CURRICULUM VITAE

Name : B. AMRUTHARAO

Date of Birth : 18-06-1969

Profession : Electrical Engineer

Marital Status : Married

Nationality : Indian

Total Years of Experience : 20 years

KEY QUALIFICATION :

20 years of experience in the Construction, Erection and Testing and commissioning (All Electrical works)

Quality control of Electrical, Instrumentation, Mechanical and also civil works at in projects and industrials(Testing of Input materials) Role playing in QA/QC activities.

Role playing at TAS(Trade Assurance Service) inspection also.

EDUCATION :

Name of the Exam / Course

Main Course of Study

Year of Passing

College / University

B. Tech

Electrical and Electronics Engineering

2000

S.V.H. College of Engineering, Machilipatnam, Nagarjuna University

EXPERIENCE: 20 years

Working as a QA/QC engineer (consultant) at Petro -6 engineering construction private limited(Electrical and instrumentation works and mechanical works and also civil works)

Project : Construction of Elevated Flare System at Endamuru

Installation of Rajahmundry-Asset-East Godavari district,A.P

Client. : ONGC

Responsibilities : Consulting and project management, Quality controlling,QA records, documents which demonstrates achievement, verify effective operation of quality system viz..

1. Inspection Reports/Test Data

2. Inspection and Test plans

3. Validation Reports

4. Audit Reports

5. Material review Reports

6. Verified Calibration Data

served as free lancer at TUV-SUD

served as free lancer at M/s Vincott International India

served as free lancer at APAVE

Apartment’s electrification contract works in MUPPA Homes and other contract works, Hyderabad from 2015 to 2016.

Worked as a QA/QC engineer(Electrical and instrumentation works and mechanical works and also civil works)

Project : Lift Irrigation Scheme - MGJLIP(Mahatma Gandhi Jawaharlal Lift Irrigation project) at nettampadu and koilsagar in Mahabubnagar District.

Client : AP Irrigation (I & CAD)

Served as Sr Executive (QA/QC engineer) SGS India Pvt. Ltd. Hyderabad

A.Job Title / Position Held : Sr Executive

Period : April 2008 – June 2015

Name and Location of the : SGS India Pvt. Ltd. Hyderabad,

Employer Andhra Pradesh

Roles and Responsibilities : 1. Providing Quality Assurance as per IS, ASME and ISO standards for Domestic and International Customers.

2. Inspection and testing of all Electrical Equipments

3. Evaluate and oversee the Quality Assurance plan Analyse the Quality of work with reference to field test results and lab results for irrigation projects, industrial services and as well as TAS (Trade Assurance Services)

4. Execution, Construction, Maintenance & Supervision (QA&QC) for new RO’s & Existing RO’s (Retail Outs) including all civil works and erection of mechanical works

DETAILED TASKS ASSIGNED :

Inspect the source of materials

Inspect the plant operation

Inspect on site construction works

Prepare records of inspection results

Review calibration of testing equipment

Review performance of QA testing, Acceptance testing etc.

Witnessing of Acceptance tests

Review Calibration of testing equipment and testing acceptance

Preparing on conformance and corrective action reports and prevent action reports

Compliance reports and action taken etc.

Preparing Quality and clearance notes. Report of findings and release notes.

Carry out process, product audits and implement corrective actions as necessary

Prepare internal audit and conduct auditing as part of ISO 9001 requirement

Key Deliverables

Execution, Erection Testing & Commissioning

Roles & Responsibilities:

Handling Foundation, erection, Testing & commissioning for various different electro-mechanical equipments.

Execution of Synchronous Motor (6No’Sx17MW) Foundation, Erection, Testing and commissioning.

Foundation, Erection, Stringing and Commissioning of 220KV Transmission Tower Lines (Length: 240Km)

315KVA, 500KVA, 25MVA & 30MVA Station & Motor Transformers & 11KV Distribution Board Erection, Testing and commissioning.

Foundation, Erection, testing and commissioning of 220/11KV Sub Station (6No’s of Bays)

The Protection system of 220/11 KV switching station, routines, breakdown maintenance and erecting of new equipment work carried out.

Static Frequency Converter Testing and commissioning, for Running of 6X17 MW Pump.

Co-ordination with Client to provide solutions for deviations on the equipments and to ensure that all standard requirements are met.

Responsible for incoming materials inspection in storage are with respect to approved Specification and Quality Assurance Plan.

Establishing quality standards, implementing stringent quality control systems to enhance quality of products & environmental conditions.

Supervising the overall site planning and Equipment mobilisation Preparing and maintaining daily progress reports and sending it to the Client.

Creating Daily & monthly Progress Reports including the review status

Preparing Client RA Bills and back-up reports giving clarification to departments for releasing the Quality Certificate.

Review inspection reports, material certification & calibration of testing equipment.

Preparation of nonconformity report of corrective action reports (CAR), preventive action reports, and compliances reports of corrective actions taken.

Attending Inspections for visually inspecting and Marking of defect location if any.

Witnessing of QA testing, Acceptance testing etc.

Coordinate Quality control activities of both contractor’s QMP and consultant’s QAP.

Submit copies of all documents and records to the engineer-in-charge periodically (fortnightly/monthly).

B.Job Title / Position Held : Shift Engineer

Period : June 2003 – March 2008

Name and Location of the : M/s. APTRANSCO, Payakraopeta

Employer Visakhapatnam Dt., Andhra Pradesh

Roles and Responsibilities : 1. Operation & Maintenance of 130KV Switching Station (sub station

2. Supervising the overall site planning with close monitoring and Equipment/ material mobilisation.

3. Preparing and maintaining daily progress reports and sending it to the DE Office.

4. Preparation of fortnight & monthly Progress Reports including the review status.

5. Preparation of Monthly power consumption (Import & Exprot)

6. Issuing the clearance for rectifying the faults to the authorized persons.

7. Charging the tripped circuit breakers immediately so as to maintain the uninterrupted supply

8. Checking the pressures of the circuit breakers, checking the temperatures and oil levels of the transformers, monitoring the loads and noting the hourly readings, Maintenance of Battery Charger (2.2 volts)

9. Maintenance of Substation earthing

C.Job Title / Position Held : Sr. Engineer

Period : May 2002 – May 2003

Name and Location of the : APGENCO (Srisailam Power Plant) Employer under M/s. Control & Switch Gear

Company, New Delhi

Roles and Responsibilities : 1. Bus Duct Erection (Segregated Phase Bus Duct & lsolated Phase Bus Duct), Ability to give qualitative output with presenting and cope up with the workload, ability to work under pressure, stress and meet deadlines, ability to work in team with high level of involvement.

D.Job Title / Position Held : Site Engineer

Period : April 2000 – April 2002

Name and Location of the : M/s. BSES (C.D) Andhra Limited,

Employer Samalkota Through A.K. Constructions

220 MW Combined Cycle (Power Plant)

Roles and Responsibilities : 1. Laying of earth mats and switch yard foundation, earthing

2. Switch yard erection and commissioning

3. Cable Laying and terminations all types of electrical equipments

4. All types of transformers erection and testing

5. 6.6 KV panel boards erection and commissioning

6. 11 KV, 33 KV, 132 KV, 220 KV substations and tower lines foundation, erection, string and commissioning.

Material Description

Seller/Manufacture

Client Customer

Surge arresters 30KV, 10KA Class 2 336KV, 20KA Class 4

M/s. Obulum Electrical Industries Pvt. Ltd. Hyderabad

Kerala State Electricity Board Ltd. Thiruvananthapuram

220KV/90KN, 220KV/120KV Polymer Disc Insulators

M/s. Phoneix Electrical Insulating, Materials Co. Pvt. Ltd

M/s. Welspun Wind Project

4000A Indo or Outdo Bus Duct

M/s. Nandini Enterprises Hyderabad

M/s. Kolahapur Municipal Corporation 76MLDSTP Kolahapur Project

100KVA, 30/0.4 Transformers 3 Phase

50KVA 30/0.4 KVA Transformers 3 Phase

25KVA 30/0.4 KVA Transformers 3 Phase

M/s. Voltech Manufacturing Company Limited, Sreperumbudur, Kanchipuram

Rwanda Energy Group Limited, Kigali Rwanda

Main PMCC Pannels ASFC Pannels (indoor)

Nandini Enterprises, Hyderabad

Kolahapur, Municipal Corporation, pumping Station

Power Cables and Control Cables

Gloster Cables Limited, Hyderabad

M/s. Siemens Limited, Project – EBOP and EDAC Meenakshi TPP 3x350 MW, Thermal Power Project

Power Cables and Control Cab les

Power Cable Limited, Hyderabad

Rwanda Project

132 KV Isolators and accessories

GR Power Switchgear Limited

M/s. Mahindra EPC Service Pvt. Limited

The above mentioned companies were attended inspection, testing’s and also trading activities.

IT Skills :

M.S Office

Languages

Language

Read

Write

Speak

Understand

Hindi

Good

Good

Good

Good

English

Good

Good

Good

Good

Telugu

Good

Good

Good

Good

Personal Profile :

Name : B. AMRUTHARAO

Father’s Name : B. Subbarao

Date of Birth : 18-06-1969

Sex : Male

Marital Status : Married

Nationality : Indian

Permanent Address : Near Ambedkar Ghat

Jaggampet Post & Mandal

East Godavari District – 533 435

E-mail ID : adigje@r.postjobfree.com

Passport : Available

Mobile No : 986-***-****

Languages Known : Telugu, English and Hindi

Certification :

I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describe my qualifications, my experience, and me.