Daniel R. Orr
Daniel R. Orr
Curriculum Vitae * Rock Creek Ct. Apt. 1A
Baltimore, Maryland 21234
Cellular: (585) (350 6096)
Email: ***********@*****.***
Objective
Senior Quality Assurance Analyst responsible for performing all aspects of coordinating and
managing the company’s/project’s Testing processes to include oversight of test planning,
development and execution, and reporting Ensure Company standards, policies and procedures
are established, administered, and followed in support of corporate goals and objectives. Work
with established program/project teams to lead them with preparing documentation and
deliverables resulting in successfully which provide a positive return on investment . Lead in
reviews and audits on products and processes in accordance with requirements and standards,
policies, and procedures. Meet with clients on a regular basis to ensure open communication.
Document and report project progress. Provide management team leadership in the above areas
to ensure projects meet objectives and goals.
Abilities
24 years+ experience in all aspects of this discipline including test planning, including working
1.
with developers and customers on ensuring requirement testability,
building and monitoring test systems (computer, networking, and database) to meeting with
2.
customers needs
Develop test processes/procedures to ensuring the product meets their needs.
3.
Project Management, Database Administration, Systems Analysis and Integration, and
4.
Networking and Telecommunications certified.
Able to ensure products delivered on time, within budget, and with desired scope and quality.
5.
Key Skills
Basic Programs: Windows XP, Vista OS (95+), Microsoft Office Suite (both 2003 & 2007, MS
Excel and Access.
Specific Software: HP’s Quality Center, Rational Tool Suite, Mercury’s Winrunner/Loadrunner
toolset, MS SQL Server, Visual Basic (.net), ASP.Net, MS Visio, MS Project.
Wired/Wireless Networking
Acquired Skill Sets
Applied VS Skill Sets Design Development Management
Software Quality Monitor requirements Develop test plans, test Perform tests. Identify and report defects.
definition process to ensure procedures, and test cases Lead defect review meetings. Ensure
Management
testability, (including expected results) development processes adhere to
understandability, and based on defined project adopted policies and procedures.
deliverability. Ensure all requirements and following Maintain standards compliance.
interfaces between defined processes. Manage/direct project configuration
components are identified Provide special emphasis management processes. Provide reports
and are testable. Identify on component integration. to project team, customer and quality
quality standards, policies, Conduct audits, as team with information on defects
and procedures applicable required based on project identified/corrected, process improvement
to projects. Establish specific objectives recommendations and team integrity.
working relationship with
customer and project team
that promotes teamwork.
Database Design Identified/defined Identified both hardware Lead team of engineers, both quality and
requirements for a and software components development to ensure that the product
distributed database supporting design. Design met customer requirements and would be
system in support of a implemented in Database delivered as specified
fictitious package Warehouse format
distribution system
Network Design Identified/defined Worked with team of Provided leadership and guidance
requirements for a network developers to ensure that working with both school faculty and IT
system for a fictitious the requirement were met personnel to ensure effective design
school district. Included at that the system could be implementation. Delivered project on
LAN, WAN, and wireless managed from a central time, with budget and with desired scope
hardware and software location and quality.
requirements
System Analysis Worked with customer and Used Rapid Application Used MS Project to identify tasks, monitor
project team to identify Development processes schedule and costs, assign personnel
and Integration
requirements, effective (Agile programming) to effectively and reported progress to
design, and deployment ensure the product would senior management on a timely or as
capabilities be delivered in the short needed basis.
timeframe required by the
customer
Project Developed project charters. Created project work Monitored project progress including cost,
Lead project team to breakdown structures. schedule and scope. Worked issues as
Management
estimate project scope, Interviewed prospective they occurred. Worked with customer
timeline, cost, schedule, team members. Created and project team to ensure project was
and resources. Identified communication interface delivered “on time, within budget, and
project risks. between project and client. with desired scope and quality.”
Education
Masters in Information Technology Management Colorado Technical University Online
Colorado Springs, Colo.
BS in Computer Science (Math minor) Pennsylvania State University
State College, PA
High School Diploma: Advanced Group California High School California, PA
Prior Employment
7/2011 – 2/2012, 4/2012-present Contractor (Prometric), Baltimore Maryland
Responsible for testing on-line test delivery systems to ensure exam delivery, completion and
result certification. Also responsible for reviewing requirements, writing test scenarios/cases for
projects involving delivery of electronic exams for various clients across the word. Also
responsible for implementing the test scenarios/cases, writing defects, identifying root cause and
revalidating via regression testing. Worked with management to establish standardized
processes for enabling data masking of personal sensitive data to be used across projects.
Provided IT support where necessary.
11/2010-12/2010 Test Lead, IT QA Department, Corning Glass
Worked with three different project teams to lead the test effort, from developing
testing strategy/approach, through collecting and documenting defect metrics in HP’s
Quality Center. Met with Project Leadership teams to assist with proper testing
methods and philosophy. Converted Business Analysts decisions/definitions into
useable/documentable/testable requirements. Established QA processes which
promoted efficiencies and effectiveness.
5/2010-9/2010 Test Coordinator (M&T Bank), John Berry Consulting,
Responsible for leading the test planning, setup, coordination, and consultation of the testing effort on a multi-year, multi-
million dollar banking project. Instructed Business Analysts, Quality Assurance and Test, and Project Management on
testing best practices, including preparation and execution. Lead project quality teams assisting with requirements
gathering including business, performance, capacity and integration, including communications (interfaces). Provided
Business Analysts and Quality Assurance teams with coordinated Test plan development. Developed the project timeline as
related to the test effort, identifying the testing critical path. Assisted with selection of the project’s defect tracking and
reporting tool to ensure commonality between and among the testing groups. Reported to Senior Management (Project and
Business) on test planning efforts and results.
4/2008-6/2008 Lead Test Engineer, (Excellus BC/BS) TEKSystems,
Responsible for leading the test process: preparation, setup, and execution for 2 client projects, part of a 7 project, 5 year
Transformation project. Worked with project teams to assist with individual project requirements development including
business, database and interproject communications (interfaces). Assisted with development of database schema/models.
Developed test strategies, test data model that identifies expected results for use during actual testing. Created test plans,
test cases, and provide test reports. Performed data analysis. Identify and report defects. Developed plans to manage the
entire testing process. Ensured accuracy of clinical data/structures and models. Report to Senior Management on test
progress and results.
9/2007-4/2008 Software Quality Engineer, Carestream Health Rochester, NY,
Responsible for Clinical Database test preparation, setup, and execution for client’s Clinical database. Worked with
developers in creating effective data models, schema, and programs to ensure accurate program data interfaces. Used
standards, policies and procedures to ensure interface effectiveness while maintaining data integrity. Created test plans, test
cases, and provide test reports. Identified and reported defects. Managed the testing process. Performed data analysis to
ensure accuracy of clinical data. Reported to Senior Management on test progress and results. Conducted testing on the
tools used to insert/extract data into database. Ensured database data accuracy per documentation/requirements/standards.
4/2007-9/2007 Software Quality Engineer, Eastman Kodak, Rochester, NY,
Responsible for Test preparation, setup (hardware and software), and execution for client’s e-commerce website. Created
test plans, test cases, and provide test reports. Identify and report defects. Managed the testing process. Ensured accuracy
of website information, web navigation, and accurate integration between client data collection and server database.
Reported to Senior Management on test progress and results. Conducted load testing on the project’s servers using
Mercury’s Loadrunner performance tester to ensure project servers were capable of handling the load defined in project
documentation/requirements. Ensure that the data model used effectively handled data as required by customer. Act as
representative for Voice of the Customer.
1/1994 4/2007 Multiple contractor jobs working in both Software Engineering and Manufacturing
environments primarily in Quality Assurance and Process Improvement. Six years
working for Eastman Kodak as a Software Quality Engineer/Manager. Worked with
software engineers developing and setting up network, computer, and database
systems in support of a successful $2M client server R&D project. Four years working
as a contractor for multiple clients leading teams and performing CMM based
appraisals comparing software engineering processes of major DoD contractors
against the key practices of the Software Engineering Institute’s Capability Maturity
Model for Software.
9/1971 12/1993 U.S. Air Force (Retired)
Worked with Software Engineering Institute in developing the Software Capability
Evaluation and the Capability Maturity Model Appraisal methodology. Conducted
multiple appraisals at all maturity levels, including 1 at Motorola for Level 5. Software
Quality Manager for the A.F. Operational Test and Evaluations Center on a $3B Radar
System, developed by General Electric, and responsible for ensuring all software met
established requirements.