920s look

Parking accommodates 150 cars

Project included 6 acres of site work

1992 – 1993 Nestle Distribution Center $35M 35men 250

Dekalb, Illinois

New warehouse encompassing 860,000 s.f. plus 40,000 s.f. of offices

Exterior skin made of precast concrete panels

Structural steel consists of 440 columns and bar joists

42 acres of concrete paving

Project included 162 acres of site work

1991 – 1992 Northern Illinois University $10M 35 men 70

Hoffman Estates, Illinois

New construction of a two-story, 46,000 s.f. classroom

and auditorium building set on 3.9 acres

$15M 25 men 60

1991 Sears - Stratford Square

Bloomingdale, Illinois

New two-story, 141,000 s.f. retail store

1989 – 1991 ITT -- West Campus $13M 70 men 80

Wheaton, Illinois

Two level classroom/engineering/laboratory institutional building

Two parking lots on 9.4 acres

50,000 s.f.

1988 – 1989 Prestwick Place $25M 2 men 95

Hoffman Estates, Illinois

100 two-story, single-family town homes with two-car attached garages

Project included 11.4 acres of site work

215,000 s.f.

1988 – 1989 Hamilton Village $15M 3 men 65

Itasca, Illinois

76 single-family, two-story town houses with attached garages

Project included 9.5 acres of site work.

122,000 s.f.

$15M 8 men 65

Trinity Hospital

Rock Island, IL

Four-story cancer and radiology addition

85,000 s.f.



Contact this candidate