Post Job Free
Sign in

Project Engineer

Location:
San Jose, CA
Posted:
November 07, 2012

Contact this candidate

Resume:

JING DENG

San Jose, CA*****

EXPERIENCE: Extensive civil engineering and project management experience. Expertise includes

design and management of transportation and water resources projects.

April 2008 – Oct 2012 HNTB Corporation San Jose, CA

Senior Engineer

• Mission Blvd/Warren Ave/Freight Railroad Relocation, Alameda County, CA – Project

Engineer/Specifications Manager for the design of a $65 million Highway Widening /Grade

Separation/Railroad Relocation project. Performed extensive coordination with VTA and sub-

consultants. Led the preparation of technical specifications and cost estimate. Performed

quality control reviews of project plans. The project is currently under construction.

• Devore I-15/I-215 Interchange Design-Build Project, Los Angeles, CA – Led

southbound geometric design for this major interchange reconfiguration project in pre-award

phase.

• Kato Road Grade Separation, Santa Clara County, CA – Project Engineer, Package Manager

and Specification Manager for the design of a $22 million project. The project includes utility

relocations, DSM walls, bridges, new drainage facilities and pump station, roadway

geometrics and lane reconfiguration, railroad relocation. Coordinated with VTA and managed

sub-consultants. Led the preparation of technical specifications and cost estimate. Performed

quality control reviews of project plans. The project is currently under construction.

• Caltrain Safety Improvements, Santa Clara County, CA – Project design lead for safety

improvements at 36 grade crossings and Project Manager for the construction support. Work

included preparation of design documents, managing staff, budget, schedule, and coordination

with government agencies. This project has completed construction

• Marin/Sonoma Narrows C2 - US 101 HOV Widening Project, Sonoma County, CA -

Project design lead for Traffic Management Plan, Stage Construction and Area signs of this 3-

mile HOV Lane Widening project.

• CA High Speed Train Project, Caltrain Corridor, San Francisco Bay Area, CA – Project

engineer for the 15% design of 50 miles of high speed train alignment connecting San

Francisco and San Jose. Work included the Hydrology and Hydraulics study for the entire

corridor and quality control reviews of project drainage and roadway plans.

• I-405 Sepulveda Pass Widening Design-Build, Los Angeles, CA – Wall Task Lead for

the South Segment of this $700 million, 10-mile HOV widening design-build project. Led the

design of various types of retaining walls and sound walls, preparation of construction

documents and facts sheets, and coordination with sub consultants. The project is under

construction.

• PCJPB/Caltrain, San Bruno Grade Separation, San Bruno, CA – Roadway design lead

for the 4-Track option of a $112 million project to eliminate the hazards of four at-grade

roadway and railroad crossings. Led the design of three major street improvements, two grade

crossing improvements and a transit center. This project has completed construction.

Jan 2006 - April 2008 Nolte Associates, Inc. San Jose, CA

Associate Engineer

Page 1 of 3

• Calaveras Blvd (SR237) Improvement - Milpitas, CA: Participated in PSR and ASE for

roadway and two bridges.

•Pacheco Transit Center – Contra Costa, CA: Designed a bus transit hub of six bus stations,

including grading and drainage.

• San Martin Park & Ride - San Martin, CA: Responsible for roadway design. Project

consisted of San Martin Avenue widening, Monterey Road deceleration/acceleration lanes and

a new parking lot. The project had completed construction.

• West Capitol Avenue Streetscape - West Sacramento, CA: Responsible for major

roadway design on West Capitol Avenue. Project includes preliminary plans for 9,000 ft of

streetscape improvements and urban design guidelines.

• Artichoke Ave project - Monterey County, CA: Performed roadway design for a 0.5

mile HY156 exit road and a HY1 underpass structure.

• Woodland Gateway Retail Project - Woodland, CA: Off-site roadways design for a

shopping center that will include two major retailers and other shops.

•Schulte Sports Park– City of Tracy, CA: Responsible for Schulte Rd widening, on-site road,

parking lots design and site grading for a 150-acre sports complex.

•Carlo Street Off-ramp Conversion- Milpitas, CA: Design for the SR237 off-ramp. The

project had completed construction.

• Broadway Ave Improvement- City of American Canyon, CA: Roadway, grading and

drainage design for widening & improvement of 2,000 ft of roadway.

Mar 2005 to Dec 2005 Santa Clara Valley Transportation Authority San Jose, CA

Civil Engineering Intern

• Assisted in the BART Extension Project. Participated in station shell design; utilities support

design, demolition plan, interim landscape plan, and structural & utilities drawing review.

Jul 1988 to Jan 2004 Yunnan Water Resources Design Institute Yunnan, China

Chief Civil/Structural Engineer

• In charge of the Design Department including engineering design of hydropower stations,

reservoirs and water supply projects.

• Managed and led design of major water resources, hydropower and water treatment projects.

• Supervised 30 civil engineers in the Design Department.

• Led procurement and bidding process for design projects.

• Designed dams, tunnels, channels, spillways, bridges, culverts, steel pipes, pump stations,

retaining walls, underground structures, hydropower plants, pipelines and roadways.

REGISTRATIONS: Certified in Jan 2007 Professional Engineer/Civil

Certified in Nov 2008 in California, #C71060

Certified in Oct 2011 LEED Accredited Professional

Certified in Oct 2000 Qualified SWPPP Practitioner (QSP),

#21230

Structural Engineer in China, #

S015300349

Proficient in AutoCAD, MicroStation, Inroads, Civil 3D, LDT, MS Office, Adobe.

SKILLS:

EDUCATION: MS in Civil Engineering San Jose State University San Jose, CA

BS in Civil Engineering Tianjin University Tianjin, China



Contact this candidate