** **** ****, *******, *********, g** *lh
014*-***-**** / 075******** / ************@*****.***
jOHN fORSYTH
Personal Profile
I am a key team player with a 'can do' attitude, I am willing to learn new
skills and try new ways of getting a job done. I am confident and
reliable, always willing to help others to ensure workload is managed
within the team.
I work well under pressure and prioritise tasks to ensure deadlines are
met.
With a friendly and outgoing personality I am confident when communicating
with fellow staff members, management and members of the public.
I hold a current CSCS card that is valid until May 2016 for General site
Operative and working at heights, I also hold a IPAF ticket valid until
march 2017 for types - mobile vertical 3a and mobile boom 3b.
Education
2000 - 2004 Clydebank High School
Standard Grades - English 3, Maths 2, Physics 3, Mod Studies 2, German 2,
Craft and Design 1.
Work Experience
Febuary 2013 - Present
Roof Sheeter
Within this role I was responsible for the installation of kalzip stand and
seem roof coverings
December 2012-Febuary 2013
Solar roofer
within this role I have responsible for the full installation of solar
panels and roof repairs.
January 2010 - August 2012 - MCM Systems
Roofer
In this role I carried out various tasks in the preparation of single
membrane roof coverings and onsite installation of MCM panel systems while
working from drawings. I ensured that I worked to the health and safety
regulations at all times onsite, taking consideration for myself and those
I work with.
During my time with MCM Systems I travelled around the UK at various sites.
August 2008 - December 2010 - Labelgrahics
System Operative
Within this position I was operating a rewind inspection machine. I was
responsible for the quality control of the jobs, this included for
authorising jobs to be dispatched or to be reprinted.
August 2007 - July 2008 - Skyform
Concrete Finisher
Within this position I was working as a concrete finisher responsible for
maintaining a high standard of finish and ensuring the correct mix of
concrete. Again this role involved quality control and responsibilities to
ensure high standards of work.
September 2006 - July 2007 - Crystal and Hill
Removal Assistant
In this position I was responsible for the delivery and fitting of office
furniture all over Scotland.
June 2005 - August 2006
Roofer
Apprentice roofer, slater, tiler and rough caster. I served a year between
working on site with tradesmen and attending College. I was learning all
aspects of the trade while on site. I was made redundant at end of first
year due to a lack of work within the company.
References
Robert Mcneil, Director/owner, MCM Systems, 078********
Stuart Gray, Production Manager, Labelgraphics, 014********
Eddie Owens, Director/Secretary, Labelgraphics, 014********