Post Job Free
Sign in

Supply Chain Project

Location:
Plano, TX, 75024
Salary:
60000
Posted:
July 02, 2013

Contact this candidate

Resume:

PROFESSIONAL SUMMARY

. Industrial Engineering student interested in pursuing a career in the

field of process planning and control where I can professionally

utilize my Technical skills

. Hands on implementation experience in CAD Modeling, Time Study, Lean

Techniques, Root Cause Analysis, Failure Mode Effect Analysis (FMEA)

. Done 5S, Statistical Process Control, Value Stream Mapping, 8D, DMAIC

EDUCATION

Master of Science, Industrial Engineering

Graduation: May 2013

The University of Texas at Arlington

Bachelor of Engineering, Mechanical Engineering

Graduation: May 2010

Anna University, India

PROFESSIONAL EXPERIENCE

Project Associate, Indian Institute of Technology Madras

June 2010- Apr 2011

. Designed a Solenoid valve for a project sponsored by Indian Space

Research Organization

. Maintained constant force throughout the stroke length of the valve

. Carried out CAD modeling using AutoCAD and analysis with the help of

ANSYS

Manufacturing Intern, India Pistons Ltd Chennai India

May 2009- July 2009

. Led the design & implementation of Process Failure Mode and Effect

Analysis (FMEA) Project for Diesel Locomotive Piston Manufacturing

process

. Streamlined the production & assembly lines having over 30 machining

centers

. Assessed the quantitative & qualitative risk of manufacturing

processes by charting (Ishikawa Diagram) cause and effect analysis

Quality Engineering Intern, Hyundai Motor Company Chennai India

Aug 2009-Nov 2009

. Operations Excellence - Quality Control, Committed Service, Package

Visibility.

. Involvement in quality improvement and cost saving techniques.

PROJECTS

Logistics Distribution System Design

. Worked on a project for GENCO, Fort worth where the main focus was on

improving the returns section of the their layout so as to accommodate

more cell phones in the facility

. Proposed improvements to the existing design of the workstation and

the ongoing sorting process

. Suggested usage of better material handling methods

Time Standards Project

. Time series techniques were employed to reduce food wastage by

forecasting the number of students visiting the cafeteria

. The data's were collected over a period of time in a cafeteria

(Aramark, UTA)

. Number of students visiting the cafeteria in the future were

effectively predicted with the help of Time series modeling

Facilities Planning and Design

. Designed an improved facilities plan the CW sports industry

. Made changes to the existing layout of the facility using AutoCAD

. Recommended use of better material handling equipments suggested

methods to increase the storage capacity and throughput

COMPUTER SKILLS

. Supply Chain Tools - 6 Sigma, Supply Chain Guru

. Business Intelligence Tools -MS Visio, MS Office, SAS enterprise

miner, MiniTab

. Modeling Tools - AutoCAD, Solid works, CATIA,

. Analysis Tools : Ansys, Fluent Gambit, Labview



Contact this candidate