|
Resume alert |
Resumes 71 - 80 of 109 |
Moreno Valley, CA
... Operate sewer cleaning equipment, measure excavation sites Withdraw cables from pipes and examine them for evidence of mud, roots, grease, and other deposits indicating broken or clogged sewer lines. Clean and repair septic tanks, sewer lines, or ...
- 2012 Oct 12
Moreno Valley, CA
... broken windows, roofs, building structures, floors, hand rails, stairs, lighting systems, HVAC units, electrical units/service plumbing/sewer systems, metal fabrication, etc.) for the purpose of ensuring that items are available and in safe working ...
- 2012 Oct 05
Mentone, CA, 92359
... CITY OF PHOENIX, Phoenix, AZ 2003 – 2005 City Of Phoenix Inspector City inspector accountable for civil Right of Way permits issues within city Right of Way, e.g., water, sewer, electrical, structural, and concrete and asphalt paving. Inspections ...
- 2012 Sep 04
Yorba Linda, CA, 92887
... * Study job specifications to determine appropriate construction methods after reviewing existing condition plans, proposed grading and drainage plans, sanitary and storm sewer profiles create SWPPP (Storm Water Pollution Prevention Plan). * Write ...
- 2012 Jun 26
Riverside, CA, 92503
... -Experience Replacing, Installing Water/Sewer, Pneumatic and Hydraulic piping systems, PVC/CPVC, Copper, Black and Galvanize Pipe. -Experience Repair, Replace Conveyors electric AC DC, live roller, belt and screw. -Experience working on Silos, Ben ...
- 2012 Mar 23
Corona, CA, 92880
... 2007 Stantec Ontario, CA Design Technician / IT Support /Cad Leader Design Street, Water, Storm Drain, Sewer, On-site & Off-site Grading Survey drafting Cad Support Leader IT and Office Support FEB. 1999 - AUG. 2004 Walden & Associates Irvine, CA Sr ...
- 2011 Jul 15
Corona, CA, 92882
Over ten yrs of service and repair ,sewer -drain cleaning -repair,water heater install-repair,slab leak repair,gas leak repair -install,copper repiping-water main install-repair,kitchen-bath remodeling,faucet-disposal install-repair,tile ...
- 2011 May 26
Moreno Valley, CA, 92553
... $32.5 Million Alameda Corridor Project, construct 50,000 SF Bridge for UPRR, retaining walls, pump stations, storm drain, sewer improvements, and street improvements. $12 Million Sound wall project for Cal Trans along a 6 mile stretch of I-10 $9 ...
- 2011 Feb 10
Mentone, CA, 92359
... MCKEEVER INC., Riverside, CA, 1998 - 2000 Challenged with drafting and organizing tentative maps, grading, sewer and water, storm drain infrastructure, as well as SWPPP and erosion control plans. CURRENT EXPERIENCE Architectural Design Services, ...
- 2010 Dec 15
Riverside, CA, 92508
... China Environmental Engineer o Piping system design: including designs of storm drain, sewer and water pipe. o Hydrology calculation. o Hydraulic calculations. o Wastewater treatment system design. • Sept. 1995 Mar. 1997, Department of Environmental ...
- 2010 Nov 04