Adam R Green Permanent:
**** ***** ***** **. ****** City NC, 28043 828-***-****
Objective: General Resume
Summary: More than ten years combined experience in self supervisory and personnel supervisory positions. Trained in all aspects of shipping and receiving as well as inventory management. Trained in supervisory capacity as PCA position for three years. Have multiple years in maintenance and shop experience. Basic welding and knowledge of hand tools.Disassembling of machine parts as well as reassembling. Machinery installation and removal experience and knowledge and training on all forms of lift trucks.
Education: High School Graduate
2 year College Certification Program
Experience:
August 26th 2009 to Dec 21st 2009 Target Distribution center Newton, NC28658
Trained on order pickers and IRC’s as a warehousing associate. Trained to pull orders from racks and stage for proper loading. Trained to run depal and flow lines with in the plant to help control movement
.
July15th 2009 to Aug 26th 2009 B&W Fiberglass Shelby, NC
Hired as a fixer in the fiberglass manufacturing plant.
Trained to service winders and replace binder hoses on machines.
Trained to replace pull rollers and replace collets.
Trained to perform routine maintenance on machines throughout the plant to ensure proper operation
.
October 5th 2005 to Present Packaging Corporation of America Rutherfordton NC 28116
Trained in shipping supervisory capacity. Responsible for downloading daily shipping reports and making shipping tallys based on shipments destination and delivery times.
Oversee shipment invoices and cutting Bill of Ladings for shipments.
Contacting carriers and scheduling pick-ups to coincide with shipping dates.
Opening and closing up the plant to make sure shipments were out on time.
Maintained monthly inventory of all product in warehouse. Supervised others in the loading and staging of orders. Checked and entered all incoming product into database and kept present knowledge of where orders were in the plant to ensure they were finished on time for shipment. Given keys to plant and allowed to set work times for employees to facilitate shipment success
.
May 2005 to Oct 2005 Mechanical Building Systems Arden, NC
Worked as installer of commercial HVAC units.. Required to read service orders and gather all necessary tools to perform duties.
Trained to inspect assignment for the best possible placement for said unit as well as where to run and hang duct work.
Ran refrigeration lines to outside unit using pipe bender and torch to secure lines.
Basic welding of stainless metal using line feed wire welder.
Kept inventory of all parts and necessary equipment on truck
.
July 1997 to Oct 2003 PPG Industries Shelby, NC
Trained as a fiberglass winder on single and double levels.
Trained as a dry-chop operator.
Trained as a wet-chop packer for the single level.
June 1992 to May 1997 Stonecutter Mills Spindale, NC
Worked in the finishing dept. as a loader and packer.
Worked as a cloth dolpher in the weaving rooms as well as a back up weaver.
Trained to run the finishing and cloth warehouse, and took lead position.
Entered into the maintenance and air conditioning shops for the final two and a half to three years.
Special Skills: Trained to operate all forms for lift trucks and am certified to operate forklift. Fully HVAC and Refrigeration certified. Have fire stop certification and installation and extraction experience. Multiple years of maintenance experience.