CURRICULUM VITAE

NAME: Patrulescu Ion .

NATIONALITY: romanian.

CIVIL STATUS: married with 2 children

ADDRESS: Strejnicu Village, No. 596, Targsoru-Vechi,

Prahova County, Romania

PHONE: +407********

E-MAIL: *************@*****.***.

EDUCATION

Campina Chemistry High School Chemical Operator.

Foreman Technical School, Petrochemical Foreman.

SKILLS AND ABILITIES;

Ms Office Knowledge.

Dcs Operation Delta V By Emerson

Excellent Technical, Communicational And Interpersonal Skills .

WORK EXPERIENCE:

2012 MAY-NOVEMBER

Commissioning supervisor-Arak-Iran RFCC,

Operation Supervisor Panel Operator consultant for

start up,

Operation Supervisor Field Operator consultant for

start up.

2010-JANUARY-DECEMBER

Pre-Commisioning, Commisioning - Faregh, Libya

Field Operator Gas Plant start up

JOB DESCRIPTION

-subdivide the plant into systems and define, for each system the list of

relevant components;

-prepare precomm-commissioning and performance tests schedule

showing required level of details, verifying that activity duration is

acceptable and that work sequence is logic;

-prepare precomm- commissioning, and performance tests

personnel organization chart,indicating all job positions with the

relevant reporting and coordination lines;

-prepare precomm-commissioning and performance tests personnel

schedule with indication of number of personnel, duration of personnel

presence at site, duration of Vendor and Licensor representatives presence

at site;

Update precommissioning quality control plan;

Strength in Rotating equipments, motor test run/functional test check

&commissioning, mainly pumps and its lube oil system pre-commissioning&

commissioning.

Also having experience in pre-commissioning& commissioning of static

equipments like heaters/ Vessels / Reactor/ Columns/ tanks and with its

internal inspection of installation & associated pipe work .

Pre comm& commissioning ask per Vendor procedures for rotating

equipments inspection, no load run test, functional run test &internal

inspection of static equipments for its internal installations.

Process loop /piping flushing by applying different methods (water/

air/ nitrogen /chemical cleaning etc).&re-instatement .

P&IDcheck for system readiness for mechanical completion,punch list,

co-ordination of mechanical completion in accordance with procedures.

Preparation &planning for operational test procedures together with

all functional test requirements for various system for the dynamic

commissioning of the unit.

Pre-comm& commissioning activites &Test run Aux.Boilers,steam super

heater,flare&rotating equipments .

2009-JANUARY-DECEMBER

Petrotel-Lukoil Ploiesti, Romania(Oil-Refinery)-Fg-Fcc Unit (UOP

License) - Fg-Foreman.

Fg Process,

Gas Concentration And Stripping,

Uop Merox For Gas And Gasoline,

Gasoline Debutanization,

Gas Fractioning;

JOB DESCRIPTION:

- preparing the unit for start up after optimixture modernization;

- accidental and normal shutdown operations;

- start up after overhaul;

- start up operations for fcc-fg unit;

2008-FEBRUARY-DECEMBER

Commissioning Supervisor-Rabigh-Refinery

Oil And Gas -Technicas Reunidas Gulf-Spain

Amine Regeneration Unit

Sour Water Stripping Unit

C4 Isomerisation

C4 Alkylation

Sulphuric Acid Plant

Sulphur Recovery Unit .

JOB DESCRIPTION

-subdivide the plant into systems and define, for each system the

list of relevant components;

-prepare precomm-commissioning and performance tests schedule showing

required level of details, verifying that activity duration is acceptable

and that work sequence is logic;

-prepare precomm- commissioning, and performance tests personnel

organization chart,indicating all job positions with the relevant

reporting and coordination lines;

-prepare precomm-commissioning and performance tests personnel

schedule with indication of number of personnel, duration of personnel

presence at site, duration of Vendor and Licensor representatives presence

at site;

Update precommissioning quality control plan;

Strength in Rotating equipments, motor test run/functional test check

&commissioning, mainly pumps and its lube oil system pre-commissioning&

commissioning.

Also having experience in pre-commissioning& commissioning of static

equipments like heaters/ Vessels / Reactor/ Columns/ tanks and with its

internal inspection of installation & associated pipe work .

Pre comm& commissioning ask per Vendor procedures for rotating

equipments inspection, no load run test, functional run test &internal

inspection of static equipments for its internal installations.

Process loop /piping flushing by applying different methods (water/

air/ nitrogen /chemical cleaning etc).&re-instatement .

P&IDcheck for system readiness for mechanical completion,punch list,

co-ordination of mechanical completion in accordance with procedures.

Preparation &planning for operational test procedures together with

all functional test requirements for various system for the dynamic

commissioning of the unit.

Pre-comm& commissioning activites &Test run Aux.Boilers,steam super

heater,flare&rotating equipments .

2005-2008-FEBRUARY:

Petrotel-Lukoil Ploiesti, Romania(Oil-Refinery)-Fg-Fcc Unit (UOP

License) - Fg-Foreman.

Fg Process,

Gas Concentration And Stripping,

Uop Merox For Gas And Gasoline,

Gasoline Debutanization,

Gas Fractioning;

JOB DESCRIPTION:

- preparing the unit for start up after optimixture modernization;

- accidental and normal shutdown operations;

- start up after overhaul;

- start up operations for fcc-fg unit;

2002-2005: Petrotel-Lukoil, Ploiesti- Romania, Fg .Fcc unit (UOP

license) panel operator.

Fg Process

Gas Concentration And Stripping

UOP Merox For Gas And Gasoline,

Gasoline Debutanization,

Gas Fractioning

JOB DESCRIPTION

- start up operations for fcc-fg unit

- accidental and normal shutdown operations

- start up after overhaul

- make sure that the analysys in the standard limit

1992-2002: Petrotel-Lukoil-Ploiesti, Romania

Propane Asphalt Removing-Process-Foreman.

Gasoline-Etyle

JOB DESCRIPTION:

- pre-commisioning,commisioning and start up plant

- presure leaking tests

- detecting tehnological pipelines

- preparing the unit plant for start up

- start up operations

- start up normal

- accidental and normal shutdown operations

- start up after overhaul

1983-1992: Verachi S.A. Giurgiu - Romania

Epichlorohydrin, Process Foreman.

JOB DESCRIPTION

- pre-commisioning,commisioning and start up plant

- detecting tehnological pipelines

- presure leaking tests

- preparing the plant for start up

- start up normal

- accidental and normal shutdown operations

- start up after overhaul

1980-1983: Petrotel Ploiesti-OLEPHINES PLANT

-Demetanizer- Deetanizer Panel operator and Depropanizer- Debutanizer

Panel Operator

-Ethane-Ethylene & Propane-Propilene Field Operator

JOB DESCRIPTION

- pre-commisioning, commisioning and start up plant

- detecting tehnological pipelines

- presure leaking tests

- preparing the plant for start up

- start up normal

- accidental and normal shutdown operations

- start up after overhaul

- average operations (pipe, reboiler, heat exchanger, or collumn

leaking or in absence of water, steam, air, energy.

- make sure that they are in standard limit

1976-1980: Petrotel-Ploiesti-DAV3 Unit

stoker-field operator

JOB DESCRIPTION:

- pre-commisioning,commisioning,start up

- detecting tehnological pipelines

- presure leaking tests

- preparing the plant for start up

- start up normal

- accidental and normal shutdown operations

1974-1976: Vega Refinery Ploiesti-Thermal Cracking Unit

field- operator

panel-operator

Languages: english(medium)

Driver License: B category .