|
Resume alert |
Resumes 21 - 29 of 29 |
Durgapur, WB, India
... down Maintenance/ Planning of shift schedule/ Men power distribution/ Daily presented performance to the Management Work Experience:- working as an assistant engineer in operation in vacuume system ash handeling plant of 300MW Thermal Power plant. ...
- 2017 Jun 11
Durgapur, WB, India
... Professional experience: As a site supervisor having 1 years of professional experience in the project & execution dept in Murugappa Morgan Thermal Ceramics Ltd. Academic Qualifications: Degree / Qualificatio Institute Board / Year Aggregate % ...
- 2017 Jan 15
Durgapur, WB, India
... 2010 58% EXPERIENCE:- BDG METAL & POWER, Barjora,Durgapur West bengal VOCATIONAL TRAINING Barauni thermal power plant-Barauni( BIHAR) Haldia dock complex-HALDIA.(WEST BENGAL) PROJECT Computational fluid dynamics (CFD) analysis of Natural convection. ...
- 2016 Oct 31
Durgapur, WB, India
... Heat Treatment 2weeks NTPC BARH Overview of Super Thermal Power Plant 4weeks Final Year Project Solar Escalator 1 year Additional Qualification / Achievements / Certifications: Make a Robowar Bot which is selected in IIT BOMBAY from Eastern Zone. ...
- 2016 May 13
Durgapur, WB, India
... floor, 301, Post-bally, Howrah, pin-711201 Call: +91-879******* / +91-903*******/ act39d@r.postjobfree.com Career Conspectus Over 17 years of experience in Transport operations and logistics for steel, Coal & Ash in Thermal Power & Steel industry. ...
- 2016 Mar 27
Durgapur, WB, India
... Abhijeet Group- 1/11/2010 to 15/12/2013 as Safety Head of Thermal and Biomass Power Plant, 3. Graphite India Ltd. - As Safety Head of Durgapur Unit. 4. Eastern Gases Ltd- At Present Working As - Head Technical Services and EHS of the all the ...
- 2016 Feb 07
Asansol, WB, India
... of Biometrics INTERNSHIP: ORGANIZATION: Damodar valley corporation (DVC) June 18 – July 4, 2014 LOCATION: DURGAPUR STEEL AND THERMAL POWER STATION(DSTPS), Durgapur DESCRIPTION: This internship was basically carried out to reduce the energy losses in ...
- 2016 Jan 16
WB, 713359, India
... B.B.S.E 2007 79.12% 2nd R.K.S.(H.S) paper(beng INSTITUTION English, Mathematics, Physical science, Life science, Geography, Histrory, Additional Trainings [pic] Undergone eighteen days in plant training at DVC 2340 MW Thermal Power Station, Bankura. ...
- 2014 Sep 21
Asansol, WB, India
... B.U 71.8 2013 Educational Qualifications: Examinations Appeared Name Of Board Percentage Obtained Year Of Passing AISSE CBSE 77.5 2006 Higher Secondary WBCHSE 71.4 2008 Training : Vocational training at Durgapur Steel Thermal Power station, DVC, ...
- 2013 Aug 29