Clover, SC
... International Nutritionals, Delhi, NY Project Manager & Process Engineer, Inchem Corporation, Rock Hill, SC Process Engineer Boiler Engineer Project Engineer Environmental Manager, Millennium Chemicals, Baltimore, MD Environmental Engineer & Plant ...
- Jul 10
Al Dafna, Qatar
... Centrifugal pump (Ebara &Flowserve & Friatec & Sundye & Nuovo pigeon) Experienced in assembling and dismantling of pumps (Sulfur Feed Pump), Sump Pump (vertical) Boiler feed water pumps, cooling water pumps, Crude and Vacuum Residue pumps, Pump ...
- Jul 10
Red Hook, NY, 12571
... Heating: boiler installations in commercial and residential settings including piping of baseboards; wiring of boiler systems including thermostats, circulators, and zone valves; steam - boiler heating system installations including all plumbing ...
- Jul 10
Visakhapatnam, Andhra Pradesh, India
... Boiler First class. WORK EXPERIENCE: Working as a First-class Boiler Operator, in Dr. Reddy’s labs ltd FTO-7 through Armstrong international pvt ltd. Duvvada, SEZ, Vizag, From Aug 2020 to Till Date. Worked as a utility & 2nd class Boiler Operator, ...
- Jul 10
Al Khobar, Eastern, Saudi Arabia
... Skids, Pressure Vessels, storage Tanks, Piping, pipe spools, pipe sleeve, Silos, Fittings, Air ducts, Heat Exchangers, Boiler, Fasteners, Machining, Scaffolding, Cladding, Coating, Galvanizing, Oil and Gas Services, CAREER PROFILE Seasoned and ...
- Jul 09
Rochester, NY
... 1995 degree in Naval Nuclear, Operations, Maintenance, Planning US Navy-Ballston Spa, NY Skills • ERP systems (10+ years) • Boiler • Manufacturing maintenance • Mechanical troubleshooting (10+ years) • Hydraulics • Programmable logic controllers • ...
- Jul 08
Anderson, SC
... Detailing of mechanical piping for chiller/boiler rooms, medical facilities, laboratories, industrial complexes, pumping/lift stations and pipelines. Former Experiences: I have over 30 years of experience in a wide range of project/engineering ...
- Jul 08
New York City, NY
... • Managed boiler and oil tank replacement project, gas riser replacement for pre-war co-op building. • Managed replacement of four elevators less and one year. • Union experience with vast knowledge of contract processes. • Implemented and ...
- Jul 07
Newark, NJ
... High school diploma or GED Chester High School-Chester, SC May 1987 to December 2005 12 Skills • Industrial cleaning • Boiler • Distribution center • Microsoft Word • Wastewater • Boom lift • Delivery Driver Experience (5 years) • Pumps (painting ...
- Jul 07
Sugar Land, TX
... ●Performed FTA (Fault Tree Analysis) frequently on boiler and steam turbine shutdown. ●Refurbished Compressor Controls logics & Instrumentation ●Worked frequently on Generator protection tests before actual start up. ●Worked on Diesel Emergency ...
- Jul 07