BIRENDER KUMAR PAL
Profession : Electrical Engineer
Date of Birth : 16 Oct 1974
Education : B.Tech. in Electrical Engineering (Aug 2002)
from YMCA Institute of Engineering Faridabad
Post Diploma in Electrical Engineering (May
1995) from YMCA Institute of Engineering
Faridabad
Contact Address : H. No. 525,Sector-23, N.I.T. Faridabad
Haryana-121005 Ph-012*-*******,
981-***-****(M), acegkz@r.postjobfree.com
Marital Status : Married
Passport No. : L 8800821
Career Profile : Lead a team of engineers & designers in
carrying out electrical detailed engineering
works & provide necessary technical
information for procurement in compliance
with tender specifications / data sheets and
within budgeted man-hour & project
schedules.
Nineteen Years' of total experience in
Designing, Project Engineering &
Commissioning for electrical system of
refinery, petrochemicals & power projects.
June 2012- May 2014 : GS Engineering and Construction India Pvt.
Ltd.
A fully owned subsidiary of GS E&C
Corporation (formerly LG
E&C), South Korea
Project Under Execution:-
RABIGH II REFINING & PETROCHEMICAL PROJECT
(CP3 & CP4)
Project work comprises of Detailed Design &
Engineering of three CP4 Units as below :-
P210-MTBE & ISOBUTYLENE
P220-METATHESIS
P370-MMA
Design Preparation of Load List, Transformer
Sizing, SLD, Schematics, Substation
Equipment Layout, Motor Control Schedule,
Cable Sizing, Cable Schedule, Cable Tray
sizing, Cable Tray layout, Lighting,
Earthing & Power Layout. Project work also
comprise of 3D Model review with Navisworks
Freedom 2013.
Technical evaluation of Vendor Offer for
Electrical Equipment based on
Technical Specification, Data Sheet & Site
requirement as per Bid Document.
Organize the issuance/review of engineering
drawings and technical documents for
Inter-Discipline Checks (IDC ' s)
Getting client's feedback for Engineering
work
Detail work experience:-
Working as Principal Engineer Electrical
Review the ITB (Invitation To Bid)
documents, issue inquiry requisitions,
review vendor technical offers, BOQ of
equipment & bulk material and man-hour
estimation.
Review contract requirements for project
execution, identify requirements and scope
of work; review specifications and Data
Sheets, Piping & Instrumentation Diagrams
(P&ID ' s), Plot plans, General Arrangement
(GA) drawings, Review Philosophies, Area
Classification Drawings.
Verify scope of work, budgeted man hours,
total quantity of deliverables, format of
delivery, time schedules and other
specifications for execution of the work.
Apportion work among engineering staff
according to area of experience, supervise
the preparation of equipment and cable
layouts, lighting layouts, earthing and
lightning protection layouts, cable
schedules, bill of quantities etc.
Organize the preparation of equipment and
material specifications and data sheets,
administer the development of detailed
engineering calculations and drawings
including the preparation of Single Line
Diagrams, Schematic Diagrams, Logic
Diagrams, Cable Schedules and Cable Drum
Schedules, Interconnection Schedules,
Hazardous Area Classification, Equipment
Lay-outs, Cable Routing and Layout Drawings,
Cable Trench/Tray Layout Drawings, Lighting
System Layout and Details, Earthing System
Layout and Details, Installation Standard
Drawings and other required documents.
Perform Technical Bid Evaluations (TBE),
review vendor drawings and documents. Ensure
vendor equipment specifications meet with
client equipment specifications and are
within budgeted costs.
Organize the issuance of engineering
drawings and technical documents for
Inter-Discipline Checks (IDC ' s) Direct and
monitor Material Take Off (MTO) activities,
identify irregularities and shortfalls, take
corrective action for the progress of
project in accordance to schedule & allotted
man hours.
Technical skills:-
- Load flow study, Short Circuit study,
Fault calculation, motor starting, voltage
drop calculation utilizing ETAP.
- Cable sizing and schedule, cable tray
sizing, cable tray loading, Earthing Design,
Transformer sizing, Generator sizing, UPS &
Battery sizing and short circuit calculation
in excel sheet.
- SLDs, Substation Layout, cable tray
layout, lighting layout, earthing layout and
power layout in autocad-2007.
Knowledge of IEEE,IEC,NEC,API, IS
,OISD,NFPA etc.
Project involve: SOCAR Turkey Aegean
Refinery
January 2008- May 2012 : IOT Design & Engineering Limited
A subsidiary of Indian Oil Tanking. Indian
Oil Tanking is a 50:50 joint venture of Oil
Tanking GmbH, Germany and Indian Oil Tanking
Limited. It is a leading Pvt. Sector company
in the Terminalling & EPC Contracting
Business.
Worked as Sr. Manager Electrical
Responsibilities include Bid Preparation and
Design & Engineering for Complete Captive
Power Plant & other Utility areas in Oil &
Gas Sector.
Major Projects Executed:-
Petronet LNG Ltd. (Dahej LNG Terminal,
Gujarat, India)
Project work comprises of TOP side
facilities for Standby Jetty at Dahej LNG
Terminal which is as follows:-
ETAP calculation for Load Flow studies &
Short circuit Analysis
Jetty Substation equipment layout, SLD &
cable schedule
Jetty Area Lighting Layout, Panel Schedule
& Lighting Design Calculation
Installation Details of Street Light and
Flood Light Fixtures.
Paradip BOOT Project (15 MT) - (Paradip
Refinery, Orrisa, India)
Project Work comprises of Design & Detailed
Engineering of Crude Oil & Product Tank Farm
(33tanks) LPG and Propylene bullets, LPG,
Propylene, Sulphur Truck loading, metering,
pumping, piping and infrastructure
facility. Detail description is as below:-
Short Circuit Study, Power Flow Analysis
using ETAP.
Preparation of Equipment and material
Specifications and Data sheets & Development
of Detailed Engineering Calculations.
Preparation of SLDs, Cable Schedules and
Cable Drum Schedules, Interconnection Wiring
Diagrams.
Perform Technical Bid Evaluation &Vendor
Print Review
Preparation of Equipment Layouts, Cable
Trench/Tray Layout, Substation Layout,
Earthing & lighting layout in AutoCAD.
Bidding Projects:-
Assam Renewal Project - ONGC
Sonamura Tripura-ONGC
IPPL-Ennore
ITF, Tengakhat Assam - ONGC
OIL-Duliajan
NOCL Ltd.(NOCL, Cuddalore, Tamil Nadu)
Geo Enpro Petrolium -Kharsang Arunachal
Pradesh
Bidding Project Work includes the following
Design & Engineering activities for
submission of Enquiry to vendors for
receiving Technical Priced Offers :-
Preparation of Material Requisition complete
with Technical Specification, Data Sheets,
Standard Details and other Engineering
Drawing like SLD & Equipment Layout for
Procurement of Electrical Equipments &
accessories.
Engineering Design Calculation Work which
comprises of Transformer Sizing, DG Sizing,
Cable Sizing, Cable Schedule, Lighting
Calculation, Lighting Schedule, Capacitor
Sizing Calculation, UPS sizing, Battery &
Battery Charger Sizing, Tray & Trench
Sizing, Cathodic Protection as well as Heat
Tracing System BOQ based on NIT Documents.
Construction Project:-
Rudrasagar GGS-1
Design Consultation for Transformer & DG
Incomer Synchronization, Relay
Co-ordination, Lighting Calculation for
existing Lighting Layout by addition of new
exterior luminaries along with existing
luminaries.
January 2007- January 2008 : TCE Consulting Engineers Ltd
Worked as Project Engineer Electrical
Responsibilities include:
Design & Preparation of Electrical Drawings-
SLD, GA, Schematic Diagram, Interconnection
Diagram, Cable Layout & Earthing Layout.
Calculation of Electrical Items viz.
Transformer Fault Level, Transformer sizing,
Cable Sizing & Power Factor Calculations.
Vendor drawing review of all above
drawing/documents listed in Sr. no. 1.
Major Projects Executed:-
Combined Cycle Power Project:-
Combined Cycle Power Plant at Essar, Hazira
- 140MW
Delhi Water Supply & Sewerage Project:-
Waste water Treatment Plant, Wazirabad,
Delhi
Aug 2004 -October 2006 : Desein International Pvt. Limited
(DDRC-CH2MHill)
Worked as Senior Engineer Electrical
Responsibilities include:
Design & Preparation of Electrical Drawings-
SLD, GA, Schematic Diagram, Interconnection
Diagram, Electrical Equipment Layout, Cable
Layout, Lighting Layout & Earthing Layout.
Calculation of Electrical Items viz.
Transformer Fault Level, Transformer sizing,
Cable Sizing, Power Factor Calculations,
Lighting Calculations, Cable Schedules -
Power and Control, Bill of Material for the
complete Electrical system.
Major Projects Executed:-
Thermal Power Project:-
DCR, TPP, Yamuna Nagar - 2x300MW
WWTP Projects:-
Belmont, Australia - 10.5 MGD
Piru, California - 1.75 MGD
Reverse Osmosis Plant Extension Projects:-
Layyah Power Station, Sharjah Emirates-5 MGD
Khor Fakhan Power Station, Sharjah
Emirates-5 MGD
June 2003 - July 2004 : ANAND CONTROL SYSTEMS Pvt. Ltd. - NOIDA,
India Worked as Senior Engineer Electrical
Job Responsibilities :- Design / Tendering /
Estimation Costing-Electrical Projects
Design & Manufacturing of Power Factor
Correction Panel, MCC & PCC Panel, AMF
Panel, Service Bypass Panel for UPS &
Battery Rack for batteries used for UPS.
October 2002 - June 2003 : SHARP RAYS - Faridabad, Haryana, India
Worked as Executive Engineer- Design
My Responsibilities were Design of X-Ray
Machine Panel and co-ordination with the
Production People for manufacturing of
Electrical items as well as Mechanical Items
Like bed for the patient and Trolleys etc.
June 1995 - June 1998 & : Bhartia Cutler Hammer Limited- Faridabad,
June 2001 to August 2002 Haryana, India
Worked as Executive Engineer- Design
Job Responsibilities :-
Designing of panels taking care of
Customer's requirement and Company's
standard design to maintain excellent
quality standard for Customer Satisfaction
Technical Discussion with Customer/
Consultant for finalizing the drawings.
Coordinating with Planning & Purchase for
material Procurement.
Co-ordinate QA & Production for final
inspection of panels with Customer/
Consultant.
July 1998 - May 2001 : Mecon Limited (An ISO 9001 Company), Delhi,
India
Worked as a SITE Engineer-Electrical
(on deputation through Bhartia Cutler Hammer
Limited)
Project Responsibilities :-
Planning & Co-ordination with Organizations
handling the Project.
Manpower Mobilization.
Material Procurement.
Inspection with the Client.
Billing
Apart from Design, Estimation & Costing
responsibilities I also gained expertise in
the field of Turnkey Projects which also
includes the following: -
Erection, Testing & Commissioning of MCC,
PCC & Starter Panel (DOL, Star - Delta &
Auto-Transformer).
Electrics of HVAC System - Chiller Unit,
Cooling Tower, AHU & Pressurization Fan.
Erection of Cable Trays ( M.S. & G.I.)
Cable Scheduling, Cable laying on cable
trays & in trenches. Cable Glanding & Cable
End Termination.
June 1993 - June 1994 : Bhartia Cutler Hammer Limited- Faridabad,
Haryana, India
One Year Inplant Training as a Trainee
Engineer-Design/Estimation
Costing-Electrical Projects. During my
training and on job experience, I have
gained the knowledge & exposure in different
fields which is as follows:
PROJECTs: PCC, MCC, PDB, CRANE CONTROL,
PGR/CGR, Auto Transformer Starter,
Star-Delta & S/R Starter Panels etc.
PRODUCTS: Contactors, Overload Relays &
Timers etc.
TESTING : MCC, Brakes & Brake Panels.
EXTRA KNOWLEDGE : Implementation &
Administration of SAP.
SOFTWARES : Microstation V8, ETAP 6.0, Navisworks,
ACAD2012, Microsoft Office, C, C++,Visio,
RELUX, Luxicon, Lumen Micro (Lighting Design
Software)
Languages and Degree of : Speaking Reading Writing
Proficiency
English Excellent Excellent Excellent
Hindi Good Good Good
Declaration:
I hereby declare that all the above information's are correct and complete
to the best of my knowledge and belief.
Date: / / Place: Gurgaon
(Birender Kumar Pal)
[pic]