Post Job Free
Sign in

Electrical Engineer

Location:
Calcutta, WB, 700052, India
Salary:
USD80,000
Posted:
April 18, 2012

Contact this candidate

Resume:

CURRICULUM VITAE (CV)

Name : Vedantam Hari Narayana

Date of Birth : 05.06.1963

Address for Communication :

Vedantam Hari Narayana

Flat No.3/9, Block No.-N,

AWHO, Opp: Haldiram,

VIP Road, Kolkata-700052,

West Bengal, India.

Telephone: (M) +91-900**-*****.

Email: ********.****@*******.***;

************@*****.***

Member of Professional Institutions Bodies

Fellow Member of “The Institution of Engineers (India)” (FIE).

Education:

Certified Chartered Engineer in Electrical Engineering discipline.

Master of Business Administration (MBA) from Indira Gandhi National Open University, New Delhi, India (1999)

AMIE, The Institution of Engineers (India), Calcutta, India (1993)

Diploma in Electrical Engineering, Board of Technical Education, A.P., India (1984)

Key Qualifications

Have more than 25 years of professional experience in planning, estimation and construction and maintenance of Airports. Have Rich experience in Preparation of Maintenance Manuals and quality control methods.

I am very much familiar with International Civil Aviation Organisation (ICAO) and FAA Standards and recommended practices and Federal Aviation Authority recommendations for visual and navigational Aids for airport systems and IEEE, IS and NEC codes for Electrical systems.

During my professional experience lot of decisions have been taken to obtain better technical results, economically viable to the management with safety and security to the staff.

Other courses/Training

Diploma in Energy Management & Audit conducted by AP Productivity Council

Attended Executive training program on Outsourcing Management in IIM, Bangalore

Employment Record:

June, 2010 to till date: Parsons Brinckerhoff India Pvt. Ltd

Principal Engineer-Electrical

Client : Airports Authority of India

Project : Kolkata International Airport Project

(Project Cost INR 2500 Cr.)

As Senior Electrical Engineers, responsible for:

Reviewing Electrical designs of 33/11KV and 11KV/415 Volt Electrical substations, specifications of Power and distribution transformers, 11KV and 415Volts Diesel Generator sets, Power supply distribution system, Internal Electrification, internal lighting and external lighting, Main and sub distribution panels. Approval of shop drawings, and preparing alternate design for Electrical Distribution systems, Supervision of Construction activities, Quality control.

Review of material submittals, clarifying RFIs, clearing WIRs, corresponding with the contractor on behalf of client and certifying the bills.

Jan’ 2010 to June’ 2010: ETA Ascon

Sr. Electrical Engineer

Client : Dubai Civil Aviation

Project : Dubai International Airport

(Project Cost 1.8 Billion Dollars)

As Senior Electrical Engineers, responsible for:

Design & Construction of internal electrical installations and coordination with other services such as Mechanical, plumbing services etc.

Coordinate with design wing and the Consultant to get the drawings approved.

Oct 2007 to Dec’2009: Bangalore International Airport Limited

Maintenance Manager-Airfield Services

Client : Bangalore International Airport

Project : Bangalore International Airport Limited

(Project Cost INR 2800 Cr.)

As a Maintenance Manager responsible for:

Inspection of works and perform quality checks related to Airfield lighting, Electrical substations, Distribution transformers, Standby Diesel Generation sets up to 1500KVA, External & internal lighting, Internal Electrification, Main and sub distribution panels, Building management system, earthing, preparation of works manuals, standard operating procedures, preparation of periodical preventive maintenance schedules. Coordinate with DGCA officials for inspection of the installations, comply the observations of DGCA officials and obtaining the licence for operation of Airport.

Aug, 2006 to July, 2007: GMR Airports Limited, Hyderabad

Asst.GM-Airport systems & Building Services

Client : Hyderabad Airport Limited

Project : GMR International Airport, (Project: INR 2500 Cr)

As Asst. GM - Airport systems & Building Services, responsible for:

Review the designs supplied by the executing agency, correlating the designs with the National & International standards for the works of Airfield lighting systems, 33/11 KV & 11KV/415 Volts Electrical substations, Internal Electrification, External & internal lighting, Main and sub distribution panels. Review the designs of HVAC and Building management system (BMS). Review the designs for Selection of pumps and distribution of network and Fire fighting system.

Design and execution of Airport lighting systems, Selection of location of Navigational aids (PAPI), illuminated Landing Tee, and illuminated Wind cone, illuminated singes for runway, taxiway and Instrument Landing systems, Glide path & Localizer, DVOR.

Inspection of equipment at Factories workshop, Supervision of execution works performed by the contactor, ensuring Quality standards while execution, verification and passing contractors bills.

July, 2003 to July, 2006: Airports Authority of India

Senior Manager- Electrical

Client : Airports Authority of India

Projects : Civil Aerodrome, Rajamundry, Andhra Pradesh as Airport Controller &

Maharana Pratap Airport, Udaipur, Rajasthan as Senior Manager-Electrical

As Airport Controller responsible for:

Responsible for Operation of Airport, Administration and estates and coordination for development works of Civil Airport, Rajahmundry.

As Senior Manager-Electrical responsible for:

Executed the work of augmentation of power supply, installation and commissioning of 33/415volts Electrical substation, 750 KVA DG sets, Apron lighting and Taxi way lighting system at Maharana Pratap Airport at Udaipur, Rajasthan. Executed and supervised maintenance of all electrical and mechanical installations including Baggage handling system, pump sets, elevators at Maharana Pratap Airport, Udaipur, Jodhpur, Jaisalmair and VOR Station Pratapgarh. In-charge for electrical works execution & maintenance of equipments installed at technical building, navigational aid units.

June, 1997 to June, 2003: Airports Authority of India

Manager (Electrical)

Client : Airports Authority of India

Project : Execution and Maintenance works of Technical/Radar Buildings, Airport Colony and Juhu Airport.

As Manager (Electrical) responsible for:

Commissioning the works of 11 KV substation, 11/0.433 KV substation, 270TR HVAC system, Internal Electrifications works, Fire fighting system, 750 KVA DG sets Provided at New ATS complex at CSI airport, Mumbai. Commissioning the works of 11 KV substation, 11/0.433 KV substation, 60TR HVAC system, Internal Electrifications works, Fire fighting system, 225 KVA DG sets at Radar Buildings inside the operational area and outside the operational area of CSI Airport, Mumbai.

In-charge for electrical works execution & maintenance of equipments installed at technical building, navigational aid units and radar buildings.

Supervised maintained all electrical and mechanical installations at ATS complex, Radar buildings, 15 no. ancillary Navigational Aid buildings in and around operational area of Mumbai airport and Juhu Airport. Supervised and maintained AAI residential complexes at Villeparle (East), S.V. Road Juhu and Santacruz totalling 1000 quarters.

March, 1995 to June, 1997: Airports Authority of India

Asst Engineer (Electrical)

Client : Airports Authority of India

Projects : Hyderabad Airport

As Asst. Engineer/Junior Engineer (Electrical) responsible for:

Execution of Runway lighting system, Simple Approach lighting system and CCR shifting works. The systems in operation shifted without interrupting the daily operations in coordination with Air Traffic Control Officers and other operational staff. In-charge for runway lighting systems works execution & maintenance and power supply to navigational aid units and radar buildings.

Execution of works of 11 KV/415 Volt electrical substations, 40TR HVAC system, Internal Electrifications works, Fire fighting system, 125 KVA DG sets at Radar Buildings inside the operational area of Hyderabad Airport.

Maintained Airport Runway lighting system, 11/0.433 KV substation, HVAC, External & Internal Electrifications works, 380 KVA DG sets and 150 no. residential quarters Provided at Rajeev Gandhi International Airport, Begum pet, Hyderabad.

March, 1989 to June, 1994: Airports Authority of India

Junior Engineer (Electrical)

Client : Airports Authority of India

Projects : Vijayawada Airport

As Junior Engineer (Electrical) responsible for:

Maintenance of Runway lighting systems, 11/0 .433 KV substation, Window and Split AC Units, Internal Electrifications works, 125 KVA DG sets Provided at Civil Aerodrome, Vijayawada, A.P and 80 no. residential quarters. In-charge for runway lighting systems works execution &, maintenance and power supply to navigational aid units.

Feb, 1986 to Feb, 1989: Vijai Electricals/Oblum Electrical Industries Limited,

Hyderabad

Trainee Engineer (Testing)/ Maintenance Supervisor (Electrical)

Client : Electricity Boards and property developers.

Project : Testing and quality control of Power and distribution transformers.

Manufacturing and testing of Lightning arresters and Electrical Maintenance of the factory.