Distance: |
Resume alert |
Resumes 231 - 240 of 16565 |
Cairo, Cairo Governorate, Egypt
... 5)Gas Turbine “Enpi” in 2011. 6)PMP Preparation course in “OGS” in 2011. WORKING SUMMARY From January, 2003 up to now Company : SUEZ OIL COMPANY (SUCO) Location : Zeit Bay Field Position : Mechanical Planning Engineer from 2003 to Now. relevant ...
- Apr 27
Dubai, United Arab Emirates
... M/s Neyveli Lignite Corporation - Tamil Nadu power ltd (TN) July 2016 - Present About the Organization: 2*500MWIndependent thermal power plant (Operation & Maintenance JOB RESPONSIBILITY: Operation and Maintenance of Turbine and Turbine auxiliaries. ...
- Apr 27
Detroit, MI
... Developed turbine engine components to support new product introduction. Participated in formal and informal design reviews for the development and approval of engineering changes. Coordinated part procurement and prototype construction. Supported ...
- Apr 26
Calgary, AB, Canada
... Execution excellence: Executed key Turbine and compressor Major overhauls – Siemens, Solar 8k, 12k, 24k 30k, 40k etc. Dresser Rand, Ariel compressors, Sulzer pumps; Waukesha Engines booster compressors, gearboxes etc. Championed the gas quality ...
- Apr 26
Varanasi, Uttar Pradesh, India
... Synchronisation panel and BHEL 20 MW Turbine panel AVR panel Generation supply to Grid supply synchronisation. As per schedule General maintenance of LT HT motors. Regular Audit on Tools, safety and Maintenance the the Log and checklist. preparing ...
- Apr 26
Edmond, OK
... In 1975, Triveni started producing high-speed gears and Gearboxes for turbine applications as well as for other Industrial applications. Responsibilities: Created SMART FORM for Time Ticket (Job card printing) For PP module Barcode printing for ...
- Apr 25
Houston, TX, 77299
... Senior Designer Amoco- Mobil Yanbu Project - Shell Oil Project - Gulf Oil Projects - Aramco Saudi Arab - Texaco Gas Turbine Project Designed calculations for lighting, voltage drop, wire, motors and feeder cable sizing. Prepared schematics, ...
- Apr 23
San Antonio, TX
... oLead a group of 4 engineers to design a combustion chamber (CC), High Pressure Turbine (HPT), and Low-Pressure Turbine (LPT) to agree with the developed cycle analysis responding to the RFP. Included calculating hub, mid, and tip blade shape with ...
- Apr 23
Mueang Chiang Rai, Chiang Rai, Thailand
... Equipment inspected are as follows: gas turbines, gas compressor, steam turbine, pumps, air compressor, equipment packages, drums, vertical vessel, horizontal vessel, tanks, exchangers, steam boilers, furnaces, blowers, HRSG, filters, loop reactor, ...
- Apr 22
Lahore, Punjab, Pakistan
... including Wartsila 16V34SG (7.8 MW x2),Sang Yong 18v32H (3.7 MW x2), MAN B & W 18v32S (4.1 MW x2), JGS 620E (3 MW x2), JGS 416 (1.1 MW x2), JGS 420 (1.5 MW), JMS 620 J (3.3 MW x2), CAT 3616 (3.6 MW), Steam Turbine HRST (2.6 MW), Solar (8.2 MW). ...
- Apr 22