|
Resume alert |
Resumes 11 - 20 of 60 |
Madhurapudi, Andhra Pradesh, India
... STATUS:UNMARRIED NATIONALITY :INDIAN INTERNSHIP: I done internship at Visakhapatnam steel plant for 15 days I learn basics of electrical and how steel is prepared and how the power is distribution to one another stations EXPERIENCE: FRESHER :
- 2021 Apr 07
Kakinada, Andhra Pradesh, India
... NOV 2017 – FEB 2019) Has Worked in The Planning & Execution of Power Layout, Lighting Lay out and HVAC Lay out Has Worked in ... using Schneider Electric PLc’s” at Visakhapatnam Steel Plant SAFETY TRAININGS Has Done IOSH Programme Conducted by Euro ...
- 2021 Mar 26
Madhurapudi, Andhra Pradesh, India
... Outcome: Typical Yaw Misalignment correction on wind turbines reduces power loss and decrease in major types of loading on wind turbine. Internship / In-plant Training: · Organization / Location: integral coach factory, Chennai · Duration/Period:15 ...
- 2021 Mar 06
Kakinada, Andhra Pradesh, India
... ISOPRENE RUBBER PLANT (IIR). CLIENT:-RELIANCE,JAMNAGAR,GUJARAT. DURATION:-MARCH 2017 TO DEC 2017. •PROJECT # 4:-DECORATIVE PAINTS PLANT. CLIENT:-ASIAN PAINTS,PUDIMADAKA,VISAKHAPATNAM. DURATION:-FEB 2018 TO JAN 2019. WORK EXPERIENCE # 4:-PETRO POWER ...
- 2021 Jan 21
Rajahmundry, Andhra Pradesh, India
... • Lying of Power cables from VFD & Thyristor panels to Pumps, Heaters & Heat Exchangers. • Lying of DCS cables to junction ... • Placing the field instruments and piping them in Coal to Methanol Plant as per the P&Id diagram. PROFILE SUMMARY: • Hands ...
- 2020 Dec 10
Kakinada, Andhra Pradesh, India
... Engineer Period : May 2002 – May 2003 Name and Location of the : APGENCO (Srisailam Power Plant) Employer under M/s. Control & Switch Gear Company, New Delhi Roles and Responsibilities : 1. Bus Duct Erection (Segregated Phase Bus Duct & lsolated ...
- 2020 Dec 08
Peddapurapadu, Andhra Pradesh, India
G G D V Sai Pavan M.Tech (Power Electronics), IIST Address: D No: 3-198, Ramalaya street, Peddapurappadu, Andhra Pradesh, ... Implemented PI and hystersis controllers on rst order RC plant. Implemented Digital Filters(FIR and IIR). Implemented the ...
- 2020 Dec 02
Kakinada, Andhra Pradesh, India
... project manager and clients Keeping records for material reconciliation SOFTWARE KNOWLEDGE: AUTOCAD 2D / 3D CATIA MS OFFICE INDUSTRIAL EXPOSURE: Attended industrial training at Thermal Power Plant, Visakhapatnam Steel Plant for a period of 15 days. ...
- 2020 Nov 29
Pamarru, Andhra Pradesh, India
... PROJECTS: Street lights poles Erection and Commission on MEENASHI POWER PLANT(1000MW) as project Head. As an support Engineer for Stacker Cum Reclaimer Machines Electrification. Erection & Commission of Transformers up to 10MVA & 6.6 KV Switch gear ...
- 2020 Nov 16
Kakinada, Andhra Pradesh, India
... 02/2005 - 01/2008, Raigarh, Chattisgarh Looked after both the departments daily maintenance activities in which highly involved in M/S ABB PLC & DCS systems along with waste gas recovery, F BC boilers based 16 MW power plant instrumentation systems. ...
- 2020 Nov 11