Post Job Free

Turbine resumes in Cuddalore, Tamil Nadu, India

Sign in
Search for: Jobs   Resumes


distance:
Resume alert Resumes 21 - 30 of 40

Power Plant Operator

Cuddalore, Tamil Nadu, India
... BOILER MAKE : THERMAX LIMITED HMT/12TPH/ 10.54Kg/cm 2/ 368 sq.mtr / 185oC KNOWLEDGE & WORK EXPERIENCE IN POWER PLANT •Governing system of turbine, HPLP Bypass system, generator seal oil system, stator water system, lube oil system, condensate system ... - 2019 Feb 28

Manager Engineer

Puducherry, India
... Plant capacity: 63 mw,CFBC boiler, Turbine & boiler import from china (HBG and HTC), 300 kw Roof mounted solar PV. Previously worked as a MANAGER – O & M in M/s. ENMAS O&M SERVICES PRIVATE LIMITED in Chennai (INDIA) Site: M/s Tulsyan nec power plant ... - 2018 Jun 12

Electrical Engineer Power Plant

TN, 607003, India
... Position : Electrical Engineer Period : March 2017 to September 2017 Project 1 : 11kv/66kv HFO Turbine Power Plant Client : Jovenna, Madagascar Project 2 : 11*66MW HFO DG Power Plant Client : AKSA Power, Madagascar Duties Responsibilities HT &LT ... - 2017 Dec 16

Mechanical Quality Control

605009, India
... Performance test of valve and pump test and calibration procedure of flow meter like coriolis, turbine flow meters etc. 2. Knowledge in standard code like ISO-13623, 15590-2, 14313-VALVES, WELDING-13847, 15649, API. 3. Different type of Electrode ... - 2017 Jan 28

Electrical Commissioning and Maintenance Technician

Cuddalore, TN, 607001, India
... s in oil and gas The project involved, Commissioning Startup & Testing of transformer, Power Panels, Circuit Breaker, Lightning Arrestor, Gas turbine (SIEMENS 400), CP system, Fire water, motors, Soft starter,VFD, Scheme Checking, Planning, etc. ... - 2017 Jan 09

Engineering Mechanical

Villupuram, TN, 605602, India
... INDUSTRIAL VISIT: NEYVELI LIGNITE CORPORATION (NLC) AT NEYVELI ASHOK LEYLAND AT ENNORE, CHENNAI INTEGRAL COACH FACTORY (ICF) AT PERAMBUR, CHENNAI CURRICULLUM PROJECT: AUTO FEEDER ( DIPLOMA PROJECT ) VERTICAL AXIS WIND TURBINE ( BE MINI & FINAL ... - 2016 Jul 23

power plant operation

TN, 607803, India
... in local, instrument compressor local checking, steam turbine side all parameters checking locally as per check list, work along with maintenance, electrical people combined in shut down and emergency time, handle per shift 40 labor’s in all area. ... - 2016 Jan 21

Engineering Higher Secondary

Puducherry, PY, India
... Title : “Vertical Axis Wind Turbine” Team size : 4 My role : Design the blades for wind mill using galvanized iron sheets Description : The main aim of our project is to harness wind energy without placing the windmill along the direction of the ... - 2015 Jul 04

Post Graduate Diploma In Thermal Power Plant Engineering. Durgapur.

Puducherry, PY, India
... Project title: OPTIMIZATION OF TURBINE HEAT RATE IN THERMAL POWER PLANT Description: Identified and devised the strategy to improve the availability factor of the existing thermal power generating units is about 10%, by optimizing heat rate of power ... - 2014 Aug 20

Project Sap

Puducherry, PY, India
... Team lead Platform Pollution control and Renewable energy Kit Real time kit (Turbine, Boiler, valves and c.p, etc) Duration 1 year Achievements Won the First prize and cash award (Rs.3000) in a National Level Paper Presentation and Symposium. ... - 2014 Apr 08
Previous 1 2 3 4 Next