Post Job Free

Power Plant resumes in Madhya Pradesh, India

Sign in
Search for: Jobs   Resumes


Resume alert Resumes 41 - 50 of 172

Microsoft Office Power Plant

MP, India
... Involve in rework of vehicle DESIGN & COMPUTER SKILLS Diploma in Computer Application Autocad Microsoft Office Word, Microsoft Office Excel, Microsoft Office Power Poin SAP (Systems Applications Products) CHIEVEMENTS Visiting in hydro power plant ... - 2017 Dec 03

Maintenance Engineer

MP, India
... To ensure defined operation parameters – Generation, Machine Availability, Reactive Power, Line Loss should be achieved ... In plant Training In plant Training in NCL (Northern Coalfields Ltd.) Singruli from 10-07 -2012 to 24 - 07-2012. Academic ... - 2017 Nov 30

Civil field work

MP, India
... Nagar, Warthi • MS.CREST STEEL & POWER (P) LTD.Joratarai,Durg (GROUP OF (Bhandara Road) TSPPL) Tahshil- Mohadi, Post: Asst.engineer Dist- Bhandara (MS) Pin-441905 Project: (3x350TPD Kiln Project, 105 MW Power Plant,Coal washery, Pellet Contact No ... - 2017 Nov 28

Engineer Power Plant

MP, India
... Organizational Experience: Total Experience of 8 years in Power Plant Desk & Field operation (Turbine & its auxiliaries) Current Work Experience: Hindustan Power Ltd. Anuppur, Madhya Pradesh (2x600 MW) Deputy Engineer O & M (Oct. -2014 to Till Now) ... - 2017 Nov 18

Power Plant Engineer

MP, India
... Provided major services at Jindal Steel & Power Ltd ( 4* 250 MW ), Jindal Power Ltd. As well as coal washery Plant Raigarh [ C.G] Lanco Amarkantak Pvt. Ltd ( 2 * 300 MW), Urga [ C.G]. Vedanta Aluminium Company Ltd. ( 9* 135 MW ) Jharsuguda [ Odissa] ... - 2017 Nov 16

Power Plant Electrical Engineering

MP, India
... Vocational Training: Vocational training at Satpura thermal power plant (MPPGCL) SARNI, Distt.- Betul(M.P.) Competencies Fast learner, Adapt well to changes and pressures in workplace. Work effectively with diverse groups of people. Self motivated ... - 2017 Nov 07

Maintenance Mechanical Engineer

MP, India
... To ensure designed temperature & RH is available in the plant. To ensure the minimum breakdown of HVAC systems and Plant ... no chain- Pedal system and seat, Utilize Men power to run and can also used as exercise equipment ACADEMIC PROFILE B.E. ... - 2017 Nov 05

Power Plant Engineer

MP, 484117, India
... Power Plant division 70 TPH CFBC boiler from 2 september 2017 to till date 2. Worked as (Graduate Engineer Trainee) operation in shree Nakoda ispat ltd,siltra Raipur C.G.power plant division 70 TPH CFBC boiler from 1 september 2016 to 1september ... - 2017 Oct 28

Mechanical Engineering Welding

MP, India
... CGH, 2 years of in hand experience with immense achievements in various field like in welding of stainless steel, plant piping, power piping, construction. (25/12/2015 to till date) 2. Worked as Assistant Professor in the department of mechanical ... - 2017 Oct 25

Engineer Plant

MP, India
... Attached with all types of operational activities in LIME CALCINATION PLANT area as a process, to maximize of production. TOTAL EXPERIENCE: -7. 03 years. Present Employer: - BHUSAN POWER & STEEL LTD, Sambalpur, ODISHA (11th Dec 2009 to Till Date) ... - 2017 Oct 20
Previous 2 3 4 5 6 7 8 Next