Paul-Phuong Ta
**** ********* ***** ***** *******, TX 77433
281-***-**** P h u o n gTa 7 2 @ y a h o o . c o m
SUMMARY
A dynamic, experienced, and result oriented Project Planner and Scheduler who posses clearly
defined skills in Project Planning and Schedule implementation, project management and
economics. In addition, I have the ability and experience to motivate individual and resuscitate
projects through goal definition and objective clarification.
E XPERTIES
o Ensures quality of work and performance of staff on assigned project.
o Ensures proper timing of schedule production credibility of schedules.
o Analyzes problem areas/productivity, flags deviation and consequences, recommends
actions.
o Prepares presentations for and participates in formal client/management reviews.
o Prepares/reviews project monthly progress reports - narrative, tabular, graphic.
o Assists Chief Planner/Scheduler with proposal schedules and performance evaluations.
o Provides training / coaching for less experienced department personnel.
o Develop Project Plan and Schedule with Primavera
o Posses years of experience in engineering and construction, project controls, including
scheduling, contracts, cost control, material procurement, fabrication and installation of
onshore and offshore facilities and pipelines in the international oil and gas industry.
o U.S. Citizen willing and able to travel 100%.
SOFTWARE AND RELATED SKILLS
o Project Management Tools (Primavera P6), Microsoft Project 2003, and Baan.
o Microsoft Office Suite
o Auto-CAD Drafting
o MatLab for Engineering
EDUCATION
o Graduated A.S. Degree in Applied Science at Lone Star College - 2011
o B.S Mechanical Engineering at University of Houston - 2015 Expected
PROFESSIONAL EXPERIENCE
2008- Present Enbridge Houston, TX
Project Planner/Scheduler
o Responsible for obtaining all the details for maintaining project schedule and ensure
timely completions of projects
o Review and analyze vendor progress reports and update project schedule along with
variance explanation
o Communicate schedule status and analysis to project team via written narrative and
briefings at regular meetings
o Drive process improvements within the team and across functions to deliver more
accurate project updates identify risk areas and improve on-time delivery
o Extensive use of company provided tools such as Primavera (P6)
o Revise and/or assign activity codes & WBS structure for baseline progress schedule
o Analyze critical path(s), schedule variance, and progress trends
o Establish and maintain a consistent operating routine to ensure project progress reports
are generated and issued on time.
2007-2008 Valero Houston, TX
Scheduler-Contractor
o Planned, developed and maintained several schedules of identified activities in a logic
based schedule using Primavera P6.
o Determined and analyzed critical path activities for identification of potential delay
impacts.
o Ensured the schedule work breakdown structure by Drawing and Construction packages
for the project scope defined by the Project Manager and Project Team.
o Informed the Project Manager and the Project Team as soon as possible of any
significant drifts or variation in the schedule
o Collected, updated and consolidated the physical progress follow-up for the project.
o Proposed and coordinated the corrective actions for reducing risk of delay, maintaining
floats and improving time control.
o Wrote the periodic progress reports in accordance with the Project Time Management
Plan and the Project Execution Plan.
2006-2007 Toshiba International Corp H ouston, TX
Production Planner/Scheduler
o Plans, prepares, issues and controls production schedule and material requirement to
ensure a controlled flow of approved materials timed to meet production requirements.
o Identifies raw material and component requirement for production from engineering and
production specifications and schedules.
o Coordinates material movement between warehouse and production areas.
o Advise management of the status of work in progress, material availability and potential
production problems to ensure that personnel, equipment, materials and services are
provided as needed.
o Interaction with outside suppliers and internal buyers.
o Assist management in resolving problems concerning over shipments, shortages,
engineering changes and cancellation of orders.
o Schedulers and expedites the movement of parts by means of move orders, stock
transfers and request for shipping orders