DHRUV SINGH CHAUHAN
*********************@*****.***
Current Address: Flat No. 221, Near Murti Medicentre, Hoshiyarpur, Sec-51,
Noida (U.P) Ph. +91-999*******.
Permanent Address: C/O shri Ram Surat Singh, Vill: Amow, Post: Sahabganj,
Chakiya, Distt: Chanduali (U.P)
OBJECTIVE:
To get an entry level position in a reputed & established organization
where I can get the opportunity to contribute significantly to the
organizational process & sharpen my own skills & knowledge levels in the
process.
EDUCATION:
Exam Year College & Board Main Subjects Mark% Status
B.TECH 2013 Hindustan College of Civil Engineering 65.52 Passed
Science & Technology,
Mathura.UPTU.
Diploma 2010 Govt. polythenic Civil Engineering 70 Passed
Chandauli, UP
12th 2007 K.V. New Cantt. English, Business 72.23 Passed
Allahabad.(CBSE Accountancy,Eco.,
Board) I.P
10th 2005 K.V. Narangi,Assam Hindi,Mathematics 64.83 Passed
(CBSE Board),
Science,English,S
.S.
INTERPENSHIP (EXP.):
LARSEN & TURBO CONSTRUCTION, ECC Division July, 2012
. Minerva lokhandwala project, Mumbai where I was worked as GET.
. Construction work of 300m Luxury Tower.
. The Automatic Climbing System (ACS) is a hydraulically operated self-
climbing formwork system used for the construction of tall concrete
structures such as building core walls and bridge pylons.
. The Automatic Climbing System is the latest development in climbing
formwork technology by PERI GmbH.
. Batching plant has capacity of 200 tones, production rate: 80 cum/hr.,
manufacturing Company: SSSI.
. SBP-35 Static boom placer work in 35 m radius & concrete pump produce
70 cum/hr.
. Monitoring and tracking day to day activities.
. Batching Plant concrete production and maintenance.
. Assist in the preparation of final records for the project.
. Proper planning, execution etc. to compete with the daily required
target. Quality Assurance & Quality Control on site and batching
plant.
P W D Berally (U.P)
June, 2011
. Construction work of Residential Building & Road in area of 10 acres
and 5 km respectively where I was worked as GET.
. Analysis of weekly progress report, daily & monthly tracking report,
daily, weekly & monthly structural invoice plans.
. Design a cross-section of road pavement, specifications of work &
testing of road material.
. To design of flexible pavement some of these design considerations
include design speed, design traffic volume, number of lanes, level of
service, sight distance, alignment, super-elevation, and grades, cross
section, lane width, horizontal and vertical clearance etc.
P W D Lucknow (U.P)
June, 2009
. Construction work of Jail in 20 acres where I was worked as JET.
. Responsible for planning of project activities i.e., material
planning, manpower planning, machinery planning and monitoring
regularly.
. Managing all cost analysis relating to the projects, from the initial
stage to the final closure.
. Find out quantities for different work to be done, had to keep a check
on measurement of work done daily.
. Coordinate with site for Quality system requirements.
VOLANTARY EXPERIENCE:
B E BILLIMORIA & Co. Ltd., Noida
June, 2013
. Supertech CapeTown City, ORB tower were 3 residential tower of 47th to
50th floor each where I was worked as GET.
. Experience of making bar bending schedule of 2m (height) circular raft
foundation, staircase, beams, columns and slabs by studying the
drawing and its execution at site.
. Analysis of Schnell Paradax machine and Comnsan tower crane which can
bend bar by speed of 2 tones/ hr. and height of crane from ground 30 m
respectively.
. Assist in preparing daily construction reports and contract items
list.
. Study contract drawings, specifications and shop drawings to insure
proper coordination of built-in-items.
. Checking Shuttering - Pre concreting and post concreting inspection.
. Execution of inspection according to Quality Plan applying appropriate
inspection procedures/techniques.
. Monitoring the performance of vendors and sub-contractors for
compliance with quality requirements.
PROJECT:
Performance Evaluation of Sewage Treatment Plant at HITM, Agra
2012-2013
. Major treatments are made in treatment plant on physical, chemical and
biological properties of wastewater.
. Performance evaluation of HITM sewage treatment plant of 300 KLD which
is based on biological treatment.
. The study was conducted to determine the pollutants level in final
treated water from sewage treatment plant HITM and compare with BIS
and World Health Organization (WHO) guidelines.
. Improving water quality of receiving water bodies (lakes and rivers)
through better treatment performance in the WWTP.
. Reducing the ecological footprint of the complete wastewater
treatment.
. Reducing disposal costs for sewage sludge (20%), reducing energy costs
25 %, and reducing pollution fees 20 % pollution charge for quality of
effluents.
Construction Analysis of Guest House at Chanduali (U.P)
2009-2010
. Individual planning for estimation of all required sides and
execution.
. Estimation from first to final competition of project.
. Analysis of full construction work from planning, designing,
surveying, excavation, execution & finishing.
. Calculations & Analysis requirement of total investment on project,
rate of material, requirement of manpower.
CIVIL ENGINEERING SKILLS:
. Knowledge of all general contract, subcontract documents, drawings,
specifications, and surveying instruments.
. Ability to read and interpret documents such as blueprints, safety
rules, operating and maintenance instructions, and procedure manuals.
. Shows initiative to perform duties beyond assignment-specific duties.
. Demonstrate self-motivation, maturity, management know-how,
leadership, and interpersonal skills.
. Ability to communicate well both verbally and in writing, present well
as a person.
. A basic understanding of accounting and cost control procedures.
. Experience of onshore civil / structural design management and
execution.
. Ability to produce technical specification and health, safety
awareness.
. Ability to interpret an extensive variety of technical instructions in
mathematical or diagram form and deal with several abstract and
concrete variables.
. Experience in various road construction and maintenance techniques.
. Ability to define problems collects data, establish facts, and draw
valid conclusions.
. Competent in the use of design manuals for Building & Tower.
. Knowledge of budgeting and the financial monitoring of projects.
. Competent in use of survey equipment.
. Experience on towers, building, road & retaining structures.
PERSONAL SKILL:
. Knowledge of Construction Planning and Building Designing with the
help of AUTOCAD & STAADPRO software's respectively.
. Basic knowledge of computer and programming languages like Visual
Basic & SQL.
. Frequent user of Operating Systems like, Windows98/2000/XP/Window
7/Windows.
. Good communication skills when dealing with clients, developers,
consultants, elected representatives and the public.
. Having a natural drive with a loyal, strong, and proactive work ethic.
. Creative and innovative, with good design skills.
. A team player with an enthusiastic attitude & proven motivational and
leadership skills.
. Skilled at analyzing and interpreting information.
. Having clarity and sound judgment.
ACHIEVEMENTS:
. Worked as an Active Member of Association of Civil Engineering Student
(ACES).
. Member in college annual fest GYAN-JYOTI 2011, HCST.
. College recommended for Indian Army & Navy 2011, HCST.
. Regional Football Meet played in Assam 2007.
. Indian Scouts & Guides Association, Rajya Puraskar, 2005.
. Easily adjust with environment and friendly nature.
. Having good communication skill with fluent control over English and
Hindi.
Date: 10th Aug 2013
[pic]