|
Resume alert |
Resumes 31 - 40 of 66 |
TN, India
... PRIVATE LIMITED Now : TAMILNADU WATER INVESTMENT COMPANY LIMITED EXPERIENCE: 4 yeras JOB RESPONSIBILITIE OPRATING FOR MACHINE: Breakers, Drives, PLC, Flow Meter, 1010kvaDG and 2.5MVA Transformer(substation),VFD250KW(ABB) and YASKAWA(75KW),MMI. ...
- 2017 Sep 26
TN, India
... 22 kV Auxiliary relay Checks 2.Project : 400/132/33kV Ajman Grid Substation Client : ABUDHABI TRANSMISSION & DESPATCHED COMPANY (TRANSCO) Job Responsibility: 1.400 & 132KV DC Scheme Checks 2.400 & 132KV Primary injection Test 3.400 & 132KV V.T ...
- 2017 Sep 24
TN, India
... Strengths Handled various projects across Power Plant, Substation & Oil & Gas industries Worked across various region in Qatar, Abudhabi, KSA & India Have handled maintenance and shutdown projects Academic Qualification: SL. NO CATEGORY INSITUTIION ...
- 2017 Aug 29
TN, India
... • Undergone “Industrial visit at “TANTRANSCO GRID ERECTION SUBSTATION”,DHARAPURAM. • Undergone “Industrial visit at “CORAL REWINDING”,ERODE. PERSONAL SKILLS: • 100% commitment in work. • Easy to adopt any environment. • Self motivating. PERSONAL ...
- 2017 May 03
Tiruchirappalli, TN, India
... Period : 27.12.2013 to 26.12.2014 Department : M&S/Substation Designation : Graduate Apprentice DOMAIN OF INTEREST: Circuit theory, Digital Logic circuits COMPUTER PROFICIENCY: Basic c,c++, Java 2D AUTO CAD ACADAMIC PROJECT “SMOKE FIRE DETECTOR WITH ...
- 2017 Apr 25
TN, India
... works (including 5m wide X 3m depth) Activities Involved in C1685 Project Intake Substation Building, Stabling yard, Main workshop, Admin Building, Pway Precast construction, Train wash plant, Train tracks, Bridges, Road works, Drainage works etc. ...
- 2016 Dec 17
TN, 621306, India
... ● Trained about practical operations of boilers, substation maintenance, generation of Power Undergone Industrial visit at Southern Railway, Trichy. ● Gained more things about electric locomotive operations, electric traction power supplies SKILL ...
- 2016 Oct 03
TN, India
... in 110KV/11KV substation Previous Employer 3: Company: THEJO ENGINEERING LTD Client: ADANI POWER LTD (4*330MW, 5*660MW) GUJARAT Works: operation& Maintenance Designation: ELECTRICAL ENGINEER Working period: March 2012-Oct 2013 Working Responsbility; ...
- 2016 Sep 21
Tiruchirappalli, TN, India
... IMPLANT TRAINING: Attended a 5 day implant training in Kallakurichi 110/22kv substation of Tamilnadu Generation and Distribution Corporation Ltd. Attended a 5 day implant training in Thiruvannamalai 110/33-11kv substation of Tamilnadu Generation and ...
- 2016 Aug 03
TN, India
... Experience and Area of expertise: Project field 33KV/400V, 60 HZ electric equipment substation with different load centre (SCADA control) 13.8KV/400V, 60 HZ electric equipment substation with different load centre (SCADA control) Power generators ...
- 2016 Aug 03