Post Job Free
Sign in

Engineer Project

Location:
Riverside, CA, 92507
Salary:
$80K-$95K
Posted:
August 23, 2013

Contact this candidate

Resume:

ISRAR KHAN

**** ***** *** **** # ***, Riverside CA 92507

**********@*****.***

512-***-****

US Citizen

SUMMARY

Eighteen years of Industrial Engineering experience in Manufacturing,

Distribution, Fulfillment and Logistics environment.

Strengths include:

* Project Management * Product Cost Analysis * Methods

Engineering * Work Measurement

* Product Engineering * Statistical Process Control * Process

Engineering * Cost Estimating

* Capacity Planning * Process Design *

Process Re-layout * Headcount Planning

* DMAIC

EDUCATION

University of Texas at Arlington, Arlington, Texas.

Bachelor of Science in Industrial Engineering May 1989.

WORK EXPERIENCE

Process Improvement Engineer

Ross Discount Stores Moreno Valley, CA 3/2013-8/2013

. Worked on a project to increase the capacity of Put To Light system

(PTL). Instituted 2 packers per zone

methodology (without zones split) which resulted in 50 % improvement to

throughput, 75 % reduction in

lane full, 15% reduction in re-circulation rate and an increase in

cubing of the boxes ($250K savings).

DMAIC principles were used to complete this project.

. Further savings from this project were partial taping of vendor boxes

that were pushed out from the zones

(annual savings of $75K), placing 2-3 vendor boxes/cart (annual savings

of $20K), redesign of the packers

cart (permanent 5S location for scanners, tape holders etc.).

. Performed new store slotting for PTL and Tilt Tray system on a quarterly

basis. Also, created a new staffing

Tool for PTL system.

Senior Industrial Engineer

Ingram Micro Tustin, CA 11/2011-

10/2012

. Maintained and updated labor standards in Red Prairie System. Created new

flow charts and job codes

for new processes.

. Performed storage analysis for new accounts that were either accommodated

in existing fulfillment centers or

designed layouts for new fulfillment centers including project

management, procurement of equipment, vendor selection and supervised

installation of equipment.

. Provided TMUs using MOST for potential new accounts for costing purposes.

Worked closely with Program

Managers in providing labor and start up estimates for new

distribution centers for new accounts.

Senior Industrial Engineer/Project Manager

8/2007-10/2011

Amazon.com Seattle, WA

. Managed a project that involved designing a new 320,000 Sq. Ft

Fulfillment center in Las Vegas, it had

a budget of $3.2M. Was responsible for design, capacity and storage

studies, RFP's for Material

Handling and storage, CAR (Capital Authorization Request), selection of

vendors, installation of all

MHE and storage equipment, managing of the budget (project cost were 3%

under budget).

. Managed a project that involved designing a new non sort 520,000 Sq. Ft.

Fulfillment center in Goodyear AZ.

It had a budget of $6.5M and was completed one week under the deadline.

Was responsible for design, capacity and storage studies, RFP's for

Material Handling and storage, CAR (Capital Authorization Request),

selection of vendors, installation of all MHE and storage equipment,

managing of the budget.

. Decommissioned 1.8M sq. ft of fulfillment centers, ranging from 75K sq.

ft to 650K sq. ft, tasks included teardown of material handling and

storage equipment, preparing RFP, maintaining project schedule in MS

Project and brought the buildings to return to lease condition.

. Owned the whole program for workstations and carts for the worldwide

Amazon network. Maintained a catalogue of 92 workstations and carts. Was

the project lead in investigation, prototyping and release of new

workstations and carts.

. Developed and updated capacity plans for 6 fulfillment centers.

. Was the project lead for upgrading the Material Handling and Storage

capacities for 4 existing

Fulfillment centers. It had a budget of $1.4M.

Senior Industrial Engineer

10/2005-08/07

Jabil Inc. Saint Petersburg, FL

Was the program manager for Sensus business unit. Was responsible for

liaison with design and

manufacturing group, managing all aspects for acquiring the business

(test engineering, assembly,

planning, training). Sensus did select Jabil and the Chihuahua, Mexico

was the selected site.

Led a team of Industrial engineers for RPTV (Rear Projection TV) line

layout in Chihuahua, Mexico.

The 10 month ($1.5M) project involved design of the layout, design

reviews, MOST analysis, PFMEA,

Headcount and capacity plans, bottleneck or Takt time, vendor selection,

procurement of equipment,

Installation of a new line layout and post install support.

. Supported RFID group with RFID related deliverables, process mapping,

benchmarking, ROI studies,

Process measurement. Also was heavily involved in the assessment of Gen 2

RFID gate which included

gate demo, test and data gathering.

. Participated in DFA (Design For Assembly) activities with values

engineering team, used an In-House

tool to conduct DFA analysis.

. Set up an Ergonomic reference document to be used for designing layouts,

the documentation covered

Cumulative trauma disorders, anthropometry, NIOSH lifting guide and Snook

material handling tables.

Process Engineer

8/1998-10/05

Dell Computer, Computer Manufacturer, One Dell Way, Round Rock, TX. 78682.

. Developed capacity and Headcount plans for Returns and order fulfillment

operations and updated them on a quarterly basis.

. Redesigned the Over pack area in our distribution and fulfillment

facility, resulting in $275K annual savings.

Green Belt project (3 months payback).

. Instituted an OEM Box Recycling program for Hard Drives, Power Supplies,

and Notebook batteries resulting in an annual savings of $600K with zero

capital cost. Won the Green Belt MVP award for it.

. Installed an 802.11b RF infrastructure in our Fulfillment/Bulk Warehouse

building, eliminating 6 headcounts in Put Away and Order Pull area. ROI

of 227 % and payback period of 3.5 months.

. Redesigned the Vendor Repair Receiving area, tripling the capacity and

reducing backlog by 90 % in the same square footage ($500 K Capital

budget). ROI of 179 % and payback of 7 months. Won the MVP award for

it.

. Responsible for 5S and safety issues for the returns and order

fulfillment facilities.

. Installed 3 White Vertical Carousel in Hard Drive Software Download

area, using Kanban Technique eliminated the need for 14 bin racks in

Hard Drive storage, freeing up 60 % of the space for process area.

. Designed and implemented a new shipping process in order fulfillment

resulting in forty percent reduction

of cycle time and increase in capacity from 17,000 orders a day to

34,000, it was finished on time and within budget. Project steps

included redesign, coordinating inter-departmental activities, working

with vendors, procurement of capital equipment (Ermanco Conveyor System)

and supervising all installation.

. Simulated and modeled the existing operations in order fulfillment using

Promodel to have the

capability to do what if analysis.

. Leader of the team responsible for Cycle Time Reduction. Eliminated 9

headcounts in 4 quarters in 2003 by just getting rid of Non-Value added

elements.

Costing/Pricing Analyst

4/98-7/98

AlliedSignal Inc., Thermal Systems. Torrance, CA.

. Developed cost matrices for all types of charge air coolers, cooling

modules and radiators. Also,

established pricing strategies for all our customers.

. Created a financial proposal to obtain the Kenworth Truck Company

engine trim business.

Manufacturing Engineer

3/97-3/98

AST Computer Inc., Computer Manufacturer. Fort Worth, TX.

( Established standard times on desktops, notebooks and servers based

on RWF (Ready Work Factor) work

measurement technique (similar to MTM).

( Generated operation sequencing and manufacturing assembly

instructions for new products.

( Performed line balancing and created routings.

( A key member of the team that was responsible for installation and

implementation of statistical tracking

software for improved reporting capabilities with regard to

factory efficiency.

( Participating member of a group involved in benchmarking and cycle

time reduction.

Corporate Industrial Engineer & Cost Engineer

7/91-3/97

GO/DAN INDUSTRIES, Automotive and Industrial Radiator Manufacturing

Company. Dallas, TX.

1. Performed classical industrial engineering analysis, developed labor

standards, bills of materials and

routings for three manufacturing locations.

2. Analyzed manufacturing processes and transformed batch flow

manufacturing operation to continuous

flow process operation based on JIT and cellular manufacturing

philosophies.

3. Generated cost estimates/analysis for new heater and radiator models

for sales/marketing division.

4. Participating member of cost reduction and gain sharing committee.

SEMINARS OR COURSES/TECHNICAL TRAINING

* Making MRPII work for you. * Systems engineering. * RWF

training at Samsung Electronics in S. Korea.

* Simulation and Modeling by Promodel *AutoCad LT * Green Belt

certified.* MOST Certified

* Certified in Advanced Ergonomics

Software

Microsoft Project, MS Excel, MS Power Point, MS Word, Lotus 1-2-3, Auto

Cad Lite, ProModel 4.1, FLOW Chart 4, MAPICS, MAXCIM, CICS, Standards Pro

by MOST

PROFESSIONAL ASSOCIATIONS

Citizenship : US. Citizen

Member IIE, APICS, MTM Association.



Contact this candidate