Post Job Free
Sign in

Project Supervisor

Location:
Baton Rouge, LA, 70801 - July 2013
Posted:
August 27, 2013

Contact this candidate

Resume:

SHAHZAD ANWAR [pic]

THOKER NAIZ BAIG NEAR SARSHAR TOWN HAZRAT ALI sTEEET # 4

PHONE +92-032*-******* +92 -307-***-**** +92-42-502****

E-MAIL :*****.********@*****.***

E-MAIL : ******@*****.***

CAREER Objective

To achieve a respectable level of professional excellence in an organization providing

opportunities of experience in Telecommunications.

PROFESSIONAL EXPERIENCE

(July 2005 to 06 Dec 2006) Worked with an ASP Prime Telecommunications Engineering

Services (Pvt) Ltd. As a Supervisor Installation. PTES presently engage in

installation of WARID TELECOM's BTS Cell Sites.

(23 Mar 2007 to 31 Mar 2008) Working in KomKonsult Telecom on Warid, Huawei Warid,CM

Pak Project in south region as senior Supervisor/Team Leader.

(5 April 2008 to 10 October 2009 With Private Company Contract installation Sites.

4 Jan 2010 to 15 May 2010 Sadiqe Sons Telecom Pvt, Ltd. On Telenor Project in Multan

region as Supervisor/ Team Leader.

26 May 2010 to till With Private Company Contract installation Ufone Project phase

VIII Sites.

O1 May 2012 Worked with an ASP Hyquip Sourcing & Services Pvt Ltd. To continue

TECHNICAL APTITUDE

Prime Telecommunications Engineering Services (Pvt) Ltd.

Prime Telecom is a leading telecom solution provider established in 2000. PTES is

currently engaged with two reputed GSM operators of Pakistan Warid Telecom and

Mobilink GSM. PTES working in the respective area of BTS installation, and temes

testing. My responsibility and achievements includes the following.

WARID PROJECT

Phase I, II, IV, V,VI,VI.I VI.II

Supervise the Complete installation of BTS site (Indoor/Outdoor Equipments).

Performed tems testing and upgardation of Ericsson Radio Base Station 2206, 2207,

2106, 2107,

2308, 2116 and 2216.

Supervise the Transmission Ring installation in Quata

Snag reporting for quality clearance purpose and daily reporting of work status.

Performed installation of Ericsson Minilink (MMU Module) classic and traffic nodes

Performed VSWR and DTF feeder tests using Anritsu site master.

Performed TEMS tests

Participated and supervised dish alignment of radio links of BTS sites.

Participated and supervised Antenna and radio swapping at BTS sites.

Participated and supervised transmission up gradation involving the cutover from

classic to traffic node.

Making all types of connectors (LDF5-50, IF Cable, 25 pin, 9 pins, and all types of

DC connectors.

Installation of batteries bank ( BBS)

Installation of Microwave equipment traffic node, classic node, high cap and radio

links ( Minilink 0.3 Meter 0.6 Meter and 1.2 Meter and 1.8 Meter)

MMU Up gradation 2/2 to 4/2.

DTRU Up gradation 2+2+2 to 4+4+4.

Installation of Emerson Power Rectifier, all indoor power cables, Signal cables and

External alarm cables(BAT BOX DF) and E1 patching in Krone block (DDF).

Equipment testing BBS, E1 clearance, Local Loop tasting.

Execute Quality inspection of Cell Sites before hand over to the customer.

Installation of Emerson Power Rectifier & Battry Back Up system Msc Faisalabad,

Islamabad.

Installation of Quatta Msc Battry Back Up System & Cable Laying, ACDB for Ac Power

Familiar with efficient use of following test equipments

Oscilloscope.

Site Master Anritsu S331D & S332D. & Bird

Digital/ Analog Multi Meter.

Digital/ Analog Signal Generator.

Frequency Counter.

PROFESSIONAL TRAININGS

Received on site training on complete WARID TELECOM BTS site installation, and testing

of Ericsson RBS 2206/2207.

Received on site training on BTS testing of Ericsson RBS 2106/2107.

Training on site on the Classic node and Traffic node.

REGULAR Education

Matric

FA

DIPLOMA:

Optical Fiber Cable Splicing & Transmission System

(Telecom Foundation Training institute Lahore ) 3 Month

PERSONAL BIO DATA

FATHER NAME Syed M. Anwar Shah

DATE OF BIRTH 10-12-1976

N.I.C. NO

35202-2600250-5

RELIGION ISLAM

MARTIAL STATUS Married



Contact this candidate