Sachin Vathare

* ******* **** *******, *****

312-***-****, *************@*****.***

Objective: Self-starter who applies experiences obtained through employment and up-to-date education to lead teams,support leadership, and make companies run more time- efficiently and cost-effectively. I can add value to your company through my experience, knowledge and my excellent oral and written communications skills, hard work, analytical approach, and being a productive and value added team member

Education: M.S. Construction Engineering and Management, Illinois Institute of Technology 12/2010

Cumulative GPA: 4.0/4.0

Certifications: 1. Construction Manager in Training, Illinois Institute of Technology

2. Student Leadership Institute, California State University, Fullerton

B.S. Civil Engineering, Walchand College of Engineering, Sangli Shivaji University 05/2007

Cumulative GPA: 3.6/4.0

Course Work: Planning & Scheduling, Construction Site Operation, Cost Accounting & Control, Economic Decision Analysis, Contract Administration, System Analysis in Civil Engineering, Construction Method and Cost Estimating

Technical Skills: Primavera P6, MS Project 2007/2010,,Net point, Last planner system, AutoCAD, R.S Means Cost works, MS Office

Experience: Project Controllers/ Planners/Scheduler Coordinator, Currently at Jacobs Engineering, Elkview, WV

USA (Since 02/2011 )

Interfacing with all functional areas such as Front End Engineering Design, Construction,

Procurement, Project Managers and Project services to estimate and complete commitments,

deadlines and other potential project information and generate Level 1 to Level 3 schedule.

Prepare Level 3 resource loaded schedule for shut down (Turn around) construction including Pre

shut down and Post shut down construction schedule

Prepare Level 3 construction schedule and take part in preparing construction scope of work for

respective project Supported the ongoing use of Resource loaded schedules to track project progress using earvalue management

Attend weekly team meetings to provide status reports and updates to team members and clients

including engineering, procurement and construction cost. Assisting in expediting equipment

purchase and delivery to meet deadlines. Lead project scheduling meeting and reviews

Consolidated and analyzed information to develop CPM schedule and Work Breakdown Structure

(WBS) and generate project schedule analysis report.

Performed critical path as well as cost risk analysis by identifying risks and analyzed root causes of problems, delay analysis

Discuss,coordinate and resolve long term,short term planning and scheduling problem with

personnel throughout the company and with contractor organization

Tracked PO’s by coordinating with procurement discipline to ensure the timely delivery of

equipment at site

Cost controller for capital projects for multiple clients. Responsible for project cost reporting which includes cost-benefit analysis, earned value graph, performance trending, and also complying with the project specific change management system

Providing accurate cost variance analysis of project based on comparisons including forecast v/s

actual, current forecast v/s prior forecast, and ITC's to assist the client in analyzing an d managing the cost control activities

Intern Engineer, Omkar Construction Pvt. Ltd, Kolhapur, India 06/2010-08/2010

Manage information integration from engineers, subcontractors, owners, and others to create an

integrated master schedule

Analyze major capital project to plan to effective execution sequence based on current industry

standard

Planed and provided work direction as required in the preparation of planning and scheduling

control system and practices to provide engineering,procurement and construction

Advised and support the Project Manager to meet the Contractual Objectives of the Project

Computed cost estimates for materials, purchased and leased equipment, subcontracted work,

production activities and labor including the application of alternative pricing

Developed project WBSs using the latest project planning and scheduling tool eg Primavera /MS

Project

Junior Engineer, PGV Consultant and Engineers, Jaysingpur, India 06/2007-12/2008

Assisted project manager as on-site junior engineer

Worked with project teams to identify and sequence key activities, create resource -loaded

schedules with key materials and resources, setting up the project baseline, updating progress and

reporting

Maintained resource loaded construction schedule and deviations from plans, specifications and

standards, and determined potential delays to the project using primavera P6

Review, monitor and critique the accuracy and realism of all schedules. Check schedule for

deviations, critical path accuracy, imposed (constrained) dates, durations, logic, sequencing, scope

of work (as a minimum). Challenge project team on critical schedule issues. Communicate critical

schedule issues and concerns

Assist Project Management in the monthly project forecast including validation of the projected fee

and percent complete forecast

Assured compliance of best management practices

Generated estimations for assigned projects

Prepared Auto CAD drawing for buildings

Guest Lecturer, J. J. Magdum College of Engineering, India 09/2008

Delivered guest lecture on GRE preparation to a class of 100 Student.

Volunteer Experience: Volunteer, Sky Rise Chicago Event 11/2010

Volunteer, Green Build 2010 Event, Chicago 11/2010

Member, U. S. Green Building Council (USGBC) 08/2010

Member, Constriction Management Association of America (CMAA) 01/2010

Coordinator, California State University Blood Donation Camp 05/2009

Event Coordinator, Walchand College of Engineering, Sangli, Shivaji University 01/2007-05/2007



Contact this candidate