Anthony Tony Masters
Jackson MO 63755
Dilling Mechanical Contractors Inc. 574-***-**** October 2010 November 2010
• Steel Mill Shut down in Fort Wayne Indiana
• Steel Mill Shut down in Butler Indiana
• Rerouted piping to kiln
• Installed new boiler
Lee Mechanical 573-***-**** July 2010 August 2010
• Shut Down at Breyer s/Unilever
• Installed new conveyers on ice cream line
• Routed air and water lines to ice cream machines
Casey Construction 800-***-**** January 2010 April 2010
• Mitered pipe for line filter system on a coal-fired power plant
• The pipe size varied from to 24 in both carbon and stainless
• Assisted client in walk down and punch list
PCE October 2009 January 2010
• Piping foreman in charge of rack piping and all pipes going to and from pumps
• Pipe had to have no stress on pumps
• Perfect attendance and no safety violations
Fagan Construction 320-***-**** June 2008 July 2009
• Foreman over pipe on ethanol plant
• Carbon steel pipe up to 40
• Stainless pipe up to 30
• Foreman over distillation area with up to 18 people on my crew with no safety violations
Robinson Construction 573-***-**** January 1987 January 2006
• Worked maintenance at Procter & Gamble TG USA Biokyowa
• Done expansions at all plants
• Ran screw pipe to 2
• Victaulic pipe up to 6
• Welded pipe from to 40 carbon steel and stainless pipe up to 12
• Worked with clients in engineering decisions and routing of pipe pumps and instruments
Other Qualifications
• Bend tubing for instruments
• Operate heavy equipment such as 30 ton crane backhoe track hoe and bobcat loaders
• Have installed overhead sprinkler systems for both wet and dry systems
• Also installed underground piping gas piping and ammonia cooling systems for air units
James Masters
Casey construction- I worked as a master pipefitter mitering pipe for numerous angles along with cutting prepping and fitting pipe on a power plant in Hastings Nebraska
Fagen inc- I ve been working for Fagen on and off for several years as a journeyman pipefitter in numerous locations in Iowa Nebraska and Tennessee on corn feed and ethanol plants.
Pce construction-I worked in El Dorado Arkansas on a chemical plant as journeyman pipefitter on small bore stainless and large bore boiler piping.
Robinson construction- I worked for Robinson construction in Cape Girardeau Perryville and P&G plant at Fruitland all in Southeast Missouri.
Summary- I ve worked as a journeyman pipefitter for fagen and pce which was the highest form of fitter on the jobs and worked as a master fitter for Casey which is also there highest form of fitter they offered. Haven t had a chance to take nccer certification but have passed every fitters test ever given.