Post Job Free
Sign in

Drilling fluids Engineer

Location:
Cairo, Cairo Governorate, Egypt
Salary:
500 $ pper day
Posted:
September 18, 2013

Contact this candidate

Resume:

MOHAMED AHMED SALAMA

Fesha Sleem, Tanta

Algarbiya, Egypt

Telephone: +2-040-*******

Mobile: +2-010-********

E-mail: ab7z5l@r.postjobfree.com

objective

I'm Seeking challenging position in a big drilling

fluids and services company where I can contribute to

the growth of this company. I will utilize my experience

as drilling fluids engineer on drilling operations to

achieve the company mission goals. It is my goal to

drill deeper wells with highest degree possible with

high performance including cost effective, controlling

well cost and minimize reservoir damage.

education

2001-2005 Al Azhar University

Cairo, Egypt

Faculty of Science, Chemistry dep.

Grade: Very good with honor.

skills

Computer Skills:

Excellent Knowledge of Ms-windows, Ms-PowerPoint

&internet.

Very Good Knowledge of Ms-excel and Ms-word.

Good knowledge of outlook, Ms-project.

Fair Knowledge of graphic program.

Enhanced Presentation & project development skills.

Acquired basic business skills including: marketing,

sales, banking, accounting, business correspondence and

report writing.

Customer service course (Dale Carnegie).

Computer and language course:

Basic Business Skills Acquisition (BBSA) Cairo, Egypt

Sponsored by the Future Generation Foundation (FGF).

Language Skills:

Native language Arabic.

Very Good command of both written and spoken English.

OIL FIELD COURSES:

(2012) HUET including EBS-5095(OPITO approved).

(2011) H2S Awareness and SCBA.

(2009) (IADC Well CAP) FULL COURSE IN WELL Control

Instruction at an Institution Accredited by the

International Association of Drilling at randy smith

Cairo.

(2009)Training course in fire prevention, fire fighting,

Survival & HUET on board offshore units in the Arab

Academy for Science, Technology and Maritime Transport

at Alexandria.

(2006) Mud school by Ava drilling fluids and Services

Company

In-HOUSE SAFETY TRAINING COURSE in AVA Office Company at

Cairo

HYCALIC HYDRAULICS SOFTWARE.

Training course in petroleum pipelines Co.

Experience

TOTAL 8 YEARS EXPERIENCE AS DRILLING FLUIDS ENGINEER.

(2006-2011) 5 years experience as Mud Engineer in

ava.spa drilling Fluids Company is A Newpark Company. My

experience is in Libya and Egypt.

(2011- 2013) 2 years experience as OES senior mud

engineer working in KSA.

(From 2013- now) Operations Coordinator in AVA S.P.A

Egypt branch.

During this period I drilled many wells using WBM (KCL

polymer), KCL Glycol-PHPA mud, Emulsion Mud, Spud mud,

Flex drill system mud, OBM (O/W ratio and All Oil), Na

CL salt polymer.

Major customer worked with :

TPOC, VERENEX ENERGY, INA, PETROBEL and ARAMCO.

Arm6 well with depth 14000 ft using Gel mud, KCL polymer

and OBM ( Abu Rudis field,Sainai, Egypt)

Rizk-1 with depth 13500 ft using Gel mud and KCL polymer

mud (Ina naphthaplin, Eastern desert, Al Alamin field,

Egypt).

Rizk east-1 with depth 15000 ft using Gel mud, KCL

polymer mud and completion fluids.(Ina naphthaplin,Al

Alamin field, Egypt)

G1 well ( block 47) with average depth 11500 ft using

Gel mud and KCL polymer mud ( Verenex Energy, Libya)

G1-147/3 with average depth 13500 ft using Gel mud and

KCL polymer Glycol PHPA mud.( TPOC company, Libya)

RGHB-3 well with 12500 ft using Gel mud, KCL polymer

mud, OBM and Na CL salt polymer mud.( Aramco, KSA)

HRSN-1 well using Gel mud, KCL polymer mud, OBM, Na CL

salt polymer mud and completion fluid.

ABRZ-3 well using GEL mud, KCL polymer mud, OBM and

completion fluids,(inhibited Brine)

ST-53 well, using spud mud, KCL polymer mud and OBM,

completion fluid using 5% by weight KCL brine, with

NTU< 100,with total depth 11096 ft

FRYD-1 deviated well, using OBM 80/20 O/W, completion

using KCL brine with NTU<50. ( TVD=13250 ft)

ST-51-A deviated well inside Qusiba and hot qusiba shale

using Spud mud, KCL mud and OBM with total TVD 11500 ft.

ST-59 well, vertical well using Spud mud, KCL polymer

mud with shale inhibitors chemicals and OBM 80/20, O/W

with average depth 10300 ft TVD.

SFNY-923 well, offshore rig, MD=9955 ft, TVD=5261.5 ft

Used filtration unit 2 times in Egypt with Ava spa

drilling fluids and Services Company.

MAJOR Drilling problems,

Bit balling.

Complete loss.

Partial losses.

Stuck pipe.

Caving and sloughing shale

H2S flow.

Interests

Reading scientific books, practice sports and traveling

outside for working.

I'm a hard worker, ready for working at any place any

time.

Personal Information

MARITAL STATUS: MARRIED.

Military Status: Exempted.

To Whom It May Concern

with my best regards

M. SALAMA



Contact this candidate