|
Resume alert |
Resumes 61 - 70 of 124 |
Santa Clarita, CA
... • Receiving, First Article, In-Process, & Final Inspections • Inspection of machined parts, receiving inspection of vendor items, components, PCBA'S, Power supplies, wire harnesses, pressure transducers, and ceramic substrates, Sub-assemblies, & ...
- 2014 Aug 11
Burbank, CA
... Drafted patent prosecution document including Restriction Requirement, Non-Final, Final, Pre-Appeal Brief, Appeal brief, Reply Brief, ADS, IDS, AA with RCE, Response to Article 19 & 34, Amendment After Allowance and Instructional Letter to foreign ...
- 2014 Aug 06
Los Angeles, CA
... • Approved first article reports which included special processes and purchased metals and materials besides dimensional and test reports. • Facilitate training via presentations with Power Point. CMM Inspector Programmer February 2011 to March 2012 ...
- 2014 Jun 11
Santa Clarita, CA
... Conduct First Article Inspections (FAI), Production Part Approval Process (PPAP) and Final Inspections. . Monitor Quality Objectives at all levels. . Control, evaluate, and dispose of non-conforming material. . Perform internal process and quality ...
- 2014 May 13
Santa Clarita, CA
... Chatsworth, CA 91311 Dates: 11/03 to 08/05 Duties: Inspection of manufactured products, verification that product and documentation are in compliant to blueprints, performing and recording first article inspection of received products and ...
- 2014 May 08
Los Angeles, CA
... me personal as well as professional growth 02/13 –Current E ncore composite B rea CA QA Final Inspection Perform first article inspection, in-process inspection, receiving inspection, f inal inspection AS 9102 F.A.I, ASME-Y 14.5, MIL SPEC & GD&T ...
- 2014 Apr 30
Santa Clarita, CA, 91350
... o QA inspection of first article machined parts and assemblies o Hands-on experience in building, planning and design of tooling. Commercial experience o Manufacturing management, planning and supervision in production and custom manufacturing ...
- 2013 Aug 07
Simi Valley, CA
... Revised engineering drawings to meet ANSI standards and to reduce misinterpretations by suppliers, resulting in 60% reduction in First Article Sample errors. TRW Space and Defense Technology Redondo Beach, CA 1997-2000 Design and Development ...
- 2013 Jun 15
van nuys, CA, 91405
... Ability to adjust controls amd change tool settings in order to keep d imensions Within specified tolerances for first article using caliper to mearure parts Ablity to read and understanding sheet metal drawing in manufacturing p rocess Able to ...
- 2013 May 30
Simi Valley, CA
... RECEIVING, IN-PROCESS, FIRST ARTICLE AND TEST INSPECTION. TIP QA DATA BASE. 13. ESD Control per S20.20. Calibration per ANSI-Z-540/ISO 17025. 14. Establish and maintain closed-loop corrective action programs. 15. Supplier sourcing, rating, auditing, ...
- 2013 May 18