Post Job Free

Power Plant resumes in Tiruppur, Tamil Nadu, India

Sign in
Search for: Jobs   Resumes


distance:
Resume alert Resumes 41 - 50 of 85

Quality Engineer Power

Kangayam, Tamil Nadu, 638701, India
... PROJECT IN COLLAGE LEVEL MINI MOTORIZED JACK BY USING SOLAR POWER Jack is mechanical equipment used to lift up heavy loads. ... Tool using sheet IN-PLANT TRAINING Attended One week In-Plant Training program in SUNDRAM INDUSTRIAL PVT LIMITED Tamilnadu. ... - 2019 Nov 02

Engineer Training

Tirupur, Tamil Nadu, India
... Helmet In-Plant & Hands on Training • Attended an in-plant training on Introduction to Industrial Electrical Systems at Larsen &Toubro Switchgear Training Center, Coonoor. • Attended an in-plant training at Tuticorin Thermal Power Station for a ... - 2019 Jul 15

Power Plant Thermal

Tirupur, Tamil Nadu, India
... INDUSTRIAL VISIT: > Hydro Electric Power Plant,Mattur. > Thermal Power Plant,Mattur. > Thermal Power Plant,Ennur. ASPIRATION : To involve myself which I enter in this any field to make me specialized to achieve an Innovative challenge. EXPERIENCE ... - 2019 Jun 26

Power Plant Civil Engineering

Tirupur, Tamil Nadu, India
... Industrial Visit during August 2013 in Power plant Construction, “GAMMON INDIA LIMITED, CHENNAI”. Extra Curricular Activities State Level Under-19 Intra Academy Cricket Match Runners held at Chennai. Represent Intra Department Cricket Match Winners ... - 2019 Mar 30

I doing my job in windfeild as electrica service engineer till now.

Tirupur, Tamil Nadu, India
... RESPONSIBILITIES: Troubleshoots plant electrical problems to determine their cause and recommends options for eliminating such problems. Includes carrying out tests on equipment. Daily power monitoring, calculations and reporting at monthly basis. ... - 2019 Mar 04

Industrial Safety Engineering

Tirupur, Tamil Nadu, India
... Board : State Board Percentage : 84.6 % INDUSTRIAL VISIT Ramco Cements Limited – Virudhunagar Indian Oil Corporation Limited (IOCL) - Madurai Nuclear Power Plant Corporation of India Limited (NPCIL) – Kudankulam Neyveli Lignite Corporation (NLC) ... - 2018 Dec 14

Project Engineer

Tirupur, Tamil Nadu, India
... Working as a project management coordinator in HVAC related projects Worked as a project engineer in the erection of solar power plant in roof top and megawatt projects. EDUCATION B.E (Electrical and Electronics Engineer) 6.1 CGPA (2010 - 2014) HSS ... - 2018 Jun 28

Power Plant Electrical

Tirupur, Tamil Nadu, India
... Industrial Visit and In-Plant Training Dec 2017 I Have got Trained in “230kw TNEB substation for high voltage transmission”at gobichettipalayam. Jul 2015 TNEB Substation at Kalapatty Road in Coimbatore. Jul 2017 Solar Power Plant, Annur, Coimbatore. ... - 2018 Jun 22

Engineering Engineer

Tiruppur, TN, India
... upto 7th Sem) (2011-2012) Autonomous State Board 83% (2012-2015) DOTE 10TH STANDARD BOILER PLANT GIRLS HR.SEC.SCHOOL-TRICHY. ... CO-CURRICULAR ACTIVITIES: PROJECTS: Exhibited a working model on POWER SAVER FOR AUDITORIUM in TECH EXPO’15 in M.Kumarasamy ... - 2018 Jun 09

Maintenance Electrical

Tiruppur, TN, India
... HOSUR, PERIOD : NOV 2014 – JUNE 2016 DESIGNATION: ENGINEER TRAINEE DOMAIN: PLANT MAINTENANCE DEPT (3wheeler-auto section). ... 1000v) Erection of UPS (10kva) for the cpu control panels and pull pit systems Maintenance of hydraulic power pack system. ... - 2018 Jun 05
Previous 2 3 4 5 6 7 8 Next