Post Job Free

Turbine resumes in Al Khobar, Eastern, Saudi Arabia

Sign in
Search for: Jobs   Resumes


distance:
Resume alert Resumes 51 - 60 of 62

11 Years of Experience related with Onshore & wellhead instrumentat

Dammam, Eastern Province, Saudi Arabia
... Experience in the commissioning of equipment’s such as Boilers, Furnace, Compressor, Dryer, Turbine, Motors, and Pumps Etc. Work in a team leader under the guidance of Instrument Supervisor. JOB DESCRIPTION Planning, troubleshooting, day-to-day, ... - 2019 Jun 05

Power Plant Technician

Khobar, Eastern Province, Saudi Arabia
... Installation and Commissioning of Turbine Vibration probes, Speed sensors & Temperature Controller. Erection activities like Panel Erecting, cable routing, Tray works, Instrument mounting, Termination. Commissioning activities like field instruments ... - 2019 Apr 30

Electrical technician/electrical forman/h.v. and m.v. cable splice and

Khobar, Eastern Province, Saudi Arabia
... ·MCC control circuit wiring modification for gas turbine, lube oil and cooling water system. ·MV/LV. Motor winding & power cable insulation resistance test and termination. ·Generator protection panel wiring/loop checking and wiring modification. ... - 2019 Mar 23

Engineer Electrical

Khobar, Eastern Province, Saudi Arabia
... 01/2012 – 01/2013 Foundation In Science SEGI University, Kuala Lumpur, Malaysia Designs and Achievements I’ve designed a “Wind Energy Charging system” as my final year project by using a small turbine to produce enough electrical energy to charge a ... - 2018 Nov 22

Power Plant Engineer

Dammam, Eastern Province, Saudi Arabia
... V84.2 Gas Turbine SIEMENS Familiarization Training Certificate in SEC. V84.2 Gas Turbine SIEMENS Operation Training Certificate in SEC. Auto cad & office management EMPLOYMENT HISTORY: 1. Company : Saudi Electric City Company Ltd Position Title : ... - 2018 Feb 16

Power Plant Technician

Manama, Capital Governorate, Bahrain
... Making alignment Rim and face method in ASS.GB to Turbine. Involved in repair and Turbine Test. Combustion Chamber Inspection(C.I) open The pigtail, Can Nozzle, Burner and liner. Liner and Transition piece Test (L.T.P) open the gas fuel inlet pipe, ... - 2017 Mar 11

Power Plant Engineer

Dammam, Eastern Province, Saudi Arabia
... - Emergency gas turbine unit 9 Mw. - Emergency diesel unit 0.5 Mw. * Experience interval from 01/2003 till NOW. * Port-Said Power Plant EEOC (2 * 341 MW) the company has integrated policy (Quality, Environment & Safety) of respecting the ... - 2017 Feb 15

Engineer Maintenance

Dammam, Eastern Province, Saudi Arabia
... Three (3) years as Project Management Consultancy (PMC) in construction, pre-commissioning & commissioning of Steam Turbine Power Generation plant (STG) using YOKOGAWA DCS CONTROL SYSTEM connected to Boiler Feed Pumping stations, Boilers, Electro ... - 2016 Jan 12

foe mehanical

Al Khobar, Eastern Province, Saudi Arabia
... point Depression unit,water injection unit, gas injection unit,unmanned platforms &offshore water maker, fire water pumps, seawater lift pumps, gas turbine drive compressor & booster pumps and also worked ONSHORE CNG Compressor unit for British Gas. ... - 2016 Jan 10

Engineering Mechanical

Manama, Bahrain
... Designing a suitcase kit for high temperature (600 to 1200 oC) strain and stress measurement technique using ceramic type and weld -able strain gauges to be used for high temperature and low pressure turbine blades, Pipelines, Turbine casing, boiler ... - 2015 Jun 02
Previous 1 2 3 4 5 6 7 Next