Sachin Vathare
312-***-****, *************@*****.***
Objective: Self-starter who applies experiences obtained through employment and up-to-date education to lead teams,support leadership, and make companies run more time- efficiently and cost-effectively. I can add value to your company through my experience, knowledge and my excellent oral and written communications skills, hard work, analytical approach, and being a productive and value added team member
Education: M.S. Construction Engineering and Management, Illinois Institute of Technology 12/2010
Cumulative GPA: 4.0/4.0
Certifications: 1. Construction Manager in Training, Illinois Institute of Technology
2. Student Leadership Institute, California State University, Fullerton
B.S. Civil Engineering, Walchand College of Engineering, Sangli Shivaji University 05/2007
Cumulative GPA: 3.6/4.0
Course Work: Planning & Scheduling, Construction Site Operation, Cost Accounting & Control, Economic Decision Analysis, Contract Administration, System Analysis in Civil Engineering, Construction Method and Cost Estimating
Technical Skills: Primavera P6, MS Project 2007/2010,,Net point, Last planner system, AutoCAD, R.S Means Cost works, MS Office
Experience: Project Controllers/ Planners/Scheduler Coordinator, Currently at Jacobs Engineering, Elkview, WV
USA (Since 02/2011 )
Interfacing with all functional areas such as Front End Engineering Design, Construction,
Procurement, Project Managers and Project services to estimate and complete commitments,
deadlines and other potential project information and generate Level 1 to Level 3 schedule.
Prepare Level 3 resource loaded schedule for shut down (Turn around) construction including Pre
shut down and Post shut down construction schedule
Prepare Level 3 construction schedule and take part in preparing construction scope of work for
respective project Supported the ongoing use of Resource loaded schedules to track project progress using earvalue management
Attend weekly team meetings to provide status reports and updates to team members and clients
including engineering, procurement and construction cost. Assisting in expediting equipment
purchase and delivery to meet deadlines. Lead project scheduling meeting and reviews
Consolidated and analyzed information to develop CPM schedule and Work Breakdown Structure
(WBS) and generate project schedule analysis report.
Performed critical path as well as cost risk analysis by identifying risks and analyzed root causes of problems, delay analysis
Discuss,coordinate and resolve long term,short term planning and scheduling problem with
personnel throughout the company and with contractor organization
Tracked PO’s by coordinating with procurement discipline to ensure the timely delivery of
equipment at site
Cost controller for capital projects for multiple clients. Responsible for project cost reporting which includes cost-benefit analysis, earned value graph, performance trending, and also complying with the project specific change management system
Providing accurate cost variance analysis of project based on comparisons including forecast v/s
actual, current forecast v/s prior forecast, and ITC's to assist the client in analyzing an d managing the cost control activities
Intern Engineer, Omkar Construction Pvt. Ltd, Kolhapur, India 06/2010-08/2010
Manage information integration from engineers, subcontractors, owners, and others to create an
integrated master schedule
Analyze major capital project to plan to effective execution sequence based on current industry
standard
Planed and provided work direction as required in the preparation of planning and scheduling
control system and practices to provide engineering,procurement and construction
Advised and support the Project Manager to meet the Contractual Objectives of the Project
Computed cost estimates for materials, purchased and leased equipment, subcontracted work,
production activities and labor including the application of alternative pricing
Developed project WBSs using the latest project planning and scheduling tool eg Primavera /MS
Project
Junior Engineer, PGV Consultant and Engineers, Jaysingpur, India 06/2007-12/2008
Assisted project manager as on-site junior engineer
Worked with project teams to identify and sequence key activities, create resource -loaded
schedules with key materials and resources, setting up the project baseline, updating progress and
reporting
Maintained resource loaded construction schedule and deviations from plans, specifications and
standards, and determined potential delays to the project using primavera P6
Review, monitor and critique the accuracy and realism of all schedules. Check schedule for
deviations, critical path accuracy, imposed (constrained) dates, durations, logic, sequencing, scope
of work (as a minimum). Challenge project team on critical schedule issues. Communicate critical
schedule issues and concerns
Assist Project Management in the monthly project forecast including validation of the projected fee
and percent complete forecast
Assured compliance of best management practices
Generated estimations for assigned projects
Prepared Auto CAD drawing for buildings
Guest Lecturer, J. J. Magdum College of Engineering, India 09/2008
Delivered guest lecture on GRE preparation to a class of 100 Student.
Volunteer Experience: Volunteer, Sky Rise Chicago Event 11/2010
Volunteer, Green Build 2010 Event, Chicago 11/2010
Member, U. S. Green Building Council (USGBC) 08/2010
Member, Constriction Management Association of America (CMAA) 01/2010
Coordinator, California State University Blood Donation Camp 05/2009
Event Coordinator, Walchand College of Engineering, Sangli, Shivaji University 01/2007-05/2007