Post Job Free
Sign in

Manager Plant

Location:
United States
Posted:
July 20, 2013

Contact this candidate

Resume:

Curriculum Vitae

Marian Stancu

Industry Senior Manager

Personal Details

Name: Marian

Surname: Stancu

Phone: 004**********

E-mail: *********@*****.***

Executive Summary:

. More 20 years experience in construction, commissioning, operation and

maintenance for the energy, utilities and HVAC in oil&gas and

petrochemical field.

. Chartered Energy Auditor grade I and Chartered Energy Manager

. Good comercial knowleges and abilities on the gas and energy market.

. Strong theoretical and practical background in large area of static

and dynamic equipments.

. Good knowledge of instrumentation, control panels and DCS.

. Good management, technical, communication and working skills ;

. Proactive approach to decision making and team works ;

. Good hands-on abilities and willingness to work with and coach junior

staff ;

Expertise:

. Technical: Mechanical / Electrical experience in engineering systems,

industrial boilers, HRSG, pumps, HVAC, LPG and Oil Measurement Skids,

frequency converters, air and gas Compressors, cogeneration, steam

systems, DHW skids, Chillers, Cooling Towers, Purified Water Systems,

waste water treatment, Low/High voltage Electrical Systems, Preventive

Maintenance Systems.

. Professional: Ability to read, understand and operate P&ID`s. Good

technical understanding of power system and mechanical services.

Ability to work and make good / logical decisions under pressure.

Enthusiastic about environmental issues and renewable energy.

Education

1. Industry

. Training course for oil burners- SAACKE GmbH - Germany

1995

. Cogeneration training - gas turbines and HRSG - EGT- U.K.

1995

. Training course for HVAC systems CIAT - Culoz France

2001

. Training course for Low Nox burners SAACKE GmbH - Germany

2002

. Training course for oil burners, gas and mixt burners - RIELLO - ITALY

2004

. Three training courses and documentation visit for FERROLI HVAC

systems

FERROLI Spa - San Bonifacio Italy

2002-2006

. Emerson Global User Exchange - Dusseldorf

2012

2. Academic

. TECHNICAL UNIVERSITY Gh Asachi, Iasi (Romania)

Dipl.Eng. in Mechanics (master eng.) - Thermal Engineering

1989

. Technical Construction University Bucharest (UTCB)

2010

Energy auditor grade I (highest) for buildings and HVAC systems.

. Politechnical University Bucharest (UPB)

2011

Chartered Energy Manager for Industry - post universitary course

. Foreign Languages: english - advanced

french - basic

german - beginner

Work Experience

Period: May 2008 - present

Position: Head of Energy & Utilities

Company & Location: Energy Bio Chemicals - CAROM Branch

Report to: Branch Director and to CEO.

Responsibilities:

. I am the main responsible for continous operation, P&L balance and

life-cycle cost analysis regarding energy and utilities sistems.

. I coordinate all activities relating with participation to the free

power and gas market, with more 1 milion euro/month turnover.

. I lead all Operations & Maintenance activities to ensure the

continuous and uninterrupted supply of utilities to all customers

(internal and external)

. I lead the construction, commissioning, operation and maintenance for

the new energy & utilities facilities

. Lead the technical expertise and provide engineering knowledge for

troubleshooting complex engineering problems, for the bottlenecking at

the construction or operation stage.

. Develops and seeks approval for annual manpower and resources budgets,

and monitors performance to ensure activities are appropriately

supported and within approved schedule and budget levels.

. Develops and gains approval for Quality Management procedures to guide

and direct the achievement of engineering objectives.

. I coordinated the tender inputs and deliver the technical approval of

key engineering documents.

. Ensures compliance with HSE Standards.

Starting 2012 I`m part of the leading team witch coordinate one big project

( more twenty milion euros ) in the petrochemical field - desulphurisation

and selective hydrogenation for the C4 fraction upfront of the butadiene

factory.

This is one international project with UOP (a Honeywell

company) and one big EPCM Company. I had participate in the UOP head office

in Des Plaines, IL - USA to the PFD Review Meeting and P&ID Review

Meeting. In this moment I`m involved in coordination of the detailing

design and the procurement for the main equipments and the hydrogen plant.

Period: 1990 - May 2008

Position: Head of Energy & Utilities, Utilities plant manager / Department

Head

Company & Location: CAROM, Onesti (Romania)

Report to: Technical Director

Responsibilities:

I lead the specific activities for:

- Industrial refrigeration plant with compression of propylene or ammonia,

ammonia-water and BrLi - water absorbtion (TRANE) and steam ejection (-12,

-7, 0 and +7 Celsius deg.) More 50 MW cooling capacity.

- Compressed air, liquid nitrogen and oxygen by air separation (three units

of 1500 Nm3/h of N2)

- Raw water plant, cooling towers & pumps (more 60 MW cooling capacity),

firefighting systems

- Steam boilers more 250 t/h

- High and medium voltage power station (2 x 40 MVA)

- utilities network

Main achievements:

I was the main responsable for:

. Construction, commissioning, operation and maintenance of three big

thermal (steam) plants (25, 80 and 185 t/h at 36 and 15 bars) with

natural gas and heavy oil (SAACKE rotary cup and steam atomising)

burners.

. Introducing of a new chemical treatment for make-up and boiler water

with NALCO Chemicals

. Construction of a new refrigeration plant ( 1.5 MW at -70C) for

polymerisation plant

. Modernising of the steam producing and distribution systems through

introducing alternative fuel and new insulation systems

. Construction of a new nitrogen plant (PSA process) with AtlasCopco

. Modernising of the huge compressed air systems through introducing of

the new and efficient compressors Mattei - Cameron, and new and

automatisated dry station Gardner Denver

. Modernising the cooling & raw water pumping systems through

introducing frequency converters for water pumps

. Construction, operation and maintenance for big domestic and

industrial HVAC systems (up to 9 MW).

In parallel: HVAC Technical Manager (part time) - for a small private

company 1997 - 2009

. I was 50% shareholder and part time employed as Technical Manager in

a business with HVAC equipments specially: FERROLI, RIELLO,CIAT,

YORK, McQUAY, SAACKE, WILO, SCHMIDT&BRETTEN.

. In this time I participated to the sales, mounting, commissioning and

service for wall hung boilers, more 100 hot water and steam boilers

and burning plant for municipalities and private companies, a lot of

air conditioning systems, more 25 water chillers applications, 22 big

district thermal station with hot water boilers.

. I provided commissioning team with technology requirements for

engineering applications

. I provided technical support to the project on commissioning,

operating procedures and troubleshooting

. I applied engineering technical expertise related to design,

specification and operation of facilities

. Participated in and assisting with the co-ordination of the

Project's performance test(s).

. Reviewing commissioning deliverables issued by Contractors and

Suppliers

. Contributing to the Commissioning Group's improvement process

and close-out report.

1998 - 2004 (part time) SAACKE Service & Commissioning Engineer

(industrial burners).

In this time I participated to the erection, commissioning and post-

guarantee service activity for much more twenty-five Saacke applications in

power, industrial and naval The main activities was:

. Technical support to commissioning staff

. Cooperation for the equpments hand over from construction to

commissioning with the preparation of detailed schedule and listing of

the punch points

. Participation to the inspection for punch list definition

. Supervision and checking the pre-commissioning activity that are

managed by the boiler vendor personnel

. Boiler delivering to Germanishe Lloyds Register, TUV, ISCIR (romanian

autorities for pressure equippments)

. Training on the job for commissioning staff and for the Client staff

Computer Literacy

MS Office Internet

MS Project Acrobat Reader

Marian Stancu main references:

. BBG ALUM Tulcea - one steam boiler 220t/h ; 110 bars -eight SAACKE rotary

cup burners in parallel operation - mix ( gas + oil ) burners (boiler

efficiency consultant)

. CAROM Onesti - two steam boilers 70t/h; 16 bars - two SAACKE

rotary cup oil burners /pcs.

. CAROM Onesti - one steam boiler 25 t/h ; 36 bars - SAACKE

steam atomizing oil burner

. DAMEN Shipyard Galati - six double flame tube steam boilers 15 t/h ; 7

bars with two oil burners - SAACKE rotary cup in parallel operation to the

petroleum tankers

. DAMEN Shipyard Galati - six flame tube steam boilers 1,5 t/h ; 7 bars

with oil burners - SAACKE rotary cup to the petroleum tankers

. INTERAGRO Vegetable oil factory Rosiori de Vede - two steam boilers 10

t/h ; 12 bars oil burners - SAACKE rotary cup

. INTERAGRO Sugar factory Zimnicea - two steam boilers 40 t/h; 15 bars one

oil SAACKE rotary cup burner/pcs.

. SEVERNAV Shipyard Drobeta Turnu Severin - one steam boiler 2t/h ; 8 bars

to gas tanker, SAACKE oil rotary cup burner

. STRATUSMOB Blaj - one steam boiler 50t/h ; 100 bars with eight SAACKE gas

burners in parallel operations

. YEAST Factory Chisinau - Moldavia Republic - one steam boiler 4 t/h 12

bars ; one SAACKE gas burner for HKB Nederland

. RADET Casa Presei Bucharest - two superheated water boilers 45 Mw ; 1850C

- 16bars with one SAACKE mixt burner ( gas and oil rotary cup), each (

CCT - Italian boilers)

. PETROM Romania - cogeneration plant 2 x 2.5 Mw - PRATT&WHITNEY Gas

turbines, with SAACKE / ECLYPSE post combustion plant and HRSG.

. TERMON Onesti - 42 hot water boilers between 800 - 3400 kW, RIELLO gas

burners

. HOLCIM Alesd - Rotary cement dryer - with one rotary cup burner - 18 MW

(heavy oil) with two air stages

. PROCTER & GAMBLE Timisoara - detergent dryer - mixt burner - 8MW (gas &

light oil)



Contact this candidate