HASMUKH H. PATEL, P.E.
** ********* ****** . ******, ** 08817 . 732-***-**** (H) . 732-***-****
(M) . ***************@*****.***
Summary
Over 30 years of professional experience in design, implementation in the
civil engineering field, covering all areas of structural design. 10 years
of extensive application of quality focused and customer driven project
management. Trained to work under pressure as a motivated and enthusiastic
project leader; to take initiative; a self-starter with proven ability to
lead design groups and to exceed the expectation in delivering quality
solution while meeting time frame.
Professional Experience:
New York City Transit Authority
June 1982 to July 5, 2013
I have worked on many different projects during my employment
and my responsibilities are as follows:
. Site visits for survey of existing conditions and feasibility study
. Design kickoff, design review, and design coordination and progress
meetings
. Preparation of soil exploration and review of boring logs
. Engineering layout
. Preparation of job specifications, design criteria and mam hour
schedule
. Determinations of applicable building and material codes
. Load determinations for structures and foundations
. Preparations of Engineering design calculations and reports
. Coordination of civil work with other engineering disciplines and
contractors
. Review and approval of shop drawings, as-built drawings and submittals
submitted by contractors
. Review and approval of temporary support design calculations and
drawings submitted by contractors
. Prepare response of RFIs submitted by contractors
. Field visit and resolve field problems, prepare amplifying sketches,
drawings
. Field inspection to ensure construction conformity to contract
drawings and resolution of field problems as well as check final as-
built drawings based on actual construction in the field
Project Engineer
May 2003 to July 5, 2013
Mainly I worked as a Project Engineer in the Infrastructure and
Facilities program area. I am responsible for the following:
. Supervise and implement cost effective structural design and review
process for several multi-million dollar projects. Supervise, train
and evaluate staff performance. Schedule enhanced software training,
technical seminars and safety training for my technical staff members.
. Develop scopes of work, review contract documents and drawings to
ensure conformity with T.A. drafting standards and guidelines as well
as all applicable specifications and building codes.
. Coordination with different disciplines to reflect to the scope of
work, Project Management Procedures and Constructability.
. Technical coordination with User Departments, Construction Manager's
offices and Contractors. Prepare response for Bidder's questions
during bidding process. Prepare addendum drawings. Resolve field
problems during construction. Prepare amplifying drawings. Review
design calculations and drawings of Contractors for temporary supports
and shielding. Review and answer RFI's of Contractors for all projects
in the program area.
. Supervise and implement cost effective structural design and review
process for several multi million dollars projects in Signal and
Communication Program area.
. Recently I worked on Restoration of old South Ferry Station and
Modification of Platform girders at
Atlantic Avenue Station.
. Recently I worked also on Rehabilitation of 9th Avenue Station,
Rehabilitation 4th Avenue Line Tunnel and Communication rooms Upgrade
and Expansion.
Civil Engineer Level III
October 1999 to April 2003
I worked on following major projects:
. Reviewed shop drawings, RFIs, resolve field problems for Stillwell
Avenue Project.
. Reviewed shop drawings, RFIs, resolve field problems for Canarsie Line
Project.
. Prepared final design documents for Restoration of Service, 1 and 9
lines.
. Prepared final design documents for Rehabilitation of Canarsie Line
Project.
. Reviewed final design documents for Reconstruction of Subway Station
Ventilator Replacement.
. Prepared final design documents for Rehabilitation of Stillwell Ave.
Terminal - Phase 2.
. Reviewed and monitored design and shop drawing EFA, design schedules
and coordinated project review meetings.
Administrative (Sub Division) Engineer
June 1993 to September 1999
. Prepared design documents for Rehabilitation of Canarsie Line and
Reconstruction of Subway Station Ventilators Replacement.
. Prepared and Coordinated design documents for Bus Depot Signal Relay
Room, Police Facility, and Bulkhead Rehabilitation.
. Reconstruction of the Stillwell Avenue Terminal.
. Reviewed and monitored design and shop drawing EFA, design schedules
and coordinated project review meetings.
Project Design Engineer
May 1990 to May 1993
. Squad leader on several projects: Construction of new fan chambers,
Rehabilitation of fan chambers and pump rooms, Replacement of
elevators and escalators.
. Reviewed contract drawings, specifications, and shop drawings.
. Coordinated project review meetings.
. Coordinated contract documents with other disciplines.
Civil Engineer
August 1986 to April 1990
Assistant Civil Engineer
June 1982 to July 1986
. Designed, analyzed and prepared contract drawings.
. Responsible for cost estimation of Subway Structures, such as
underground and above ground substations, circuit breaker houses
signal enclosures, pump rooms, fan chambers.
. Responsible for reviewing and approving shop drawings.
Public works Department
Gujarat State, India
Junior Engineer
March 1977 to September 1980
. Survey, Design and Drafting of Irrigation Structures
Education:
M.S., Civil Engineering (Structural), New Jersey Institute of Technology,
Newark, U.S.A. 1982
B.E., Civil Engineering, Sardar Patel University, Gujarat State, India,
1975
Professional Licensed Professional Engineer, NY State,
since 1986
Registration Member of American Society of Civil
Engineers
& Affiliations: Member of the Institute of Steel
Construction
Computer Skills: Micro Station, Construct ware and Microsoft
Office
References and course transcripts available upon request.