Post Job Free

Substation resumes in Kanpur, Uttar Pradesh, India

Sign in
Search for: Jobs   Resumes


distance:
Resume alert Resumes 1 - 5 of 5

Fresh Graduate Power Corporation

Kanpur, Uttar Pradesh, India
... Inter College 2012 76 EXPERIENTIAL LEARNING (SUMMER INTERNSHIP PROGRAM) CompanyName :- Uttar Pradesh Power Corporation Limited ( Naubasta Substation Kanpur) Duration :- One Months EXPERIENCE Working At Gas Authority of India Ltd. (GAIL) as ... - 2021 Dec 29

Engineer Project

Kanpur, Uttar Pradesh, India
... Erection of distribution network, distribution poles (8/9-meter PCC/PSC pole, Steel Tabular pole), Distribution Transformer, Stringing, 33/11KV Substation such as Erection of PTR, CTS/PTS, VCB/OCB, Isolators, LA, RTCC Panel & Cable Laying. Survey ... - 2020 Jun 24

Field work, Maintenance, Supervision, Team Handling

Kanpur, Uttar Pradesh, India
... 08.05.2018 – 07.06.2018 Report: During one month of vocational training at 400/200 KV Substation, I was trained about the operational and maintenance philosophy of the 400/200 KV Substation along with control,future planning & layout of 400KV ... - 2020 Jan 06

Project Engineering

Kanpur, UP, India
... : to generate electricity Duration : 45 days Role : Controller Team Size : 15 Objective PROJECT : 3 Title : Training at substation sector 18 Chandigarh Description : 33kv voltage converts into 11kv and transfers Duration : 45 days Role : stepup and ... - 2017 Dec 26

Engineer Power Plant

Kanpur, UP, India
... METATHESIS P370-MMA Design Preparation of Load List, Transformer Sizing, SLD, Schematics, Substation Equipment Layout, Motor Control Schedule, Cable Sizing, Cable Schedule, Cable Tray sizing, Cable Tray layout, Lighting, Earthing & Power Layout. ... - 2014 Jun 06