|
Resume alert |
Resumes 111 - 120 of 269 |
Pasadena, CA
... Some Design Done Plough Design, Ramp and Stinger Design, Barda II General Arrangement, Beach Pull General Equipment Set-Up, Beach Pull Sequence Drawing, DLB General Arrangement Drawing, Pipe Load-Out and Stacking and Sheave Design and Details BONGA ...
- 2016 Jul 16
Pasadena, CA
... & FABRICATORS (L&T INDIA) 6g Tig & Arc Welder 22-04-2016 to TILL THE DATE I had worked under Manufaturing industries at during construction in above unit their work in Butt joint, socker joint (P11, Pg) of pressure vessels pipe welding etc. ...
- 2016 Jul 12
Los Angeles, CA
... Westlake Village, CA Design boiler systems, electrical wiring diagrams, pipe sizing and design. Responsible for outside sales in Southern California, sales volume still remains the highest of all outside sales engineers. Project Involvement: ...
- 2016 Jul 11
Pasadena, CA
... Duration : Six Weeks (17-06-2014 to 28-07-2014) Description :During training period I received training in Pipe Shop, Traction Motor Shop, Sheet Metal Shop and Subassembly Shop of railway engine. 2) Organization: HINDALCO, Renukoot. Duration : 30 ...
- 2016 Jun 28
Los Angeles, CA
... SKILLS: LATHE MACHINE, GRINDER, STICK WELDING, TIG WELDING, MIG WELDING, PLASMA CUTTING, SKILL SAW, BAND SAW, PIPE AND TUBING THREADER.ALL TYPES OF FORKLIFT EQUIPMENTS. EDUCATION: 2008 SOUTHEAST ROP, NORWALK, CA AUTOMOTIVE 2 YEARS 1998 COLUMBAN ...
- 2016 Jun 20
Los Angeles, CA
... Prepare and teach courses in the Welding Program including titanium welding, gas tungsten arc process, gas metal arc process, shielded metal arc process, flux core process, and other related subjects (metallurgy, welding inspection, pipe layouts, ...
- 2016 Jun 13
Pasadena, CA
... Registered civil engineer with over ten years of experience in public works and private consulting in Phase I and II site assessment, biofilteration, water quality, TMDLs, environmental impact reports, sewer pipe design, sewer area studies, pavement ...
- 2016 Jun 10
Los Angeles, CA
... Experience Apprentice Electrician December 2011 to Current Land Mark Electric Canoga Park, CA Under Ground,Deck Work,Bend Pipe,Pulls Wire,Read Blue Print,Boxing Crew,Wiring Layout,Roping,Make-up for switches,outlets,Lighting,Install Panel ETC. ...
- 2016 Jun 07
Pasadena, CA
... Conduct pipe work, Marking for electrical drawing, wiring, DB dressing, TEL & TV wiring and external electrical lighting. Installation for landscape electrical tray and drunking working for basement, panel board wiring The Peteration (2002-2004) The ...
- 2016 Jun 04
Los Angeles, CA
... • Analyzed 1/8 part of an intersection pipe under different load (including force, pressure, thermal load) using ABAQUS. • Programmed in MATLAB to apply finite element analysis on the same part under the same conditions. The difference between the ...
- 2016 May 30