Resume alert |
Resumes 71 - 79 of 79 |
Kolkata, WB, India
... BOILER- 2x125 TPH at 90kg/cm2, 530 5 C Natural circulation, Single drum, top supported, water tube, Balanced draft. TURBINE-Impulse reaction Condensing NTC CHINA make (1X65MW) steam Turbine. JOB PROFILE & RESPONSIBILITY: . Presently working in NAVA ...
- 2013 Nov 23
Kolkata, WB, India
... Key Responsibilities : Installation, preparing, erection of chamber, Manual fan, Auto fan, alignment of fan & motor, Tube bundle lowver cover. Damper, Fin Fan, Blower alignment, 72 m Flare Tower alignment, preservation inspection check list. GE ...
- 2013 Oct 05
Kolkata, WB, India
... < Mechanical design of shell and tube type Heat exchangers as per TEMA specification .OverHauling for the same ehich including hydro-jetting of exchangers, tubes, leakage identification of the tube, and replacement of damage part, Satic Equipments ...
- 2013 Aug 12
Kolkata, WB, India
... Testing of starters, chokes of fluorescent tube lights & capacitor. Load allowed in number of lights points or watts in one lighting circuits, size of wire & gauge. . Building wiring, switch board connection parallel board, bus bar connection. . ...
- 2013 Jul 17
Kolkata, WB, India
... < Exposure to boiler tube leakage problems ash disposal problems, etc. < Monitoring water treatment and water management activities. < Annual maintenance and forced shutdown of boiler. < Boiler Commissioning: Drives off load/on load testing, duct ...
- 2013 Jul 15
Kolkata, WB, 700014, India
... loop checking and function test from Field to CCR & CCR to Final Element (hot & cold loop) Responsible for the day to day scheduling of works and planned works Worked on Pressure Sensor like Diaphragm, Capsule, Pressure spring, Bourdon tube, Bellow. ...
- 2013 Mar 28
Calcutta, WB, India
... • Plant inspection during shut down at Sohar refinery Company which includes overall visual inspection of vessels, heat exchangers, helium leak test of heat exchanger tube bundle which was suspecting leakage at tube to tube sheet weld zone, ...
- 2012 Nov 07
Kolkata, WB, India
... Chembulk Gibraltar had an extensive Boiler repair of 100% tube renewal during my tenure. Have witnessed complete procedure of water tube renewal sequence without disturbing alignment of respective water steam drums in place. C) Main Fleet vessel, ...
- 2012 Mar 31
KOLKATA, WB, 712104, India
... , Thermostat, Immersion Heater, C- Type Bourdon Tube, Load Cell, Pressure Switch, Rota meter, Venture meter, Orifice plate, Dead Weight Piston gate, Star to Delta Starter, Damper, Smart Transmitter, Drawing: P&I Drawing, GA Drawing, I/O List etc. ...
- 2011 Aug 14