1. Position Details
Field
Details
Designation
Assistant General Manager (AGM) – Construction
Department
Projects / Construction
Company
Melhor Group
Projects
Melhor, Mirante and Mistura
Location
Goa
Reports To
Director
Direct Reports
Project Managers, Site / Execution Engineers,Billing Engineers, Planning Engineers, MEPEngineers, Finishing Engineers, Site Supervisors
Key Coordination
Purchase Stores, Accounts, Sales CRM, HR,Architects, Consultants, Contractors and Vendors
Employment Type
Full-time, Permanent
Grade / Level
[To be confirmed]
Effective Date
[Date of joining / issue]
Job Description – AGM Construction, Melhor Group
2. Role Purpose
The AGM – Construction is accountable for delivering the Melhor, Mirante and Misturaprojects on time, within budget and to the required quality and safety standards. The roleleads planning, cost control, contractor management, manpower and site supervisionacross all three sites.
The AGM is also expected to build structured execution systems – schedules, reporting,reviews and accountability – so that progress is predictable, risks are raised early andteams are coordinated.
3. Key Responsibilities
3.1 Planning Project Control
Prepare and maintain a consolidated execution schedule (master and micro schedules)for all three projects, with milestones and critical path.
Establish a budgeting and cost-planning framework; track budget vs. actual cost andflag overruns early.
Plan and forecast RMC (ready-mix concrete) requirements in line with site progressand pour schedules.
Review progress against schedule weekly and take corrective action on delays.
3.2 Manpower Team Oversight
Plan, stabilise and optimise labour strength at each site in line with the schedule.
Set clear roles, targets and accountability for every engineer.
Run a defined performance review framework for engineers and site staff.
3.3 Contractor Finalisation Execution Readiness
Finalise and mobilise contractors for all pending and upcoming work packages.
Close pending work orders on priority, including Plumbing (Raju), Electrical (Kirat) andWaterproofing contractors.
Complete BOQ finalisation, quantity validation and execution planning for eachpackage.
Evaluate and onboard new contractors as required, with input from Purchase andManagement.
Job Description – AGM Construction, Melhor Group
3.4 Team Structuring Requirement Planning
Define clear manpower requirements by engineer category: Billing, Planning,Execution, MEP and Finishing.
Prepare project-wise resource plans, using existing team members and upcominghires.
Share structured hiring requirements with HR in time for recruitment.
3.5 Leadership, Systems Execution Framework
Identify risks proactively and escalate to Management in time, with a proposedsolution.
Implement structured reporting formats and standard execution processes acrosssites.
Improve coordination between site teams, contractors, Purchase, Accounts andconsultants.
Drive material finalisation and procurement planning in line with the schedule.
3.6 Site Supervision Quality
Set up site-level supervision and review mechanisms (daily site reviews, weeklyprogress meetings).
Ensure timely closure of execution, quality and safety issues at site level.
Enforce discipline, safety norms and accountability within site teams and contractors.
Ensure work meets approved drawings, specifications and quality standards.
3.7 Monsoon / Heavy Rain Preparedness
Prepare and implement a monsoon preparedness plan for all sites before the season.
Put site protection and material safety measures in place, including covered storage.
Plan drainage, dewatering and water management at each site.
Re-sequence execution activities to suit weather conditions and protect timelines.
4. Key Deliverables Timelines
The first two deliverables are due within 3 working days of issue of this JD; the WeeklyProgress Report is due every Saturday by 6:00 PM.
Job Description – AGM Construction, Melhor Group
5. Key Performance Indicators (KPIs)
Performance will be reviewed against these measures; targets to be set by Managementat the start of each review cycle.
#
Deliverable
Must cover
Timeline
1
Project ExecutionSchedule (all 3 projects)
Milestones, critical path,activity-wise timelines
Within 3 working days
2
Contractor FinalisationStatus Action Plan
Status of each package,pending work orders(Plumbing – Raju, Electrical –Kirat, Waterproofing), closuredates
Within 3 working days
3
Manpower TeamRequirement Plan
Engineer categories (Billing,Planning, Execution, MEP,Finishing), project-wiserequirement, labourstabilisation approach
[Date to be agreed]
4
Monsoon PreparednessPlan
Site protection, materialstorage and safety, drainageand water management,execution sequencingchanges
[Date to be agreed –before monsoononset]
5
System ProcessImplementation Plan
Reporting formats, executionmonitoring, issue preventionand resolution, engineerperformance tracking
[Date to be agreed]
6
Weekly Progress Report(WPR)
Planned vs. achieved,contractor-wise progress,challenges and mitigation,material status, next week'splan
Every Saturday, 6:00PM
Area
KPI
How it is measured
Schedule
Milestone adherence
% of planned milestones achieved ontime, per project
Job Description – AGM Construction, Melhor Group
6. Authority, Interfaces Organisational Support
Authority
Allocate and redeploy engineers, supervisors and labour across the three sites.
Recommend contractor selection, work order award and termination to Management.
Approve site-level execution sequencing, method statements and daily work plans.
Certify contractor measurements and bills for onward processing by Accounts.
Financial approval limits: [As per company Delegation of Authority – to be confirmed].
Key Interfaces
Area
KPI
How it is measured
Cost
Budget adherence
Actual vs. budgeted cost; varianceexplained and approved
Materials
RMC and material planningaccuracy
Forecast vs. actual consumption; no sitestoppages due to material
Contractors
Work order closure andmobilisation
Pending work orders closed by agreeddates; contractor-wise progress vs. plan
Manpower
Labour stability
Planned vs. actual labour strength persite
Team
Engineer performance
Reviews completed on time; targets metby engineers
Quality Safety
Issue closure
Site issues and NCRs closed withinagreed time; zero major safety incidents
Reporting
Reporting discipline
WPR submitted every Saturday by 6:00PM; deliverables on time
Monsoon
Weather readiness
Plan in place before monsoon; minimalrain-related loss of work days andmaterial
Internal
External
Management / Directors
Contractors and sub-contractors
Purchase Stores
Architects and structural consultants
Job Description – AGM Construction, Melhor Group
Page 5 of 7
Organisational Support
The company will support the AGM with the following, based on clear and structuredrequirements shared by the AGM:
Hiring of required engineers.
Contractor onboarding support.
Procurement and execution coordination support.
7. Qualifications, Experience Competencies
Qualifications
B.E. / B.Tech in Civil Engineering (mandatory).
M.Tech / PG in Construction Management or PMP certification (preferred).
Experience
12–15 years in residential or commercial real-estate construction, with at least 4–5years leading multiple projects or sites.
Proven track record of delivering high-rise or multi-building projects end to end –structure, MEP and finishing.
Experience in contractor management, BOQ finalisation, billing and cost control.
Technical Skills
Project planning and scheduling (MS Project / Primavera).
Budgeting, rate analysis, quantity estimation and BOQ validation.
RMC planning, material management and procurement coordination.
Knowledge of IS codes, quality standards and construction safety norms.
MS Excel and structured MIS / reporting.
Internal
External
Accounts Billing
MEP consultants
Sales CRM
Material vendors and RMC suppliers
Statutory and local authorities (as required)
Job Description – AGM Construction, Melhor Group
Behavioural Competencies
Ownership and accountability for results.
Team leadership and people development.
Proactive risk identification and problem-solving.
Clear communication and timely escalation.
Discipline, integrity and firm decision-making on site.
8. Acknowledgement
This JD may be revised by Management as business and project needs change. I have readand understood the responsibilities, deliverables and expectations set out above.