Resume alert |
Resumes 11 - 20 of 694 |
Riyadh, Saudi Arabia
... Ltd., Jizan Riyadh Qurayyah as Site Construction Manager Growth Path: Sep’08 to Jun’09: Site Construction Manager Project Qurayyah Combined Cycle Power Plant at Qurayyah Saudi Electrical Company (SEC-COA) Jan’07 to Aug’08: Construction Manager ...
- Apr 24
Riyadh, Saudi Arabia
... Value Engineering: Optimized Grey Water Treatment Plant and reduced cost. Revised the Elevator Pit Drainage system and reduced the number of Pumps required. B. Identified major design errors and deficiencies and provided timely advice and guidance ...
- Apr 23
Riyadh, Saudi Arabia
... that resources were allocated and tasks were completed on time ACE ENGINEERING (UNDER ABENOR )-(WAAD AL SHAMAL POWER PLANT) TURAIF, Northern Province SITE INCHARGE 04/2017 - 03/2018 MOHD MURTUZA ALI ANSARI 055******* ad44bm@r.postjobfree.com ...
- Apr 19
Az Zahra, Riyadh, Saudi Arabia
... • Executed Installation of conduits, cable trays, switches & sockets, power outlets, MV/LV/Control/Telecom/Instrumentation cables for new and existing loads to substation, switchyard, and plant process areas, generator building, SSD lighting, Page 4 ...
- Apr 19
Riyadh, Saudi Arabia
... L&T 2X700MW Supper Critical Thermal Power Plant Rajpura Punjab 16-06-2011 30-09.2015 Planning Assist. 2. L&T RGGVY Project Aligarh U.P 08-10-2015 28.06.2016 Planning Assist. 3. L&T RGGVY Project Aligarh U.P 28.10.2016 09.06.2017 Store Assist. 4. L&T ...
- Apr 15
Riyadh, Saudi Arabia
... , Power Plants, Electrical Substations of 132/33/11kV, SNG & LPG Gas System, District Cooling Plants, Sea Water Desalination Plant, Reverse Osmosis (R.O) Plant, Potable Water, Waste Water/ Sewage (both Vacuum and Pressure Lines) Treatment Plants, ...
- Apr 09
Riyadh, Saudi Arabia
... • Monitor & review plant operations, product margins, process losses, capacity utilization, operational efficiency, cost allocations, stock levels, maintenance costs, etc. 4-4 Professional Skills Personal Skills • Determine break-even for products, ...
- Apr 09
Riyadh, Saudi Arabia
... Installation of DAS Headend to include DC Power Plant, Alarms, CPS etc. Keeping customer and company informed of progress of installation. Communicating and coordinating with customer and company related to specific safety, local code and company ...
- Apr 07
Riyadh, Saudi Arabia
... RIYADH KSA Project: Power Plant (PP-13) Dhurma Riyadh CLIENT: Worley Parson (Saudi Electricity Company) RESPONSIBILTITIES Review of contract documents and scope of work to outline technical QA/QC requirements of the project. Complete visual ...
- Apr 02
Riyadh, Saudi Arabia
... Assignment Located in Cairo Plant 6th of October City. 6. Spare parts technical buying at P&G (Nov 1988-Jan 1996) Assist Buyers in execution on buy plans and update buying range plan for the assigned department/category Prepare reports/ other ...
- Mar 25