... Worked on different type of projects like stamping unit, thermal power plant, steel plant, turbo-blower stations, boiler house, water chemical treatment plant, oil industries and automotive industry. Well experience as power user of SAP in PM module ...
- 2013 Jan 24
Toronto, ON, Canada
... Maintenance Mechanic – Millwright "Imperial Flavars Inc".Mississauga Ontariofixed, adjusted, lubricated plant machines as water boiler, pumps conveyors ovens, mixing, cuting and grinding machinesconnected air and water lines to machinesinstalled ...
- 2013 Jan 24
Mississauga, ON, Canada
... and WelderExtensive experience as millwright/mechanic, welder, electrician, steel fabricator, fitter, plumber, HVAC & Boiler experience and maintenance supervisor Good communication and interpersonal skills developed through working in teams ...
- 2013 Jan 24
Toronto, ON, Canada
... skillsPunctual, reliable, and hardworkingLanguages, fluent in English and Farsi WORK EXPERIENCE Gas Pipeline Welder Fitter/ Boiler& Boiler Room Assembly, (Sub Contractor) 2002-2010 Nekison Engineering & Contractors Ltd., Toronto Welded gas pipelines ...
- 2012 Dec 06
East York, ON, M4C 1L5, Canada
... < Extensive experience with high pressure boiler operations, water treatment plant operations, chiller and HVAC operations. < Proficient in budgeting, cost control and human resources related tasks such as payroll, staffing and recruitment. < ...
- 2012 Nov 18
Ajax, ON, Canada
... plant wide Safety & Quality work group meetings for cost and process improvements • Schedule vendors and repairs on Forklifts, machinery, motors, steam boiler and HVAC systems • Access machine risks and implement safety mechanisms to reduce ...
- 2012 Nov 15
Toronto, ON, Canada
... Managed intensive boiler and incinerator field studies and assessments, including a quarter-million dollar short-term high-intensity process and combustion field study and data analysis at a 400 TPD energy from waste plant. Coordinated the Best ...
- 2012 Nov 11
Toronto, ON, Canada
... Boiler, compressor & pump rooms in a shed attached block of 6.0m width, 45m length & 4.0m height. Resin blower & raw material feeding rooms in a shed attached block of 6.0m width, 15m length & 4.0m height. Spare parts store (5.7m W X 30.0m L X 5.0m ...
- 2012 Oct 25
Brampton, ON, Canada
... analyzed fossil boiler failures and other technical problems at site and implemented practical solutions based on Design & Stress Analysis. Addressed non-conformances from job floor and dispositioned them based on ASME Code and/or sound engineering ...
- 2012 Oct 21
Toronto, ON, Canada
... of the Boiler and Pressure Vessel Codes and Standards as referenced by CSA, ASME, MSS, API, ISO, etc.Computer Skills: FEA, Solidworks, Compress Build 6252, MathCAD, Visio, MindJet, PaperPort, Excel, PowerPoint, Word Perfect, Microsoft Word, etc. ...
- 2012 Oct 05