|
Resume alert |
Resumes 31 - 40 of 276 |
Mumbai, Maharashtra, India
... Communicate with clients and commissioning of Static & Rotating mechanical Equipments, like Compressor, Heat Exchanger, Turbine, Vessels at the construction site. Collaborate with team members to comply with project requirements and meet the project ...
- 2022 Mar 01
Mumbai, Maharashtra, India
... (2016-2019) DGCA Credentials: Mod 3 (Electrical Fundamental) Mod 4 (Electronics Fundamental) Mod 5 (Digital Techniques) Mod 6 (Material and Hardware) Mod 8 (basic Aerodynamics) Mod 9 (Human Factors) Mod 10 (Aviation Legislation) Mod 11A (Turbine ASS ...
- 2022 Feb 07
Panvel, Maharashtra, India
... Rationalization of UPS for 160-160 KVA Gas turbine 5 MW tow set Also working on BMS System(L& T) controller, chiller 10ton capacity, cooling tower,AHU& all equipement. Also working on Hydraulic system, Pneumatic system, TFH system Also working on ...
- 2022 Jan 31
Mumbai, Maharashtra, India
... Project Work: Kitchen fire suppression system Gas fire suppression system Tube fire suppression system Proteview vesdas system Sterling Engine & Honing Machine Double Acting Pneumatic Engine Hybrid Bike & Turbo Charger Density & gravity Turbine ...
- 2022 Jan 15
Mumbai, Maharashtra, India
... operation of HP heaters,LP heaters,turbine lube oil system, turbine control fluid system, cwsystem, condensor backwash system, compressed air system, auxillary water cooling system, PHE and vaccum system. BOARDING OFFICER FOR SHIP UNLOADING To ...
- 2021 Dec 27
Mumbai, Maharashtra, India
... Data from Server database in presentable format Planned and Prepared Maintenances schedule for MI, HGPI and CI for the gas turbine calculating their actual and expected fired hours and fired starts base on OEM recommendations Monitored Oracle8i ...
- 2021 Nov 23
Navi Mumbai, Maharashtra, India
... Turbine controls, Compressor controls etc.Review& approvals of OEM procedures, participation in risk assessment, HAZOP & SIL assessment & provide input to START –UP procedures. work closely with operation team for Mechanical completion of newly ...
- 2021 Nov 16
Mumbai, Maharashtra, India
... Creating Piping general arrangement drawings with annotation and tagging facilities Larsen and Toubro The project consist of creating of detail drawings for fabrication of a turbine and taking cost cutting measure by utilizing maximum steel plates ...
- 2021 Nov 03
Mumbai, Maharashtra, India
... • Played Sports at Intercollegiate and Interdepartmental Level Attended Blood Donation Camp PROJECT : Mini Project done in 3rd year: • Title : B2 Stealth Bomber Aircraft Major Project done in Final year : Title : Analysis of Turbine Blade STRENGTH: ...
- 2021 Oct 28
Mumbai, Maharashtra, India
... WORKING PRINCIPLE:- When gust of wind and solar panel created by electric vehicles on either side of road or the natural one hits on the blade of propeller with adequate force, it rotates the shaft of turbine and solar panel which results in ...
- 2021 Oct 06