|
Resume alert |
Resumes 31 - 35 of 35 |
Puducherry, PY, India
... * Participated in the Industrial visit to Centre for Wind Energy Technology (CWET), Chennai. * Participated in the Industrial visit to Industrial Space Research Organisation(ISRO), Trivandrum. * Undergone In-plant training in Oil & Natural Gas ...
- 2014 Aug 12
Puducherry, PY, India
... * Participated in a National Conference 'WIND MILL POWER PRODUCTION USING MULTI GENERATOR'' Conducted by Venkateswara College of Engineering, Chennai. * Had won First Prize in National Conference on topic "WIND POWER GENERATION USING MULTI GENERATOR ...
- 2014 Jul 05
Puducherry, PY, India
... > Company manufacturing capacity for telecom towers is about 50,000 MT per year (Angular and Tubular) that are designed using the latest technology software programs considering a variety of parameters such as wind load conditions, antenna loading, ...
- 2013 Jul 22
Cuddalore, TN, India
... Manager Job Responsibilities: Testing of Electrical Panels related to Wind Mill Equipments Assembling and Testing of Nacelle and Hub Period : From October 2006. Place : Thiruvandarkoil, Mannadipet commune, Pondicherry- 605102. Previous Employer - 1 ...
- 2013 Mar 02
Villupuram, TN, 606202, India
... Percentage Secured : 69% Extra Qualification: First Aid Technical Fire Electrical Safety Construction Safety Project Work: A study on fault analysis in wind turbines at suzlon infrastructure pvt. Ltd. Rectification concept for the power failure in ...
- 2012 May 29