Muhammad Imran Jabbar
Objective:
MECHANICAL TECHNICIAN
To get career in the mechanical field with all of my potential, spirit,
experience and interest.
Work experience 11 years (Total)
Personal Information:
Name : Muhammad Imran Jabbar
Father's Name : Rana Abdul Jabbar (late)
N.I.C# : 34101-2617816-9
Passport # : AK8028161
Date of Birth : 14 JUNE 1983
Marital status : Married
Address : ST#7 Bisharat town more eman abad
Distt, Gujranwala Punjab Pakistan
Cell Pakistan : 0092-300-***-****
Home Pakistan 009*-*********
E-Mail : ***********@*******.***
Gender : Male
Religion : Islam
Domicile : Gujranwala Pakistan
Academic Qualification
DEGREE BOARD/INSTITUTE YEAR
DAE(3Years) Punjab board of 2001
technical education
Lahore
Matriculation Gujranwala education 1998
board
Experience:
1. Recently I am working with Fatima Fertilizer Company a big urea
producer in Pakistan as a Rotary mechanical Technician from March
2008.
2. SAUDI SERVICES COMPANY (SAUDI ARABIA) AS MECHANICAL TECH. FROM JUN
2005 TO 18 FEB 2008.
3. JAPAN POWER (135 MW DIESEL- GENERATION) AS MECHNICAL TECHNICIAN FROM
AUG 2001 TO MAY 2005.
Responsibilities included but not limited to:
Pumps-
- Complete overhaul boiler feed water pumps and check the journal
bearing clearance by plastic gauge, micrometers, dial indicator, led
wire system, scraping of journal bearing, maintain the bearing
contact with shaft, maintain the clearance of bearing with shaft,
check the crash of bearing and make report of failure causes of
bearings etc..
- Check the thrust bearing clearance, scraping of thrust pads and
maintain thrust clearance.
- Check the mechanical seal, replace the affected spring, carbon face
and hard face, o rings and make report of failure causes of mechanical
seal.
- Check the rotor run out including coupling area, bearing area,
mechanical seal area, and impeller and impeller wearing ring area. And
also check the clearance wearing ring. And also replacing the impeller
and wearing rings.
- Check and adjust the axial float in vertical horizontal pumps.
- Make alignment by (rim & face and reverse) methods.
- Remove the affected ball bearing and mount new bearing.
Hydro couplings (variable speed turbo coupling including gear box)
- Complete overhauling of hydro coupling, check journal bearing
clearance, scraping of journal bearing, maintain the bearing contact
with shaft and also maintain the clearance of bearing with shaft,
check the crash of bearing and make report of failure causes of
bearings.
- Check the thrust bearing clearance, scraping of thrust pads
and maintain thrust clearance.
- Check the gear backlash, clearance and maintain the clearance.
- Check the fusible plug and replace the plugs.
- Check the auxiliary lube oil and lube oil pump and lube oil
pressure control valves.
Turbine
- Complete overhauling the turbine, check journal bearing
clearance, scraping of journal bearing, maintain the bearing contact
with shaft and also check the clearance of bearing with shaft.
- Check the diaphragm, and labyrinth seal clearance.
- Check the steam nozzle HP/MP/LP stage blade of rotor.
- Check the alignment of rotor.
Compressor
- Complete overhauling of the L/Y type reciprocating compressor. Check
the bearing condition and
- Clearance & thrust clearance of crank.
- Check the main crank pin and cross head pin area and crank pin
bush bearing and cross head pin bush bearing.
- Check the cylinder wall clearance of LP / HP Stage piston.
- Check the piston head clearance of LP / HP Stage piston.
- Check and replace the piston rings and rider ring and oil
scraper ring.
- Check loading and unloading valve fix.
- Complete overhauling of centrifugal compressor, screw, Sliding vanes
compressors.
General Responsibilities:
- Maintenance, Trouble shooting and overhauling of all type rotary
industrial equipments.
- Mount the journal bearing and maintain the clearance with tunion.
- Maintain the back lash of girth gear with pinion.
- Maintain the alignment of main shaft with pinion, gearbox and motor.
- Complete overhauling of the turbine, check journal bearing
clearance, scraping of journal bearing, maintain the bearing contact
with shaft and also check the clearance of bearing with shaft.
- Check the diaphragm, and labyrinth seal clearance.
- Check the steam nozzle HP/MP/LP stage blade of rotor.
- Check the alignment of rotor.
- Leveling sub sole plates and sole plats and casing of turbine and
generator and governor unit
- Mount journal bearing maintain clearance, scraping of journal
bearing, maintain the bearing contact with shaft and also check the
clearance of bearing with shaft.
- maintain the diaphragm, and labyrinth seal clearance.
- Work on the steam nozzle HP/MP/LP stage rotor. Maintain the
alignment of casing and rotor.
Training
1. ELEMANTRY FIRST AID IN 2009 (PMA KARACHI).
2. BASIC FIRE FIGHTING IN 2009 (PMA KARACHI).
3. PERSONAL SERIVAL TECHNIQUES IN 2009 (PMA KARACHI).
4. PERSONAL SAFETY AND SOCIAL RESPONSIBILITY IN 2009 (PMA
KARACHI).
5. OIL TANKER FIRMALIZATION IN 2003 (PMA KARACHI).
Computers Skills
I have also very good knowledge in Computer software, Windows
XP/VISTA& 7, MS Office, Internet browsing etc
RESUME