Charlestown, IN
... reviews with customers • Tool design reviews with vendors • Management of tool build • Attend mold trial, provide trial reports and feedback to customer and manufacturing site • Management of tool at manufacturing site through PPAP approval and SOP. ...
- May 29
West Lafayette, IN, 47906
... Drove APQP deliverables including DFMEA, PFMEA, Control Plans, Process Flow Diagrams, and PPAP submissions, ensuring compliance with IATF 16949, OEM quality standards, and customer-specific requirements. Performed structured risk assessments using ...
- May 26
Kuala Lumpur, Malaysia
... Validate process result from validation activity with ISO13485, and ASTM medical standard 7 SKILLS Prepare/Establish Documentation &other abilities: • Basic PPAP & APQP knowledge (Attend training) • PFMEA/Control Plan/Risk Assesment • Non ...
- May 25
Wheeling, IL
... Lean 6 Sigma, Manufacturing ISO-9001-2015 AS9100 ISO-14001 ISO-45001, ISO-13485 21 CFR GMPs IATA 16949 PPAP APQP SPC DOE TQM 5S Kaizen TPM GD&T GR&R NPI QMS IMS 8D 5-Why Ishikawa Cpk Ppk Communication Skills KPI Voice of the Customer IMS Continuous ...
- May 20
Seattle, WA
... and graphs, aluminum structural framing, SPC, GD&T, Excel, Power Point, ISO9000-1, ISO2008, Process Risks PFMEA, QS9000, APQP, PPAP, MRB, ISO/TS16949, AS9100, BAC, ASME, SAE, SAP, TABLEU, 5S, 8-D, EDM, 5-Whys, Continuous Improvement, IVT process, ...
- May 19
Wheeling, IL
... Lean 6 Sigma Manufacturing ISO-9001-2015 AS9100 ISO-14001 ISO-45001 ISO-13485 21 CFR - GMPs IATA 16949 PPAP APQP PSW SPC DOE TQM 5S Kaizen TPM GD&T GR&R NPI QMS IMS 8D 5-Why Ishikawa Cpk Ppk Communication KPI Voice of the Customer IMS Continuous ...
- May 18
New Delhi, Delhi, India
... • Lead NPD activities (PTR, PPAP, MPT), achieving first-time-right results and reducing time-to-market by 20%. • Drive productivity and cost improvements through VA/VE and low-cost automation initiatives. • Provide customer support through rejection ...
- May 17
Fort Wayne, IN, 46808
... Jul 2006 — Sep 2007 Launch Manager, Plastech Engineered Components Monroe Managed plant launch activities including tool trials, S1 builds, PSO events, AAR approvals, and PPAP submissions. I am partnered with program management and manufacturing ...
- May 14
Chennai, Tamil Nadu, India
... • Drove Engineering Change Management (ECM), APQP, PPAP, DFMEA/PFMEA, and supplier quality improvements using Windchill and SAP ERP, reducing part rejection rates by 30%. Professional - Supply Chain Management (SCM) Ichor Systems, Coimbatore 10 Sep ...
- May 02
Tempe, AZ
... Accelerated PPAP approvals by one week by aligning APQP deliverables including PFMEA, Control Plan, MSA, and GR&R with customer audit standards, improving compliance readiness and reducing approval delays. Reduced rework and scrap by 12% by applying ...
- May 01